Quarterly Activities Report
Released
Released
Announcement PDF
29 October 2014
ASX ANNOUNCEMENT
SEPTEMBER QUARTER 2014 ACTIVITY STATEMENT
Ventnor Resources Ltd (Ventnor or the Company) is a basemetals focused explorer which has aggressively explored the
historic Thaduna/Green Dragon copper project located 170km
north of Meekatharra in Western Australia.
On 28 November 2013 Ventnor shareholders voted unanimously
for the Company to enter a landmark farm-in and joint venture
agreement with Sandfire Resources NL (Sandfire) in order to
fast-track development and minimise the capital cost to establish
the project.
Under the terms of the agreement Sandfire can earn up to 80%
of Thaduna/Green Dragon by making an upfront payment of $3
million and managing and sole funding a further $6m on further
exploration, feasibility studies, pre-development and, if feasible,
development and toll treatment of ore at Sandfire’s nearby
DeGrussa operation.
Ventnor also holds the Warrawanda nickel project in Western
Australia, 40km south of Newman, and the Georgina Basin
project in western Queensland’s Mt Isa Inlier which is well
endowed with iron oxide copper gold (“IOCG”) systems and
sulphide base metal deposits. Recently, the Company has
applied for a tenement adjacent to the Tropicana Gold Mine
which is prospective for gold.
ASX: VRX
Capital Structure
Shares on Issue 118.3 million
Unlisted Options 1.05 million
Market Cap @ 7¢ a share
$9 million (Fully Diluted)
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
John Geary
Company Secretary
Company Projects
Thaduna/Green Dragon Copper
Project in the Doolgunna
district, WA (subject to SFR
Farm-in)
Warrawanda Nickel Project
south of Newman, WA
Georgina Basin IOCG Project in
western Queensland
Recent application for a
tenement adjacent to the
Tropicana Gold Mine
The Company is actively
assessing other base metal
projects in Australia.
EXPLORATION
Thaduna/Green Dragon Copper Project
Sandfire Farm-In and Joint Venture
Ventnor Resources Limited and Sandfire Resources NL (Sandfire) executed a transaction
designed to fast-track Ventnor’s Thaduna/Green Dragon Copper Project into production
while removing the need for Ventnor to raise additional funding for mine development.
In seeking a JV partner one of the key objectives of the Ventnor Board was to deliver
maximum future value and minimise dilution for shareholders. The Sandfire agreement not
only fulfilled this objective but also represents a unique solution for the Company to secure
the development of Thaduna/Green Dragon with an unrivalled partner in the region.
The key elements of the transaction comprise of a farm-in, funding and toll treatment
agreement with Sandfire to advance the Project to production utilising Sandfire’s modern
production facilities at its DeGrussa Copper Project.
One of the advantages for Ventnor in forming the JV with Sandfire will be the expedited
assessment of the possibility of developing the Project utilising Sandfire’s existing plant and
infrastructure. This will substantially reduce the overall capital required and potentially bring
forward the timing of achieving first production and cash flow by a meaningful period. It will
remove the need for Ventnor to raise substantial finance (either equity or debt) and at the
same time to reduce the risk of project feasibility and development through a farm out and
funding solution coupled with a toll milling arrangement at a low operating cost.
Once in production Ventnor is required to repay its share of the development costs from free
cash flow. Ventnor will then be free to receive what it hopes will be a significant quarterly
dividend from the Joint Venture.
Sandfire initially acquired a 35% interest in the Project by paying $3M upfront directly to
Ventnor. Sandfire can then acquire an additional 16% (total 51%) for the second $3M
tranche, and 29% (total 80%) for the third $3M. The second and third tranches will be spent
directly on the Project.
Ventnor retains an option to acquire Sandfire’s interest if Sandfire fails to commence
production from the Project within five years. The option price is the total amount that
Sandfire has expended to that point in time.
This transaction represents substantial value accretion for Ventnor shareholders by:
Reducing the previous project capital cost estimate of $70M included in the Scoping
Study (completed February 2013) to only the establishment costs.
Sandfire providing all JV funding through to production from contributions and interestfree loans;
Ventnor not incurring additional financing costs to develop the project;
Minimising on-going equity dilution for current shareholders; and
Lower processing costs at Sandfire’s DeGrussa plant because of its higher throughput
rate compared to that contemplated in the Ventnor Scoping Study.
