Highlights:
•
Arrowsmith North total Mineral Resource Estimate
increased to an outstanding 771 Mt @ 98% SiO2, an overall
increase of 398%
•
Resource Estimate includes 248 Mt of Indicated Resource
•
Arrowsmith North silica sand Mineral Resource is
becoming a world class deposit
•
Capable of producing silica sand products suitable for
glass making, foundry and ceramics industries
•
Mining Reserve estimate and BFS underway
VRX Silica Limited (VRX Silica or Company) (ASX: VRX) is pleased
to announce the results of a drill program completed at the
Arrowsmith North Silica Sand Project (Arrowsmith North), located
270km north of Perth, WA.
ASX: VRX
Capital Structure
Shares on Issue:
404 million
Top 20: 47%
Unlisted Options:
72 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
The drill program was undertaken during March 2019 enabling a new
Mineral Resource to be estimated following receipt of analytical
results.
Peter Pawlowitsch
Non-Executive Director
The Mineral Resource Estimate for the Arrowsmith North Silica Sand
Project has been upgraded to 771 Mt @ 98.0% SiO2 including an
Indicated Resource estimate of 248 Mt @ 97.7% SiO2 and an Inferred
Resource estimate of 523 Mt @ 98.2% SiO2. All Mineral Resources
are reported in accordance with the JORC Code 2012 (see Table 1).
John Geary
Company Secretary
VRX Silica Managing Director Bruce Maluish said: “Significantly the
Mineral Resource includes an unpredicted 313 million tonnes of white
sand at 98.7% silica. A high-grade final product can be produced
from the higher-grade feed stock which is in demand for the foundry
and glassmaking industries.”
“This Mineral Resource estimation will now allow the Company to
finalise estimates of Ore Reserves which will support the impending
BFS,” said Maluish.
The Indicated Mineral Resource is predominately within the Mining
Lease application area and the majority is anticipated to convert to
Probable Reserves and hence an extremely long-life mining project.
No more drilling is required before the Company will commence
mining operations. However, the Company will undertake a further
testwork program on the white sand.
Work is ongoing to complete the process for the Mining Lease
Applications and Environmental Approvals at both the Arrowsmith
North and Arrowsmith Central Silica Sand Projects.
Company Projects
Arrowsmith Silica Sand
Project, 270km north of
Perth, WA.
Muchea Silica Sand Project,
50km north of Perth, WA.
Boyatup Silica Sand Project,
100km east of Esperance,
WA.
Warrawanda HPQ Project
south of Newman, WA.
Biranup base metals and
gold Project adjacent to the
Tropicana Gold Mine, WA.
The Company is actively
assessing other silica sand
projects in Australia.
Detailed Information
The information in this announcement refers to the Arrowsmith North silica sand project, which
is located north of Eneabba, 270km north of Perth in Western Australia, Figure 1.
Figure 1:
Arrowsmith North Project Location
VRX Silica had previously reported a maiden Mineral Resource Estimate (MRE) for
Arrowsmith North. 1
During March 2019 VRX Silica commenced an aircore drill program over the area previously
only tested by shallow hand auger drilling. 2 The results of that program for Arrowsmith North
are now available and have been used to update the MRE for the Arrowsmith North Project
and to declare a maiden Indicated Mineral Resource. The estimation of an Indicated Mineral
Resource will allow for a Mining Reserve to be estimated once a positive Feasibility Study is
completed.
The July 2019 MRE has estimated an Indicated Mineral Resource of 248 Mt @ 97.7% SiO2
in addition to an Inferred Mineral Resource of 523 Mt @ 98.2% SiO2 for a Total MRE of 771
Mt @ 98.0% SiO2, an overall increase of 398% on the maiden estimate, see Tables 1 and 2
below.
1ASX announcement of 2 October 2018,“Arrowsmith North Maiden Mineral Resource”.
2ASX announcement of 13 March 2019,“Drilling at Muchea and Arrowsmith Silica Sand Projects”.
The MRE is wholly within granted tenements E70/5109 and E70/5027 which are 100% owned
by VRX Silica. This MRE update is based on the results of the most recent drilling, with the
initial hand auger drilling being used to assist in the model estimation. The model defines two
different sand types, “Yellow” and “White” sand (Tables 1 and 2), which are different with
respect to their chemistry and particle size distribution.
The Arrowsmith Project area has a mining depth limitation to be above the water table which
is 10 metres below the drilling. The MRE has been estimated to a nominal depth well above
the water table and the top half metre of topsoil has been discounted in the MRE as it will be
used for rehabilitation.