Sandfire has been assessing two development opportunities at the Thaduna Project. An
oxide project, with ore to be treated through the proposed DeGrussa Copper Oxide Heap
Leach and a sulphide project, with ore to be treated through the existing DeGrussa Flotation
Processing Plant.
Since Ventnor’s ASX listing on 24th February 2011 more than 65,000 metres of RC and
diamond core has been drilled at Thaduna/Green Dragon Copper Project with supporting
metallurgical testwork and multi-element assays. All of the project data and surviving core
has been transferred to the Sandfire team.
Sandfire are currently reviewing the project data to validate the existing JORC Resource and
updating the structural model.
Sandfire confirmed the commencement of its first drilling program at Thaduna in May 2014.
The program is planned to provide diamond core for assay and metallurgical testwork, with:
Shallow dipping diamond drilling directly under the existing Thaduna pit;
Nine drill holes for 935 metres with PQ sized core;
Drilling taking approximately three weeks; and
Metallurgical testwork program subject to mineralisation encountered in an expected
transition zone.
Details of the results were announced on 9 September 2014 by Ventnor and Sandfire jointly
providing an update on work undertaken to date at Thaduna/Green Dragon.
Sandfire has completed a series of eight drill holes at the Thaduna project which have been
drilled for metallurgical testwork of the transitional zone under the existing pit.
Of the eight holes, seven encountered mineralisation as reasonably expected in the
transition zone below, and to the north, of the existing open cut (TDDD002 encountered
weak, narrow mineralisation only; verified using field portable XRF). The long section below
shows the location of the drill holes over the existing Mineral Resource as outlined by
Ventnor.
Best results returned from assays include 10.8 metres at 6.6% copper from 72 metres
downhole, 10.6 metres at 2.3% copper from 37 metres downhole and 7.7 metres at 3.2%
copper from 78 metres downhole.
The results were in line with expectations and the information increases the understanding of
the geology and metallurgy of the shallow areas north of and below the existing Thaduna pit.
The sampling and assaying protocols followed were significantly different from Mineral
Resource definition. The samples were selected on lithological boundaries for metallurgical
testing for both the oxide processing potential and processing of sulphide material through
Sandfire’s DeGrussa plant, 40km from Thaduna/Green Dragon.
Some zones of visually weak mineralisation were not analysed. Existing mineralised pulps
will be sent for further analysis and additional QA/QC.
The metallurgical testwork program for Thaduna/Green Dragon is expected to be completed
by the end of the September quarter, with results to follow soon after.
Work completed to date by Sandfire has moved the project forward. It includes:
Re-logging of all core and RC chips (continuing)
Re-surveying of drill holes with high deflection.
Review of database and import to Datashed
Commenced wireframing and modelling of Thaduna
Ongoing metallurgical testwork on shallow holes
Completed rehabilitation requirements
Full tenement DTM survey
Drafting of a project evaluation document
Sandfire has indicated that progress on metallurgical testwork, mineral
resource estimates and mining optimisations, scheduling and costing is on
track for Ore Reserves estimates and a Scoping Study by the end of 2014.
Detailed Information
At the time of commencement of the Joint Venture with Sandfire Resources, Ventnor had
completed 221 RC holes for 29,041 metres with 79 Diamond Tails for 20,485 metres,
totaling 49,526 metres at the Thaduna Project.
On 12 May 2014, Sandfire announced commencement of a drilling program comprising nine
PQ-sized diamond core holes, for 935 metres, targeting mineralisation directly under the
existing Thaduna Pit. These holes were to generate samples for a comprehensive
metallurgical testwork program over the transitional mineralisation. Eight PQ-sized holes
were drilled for 808.5m in total length. Additional shallow drilling would be required to better
define the near surface Mineral Resources prior to any decision to commence mining.
The sampling and assaying protocols followed are significantly different from Mineral
Resource definition. The samples were selected on lithological boundaries for metallurgical
testing. Some zones of expected mineralisation, that displayed only weak, narrow, or no
mineralisation have not yet been analysed.
The assay results received from Sandfire consisted of selected mineralised zones that were
assayed at ALS Global for head assays as part of the metallurgical testwork program. These
assays will not be included in a Mineral Resource upgrade.
Intersections generated from the metallurgical drill hole assays are shown in the table below:
New holes drilled by SFR
Hole Id Easting Northing
TDDD001 772702 7176032
Az
58
Dip
-37
From
77.80
TDDD002
TDDD003
TDDD004
772701
772647
772627
7176032
7176151
7176177
63
58
60
-51
-39
-32
75.98
73.76
TDDD005
772626
7176177
60
-50
91.82
TDDD006
772849
7175841
57
-38
72.58
TDDD007
TDDD008
772530
772513
7176485
7176605
60
248
-55
-56
26.98
36.63
Previous VRX Drilling
THRC017 772848.5 7175856
58
-54
85
To
86.50
DH m Samp. m TW m
Cu %
8.70
7.70
7.08
3.20
incl.
5.20
4.78
4.15
incl.
2.50
2.30
1.22
No samples submitted for TDDD002
76.90
0.92
0.92
0.83
7.13
78.60
4.84
2.86
2.72
3.83
incl.
1.44
1.37
5.40
incl.
1.42
1.35
2.23
99.00
7.18
2.32
2.02
2.85
incl.
1.44
1.25
3.40
incl.
0.88
0.77
1.95
85.94 13.36
10.78
9.70
6.63
incl.
3.06
2.75
9.78
incl.
7.72
6.95
5.38
30.39
3.41
3.41
2.73
2.58
50.97 14.34
10.58
6.35
2.33
incl.
0.53
0.32
1.42
incl.
8.90
5.34
2.48
incl.
1.15
0.69
1.57
91
6
6
5.22
3.19
Ag ppm Type
8.6
12.3 PQ
0.8
PQ
15.9 PQ
6.8
10.3 PQ
3.3
6.9
8.4 PQ
4.3
28.1
23.5 PQ
30.0
0.9 PQ
8.6
10.4
PQ
8.1
11.7
15.6
RC
True Width intersections are estimates from sections.
No samples were selected from TDDD002 as visual indications (verified by hand held XRF)
were of narrow and weak mineralisation.
A cross section presenting the drilling of TDDD006 is shown below to demonstrate the
attitude of the drilling in comparison to the previous Ventnor drilling, which at this shallow
level was typically RC.
The cross section as presented is the southernmost drill hole.
The cross section showing drill hole TDDD006 which has intersected near the top of the
previously modeled Indicated Resource (VRX estimate and VRX generated cross section).
The intersection is wider and higher grade mineralisation than that previously intersected by
THRC017 (VRX) with a visually weak internal zone which was not selected for assay or
metallurgical testwork and may be a result of intersecting a higher grade transitional zone or
a minor splay.
There are two high grade zones separated by 2.58 metres with no samples submitted.
Warrawanda
The Company has continued with the review of data at the Warrawanda Nickel Project and
has re-processed data from the TEMPEST Survey conducted by Geological Survey of
Western Australia (GSWA) and Geoscience Australia (GA) which recently released the final
results of the Capricorn TEMPEST airborne electromagnetic (EM) survey.
The Warrawanda Nickel Project is located 60 kilometres south of Newman, in the Sylvania
Inlier, an Archaean granite-greenstone terrane in the Pilbara region of Western Australia.
The Warrawanda Nickel Project is a 16km-long sequence of steeply-dipping rocks
dominated by ultramafic and mafic rocks with lesser clastic components, including shale.
The rock units intersected are predominantly ultramafic Komatiites with serpentine after
olivine, mafic rocks as well as minor fine-grained clastic rocks and felsic dykes.
Since listing in February 2011 the Company has conducted several exploration programs at
the Warrawanda Nickel Project;
1. Reviewed the historic data which comprises 86 vertical RAB holes; 46 vertical RC holes
exploring for nickel-cobalt laterite deposits in 1996 and 1997.
2. Reviewed chip sampling from 2006 that returned several elevated Nickel (“Ni”), Cu, Zinc
(“Zn”) and Chromium (“Cr”) results and identified a gossan that may be related to
massive sulphide mineralisation
3. Conducted an aerial EM mag survey April 2011 which was processed and identified a
number of conductive, and in some cases co-incident magnetic, anomalies
4. Drilled 13 RC drill holes for 2,494 metres August 2011 with 4 metre composites
extensively assayed for 50 elements
5. Undertaken surface geology mapping and 300 geochem surface samples September
2011 with multi-element assays indicating anomalous Ni, Cu, Zn, Cr and low level gold
6. Acquired HyMap data over the ultramafic sequence March 2012 which provides multispectral data over the Project area
7. Collected another 144 geochem soil and rock chip samples June 2014 over specific
anomalous areas
Field Survey 2014
In June 2014 an on ground geological field survey was undertaken with the expressed
purpose of achieving the following from selected anomalous areas;
•
•
•
•
Extend current soil geochem
Ironstone/gossan sampling and mapping
Ground truth HyMap highlights
Review for potential drilling sites
A total of 144 soils and 49 rock chip samples were collected and analysed with a hand
portable xrf, see image below for the areas that have been sampled.
The assays from the June 2014 field trip have been combined with prior data and present a
compelling exploration target with co-incident base metals anomalies.
Nickel occurrences > 1000ppm Ni
Cobalt occurrences > 500ppm Co
Copper occurrences > 25ppm Cu
Chromium occurrences > 500ppm Cr
As a result of the work completed to date, the increased understanding of the geologic
environment of the Warrawanda project area has confirmed the potential for the presence of
nickel sulphides with a number of potential mineralising systems including Kambalda-style
sulphide nickel and Indian NiFeCo ores.
Black Dragon
New Tenement Application
On 21 August 2014 Ventnor announced a new tenement application, ELA39/1828, adjacent
to the jointly owned Anglo Gold Ashanti/Independence Group Tropicana Gold mine.
ELA39/1828 comprises 42 graticular blocks and has within it the Black Dragon Prospect
which has been the subject of recent exploration. It is the intention of the Company to review
all of the available data and provide further information to the market in due course.
Georgina Basin
No work was undertaken on the Georgina IOCG Project in Queensland. The Company has
been actively seeking JV partners
Competent Person’s Statement
The information in this release that relates to Exploration Results is based on, and fairly represents,
information and supporting documentation supplied by Sandfire Resources NL pertaining to the
Thaduna/Green Dragon Copper Project, and compiled by Mr David Reid who is a Member of the
Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Reid is a contractor to Ventnor
Resources Limited. Mr Reid has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the “2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Reid consents to the inclusion in this
report of the matters based on information provided by him and in the form and context in which it
appears.
CORPORATE
There was no corporate activity undertaken during the quarter.
For further information please contact:
Bruce Maluish, Managing Director
brucem@ventnorresources.com.au
Tel: +61 8 9226 3780
www.ventnorresources.com.au
Media: Warrick Hazeldine/Michael Vaughan
Cannings Purple Communications
Tel: +61 8 6314 6300
whazeldine@canningspurple.com.au
mvaughan@canningspurple.com.au
ABOUT VENTNOR
Ventnor Resources is a base-metals focused explorer with a JV with Sandfire Resources NL at the historic
Thaduna/Green Dragon project, 170 km north of Meekatharra in Western Australia.
The Thaduna/Green Dragon Project is located 40km east of DeGrussa and represents the largest copper
resource in the Doolgunna-Bryah Basin Region outside of Sandfire’s DeGrussa-Doolgunna Project.
Also in Western Australia, 40 km south of Newman is the Warrawanda nickel project. In western
Queensland, the Georgina Basin project lies within the Mt Isa Inlier, which is well endowed with Iron
Oxide Copper Gold (“IOCG”) systems and sulphide base-metal deposits.
The Company has recently applied for a tenement adjacent to the Tropicana Gold Mine in WA that is
prospective for gold.
Known Copper and Nickel Mineralisation
The Thaduna/Green Dragon copper project has historic mine production; copper mineralisation has been
confirmed with four phases of exploration drilling; a Scoping Study has confirmed the economic potential
of the project. A farm-in deal has been transacted with Sandfire Resources to develop the project and to
treat ore. The prospectivity of the Warrawanda nickel project was increased when nickel gossans were
identified in recent work. Further work is planned for 2014.
Proven Management
The Ventnor directors have extensive experience in the management of publicly listed mining and
exploration companies.
The Company is actively seeking and evaluating other base metals projects in Australia.