Metallurgical testwork completed to-date confirms this updated silica sand model is
considered readily amenable to upgrading by conventional washing and screening methods
to produce a high-purity silica sand product with high mass recoveries. The high-purity silica
sand product specifications are expected to be suitable for industries such as the glass
making, foundry and ceramics industries.
Figure 1 below shows the drill coverage over the tenements with the underlying sand types
shown. The Arrowsmith North Target Area defines the area to which the MRE is constrained
and represents the area where there are no current restrictions to mining.
Figure 2:
Arrowsmith North Project schematic geology map showing MRE with
separate drill type, Black dots = aircore, Blue dots = auger
The MRE results are shown in Table 1, and a plan showing the resource areas and
classification is shown in Figure 2. Summary information is included in this report and JORC
Code 2012 Table 1 is included as Appendix 1.
Million
SiO2%
Al2O3%
Fe 2O3%
TiO2%
LOI%
Tonnes
33
98.7
0.50
0.20
0.20
0.20
White Sand
Indicated
Yellow Sand
215
97.5
1.10
0.40
0.20
0.50
248
97.7
1.00
0.40
0.20
0.50
All Sand
280
98.7
0.50
0.10
0.20
0.20
White Sand
243
97.7
1.00
0.40
0.20
0.50
Inferred
Yellow Sand
523
98.2
0.80
0.30
0.20
0.40
All Sand
White Sand
313
98.7
0.54
0.15
0.18
0.24
Indicated +
458
97.6
1.08
0.40
0.17
0.52
Yellow Sand
Inferred
771
98.0
0.86
0.30
0.17
0.41
All Sand
*Note: Interpreted silica sand mineralisation is domained above a basal surface wireframe defined based
on drill logging data. The upper (Topsoil) layer within 0.5 m of surface is depleted from the modelled
silica sand unit, being reserved for rehabilitation purposes. All classified silica sand block s in the model
are reported. Differences may occur due to rounding.
Classification
Table 1:
Domain
Arrowsmith North Silica Sand Mineral Resource Estimate as at July 2019
Classification
Indicated
Inferred
Indicated +
Inferred
Table 2:
Domain
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
Maiden
MRE (Mt)
44
149
194
44
149
194
Updated
MRE (Mt)
33
215
248
280
243
523
313
458
771
Tonnage Comparison with Prior estimate
Difference
633%
163%
270%
708%
307%
398%
Figure 3:
Arrowsmith North Updated MRE by classification.
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to Arrowsmith Exploration Results are
based on data collected and compiled under the supervision of Mr David Reid, in his capacity
as Exploration Manager. Mr Reid, BSc (Geology), is a registered member of the Australian
Institute of Geoscientists and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and the activity being undertaken to
qualify as a Competent Person under the 2012 edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr Reid consents to the
inclusion of the data in the form and context in which it appears.
The information in this announcement that relates to Arrowsmith North Mineral Resources is
based on information compiled by Mr Grant Louw who is a full-time employee of CSA Global,
under the direction and supervision of Dr Andrew Scogings, who is an Associate of CSA
Global. Dr Scogings is a Member of the Australasian Institute of Mining and Metallurgy and a
Member of the Australian Institute of Geoscientists. He is a Registered Professional Geologist
in Industrial Minerals. Dr Scogings has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian
Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC
Code). Dr Scogings consents to the disclosure of information in this report in the form and
context in which it appears.
ASX LISTING RULE 5.8.1 SUMMARY
The following summary presents a fair and balanced representation of the information
contained within the Mineral Resource Estimate (MRE) technical report:
• Silica sand mineralisation at Arrowsmith North occurs within the coastal regions of the
Perth Basin, and the targeted silica sand deposits are the aeolian sand dunes that overlie
the Pleistocene limestones and paleo-coastline. (ASX LR 5.8.1 geology & geological
interpretation).
•
•
•
•
Samples were obtained from auger drilling and air core drilling. Quality of drilling/sampling
and analysis, as assessed by the Competent Person, is of an acceptable standard for use
in a Mineral Resource estimate publicly reported in accordance with the JORC Code. (ASX
LR 5.8.1 Sampling & 5.8.1 Drilling).
Major and trace elements apart from SiO2 were analysed using a four-acid digest followed
by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry (ICP-OES)
analysis at the Intertek Genalysis, Perth laboratory. Loss on Ignition at 1000°C (LOI) was
analysed by Thermal Gravimetric Analyser. SiO2 was back-calculated by subtracting all
ICP major and trace elements plus LOI from 100%, as this is the most accurate way of
determining SiO2 content for samples with very high SiO2. Certain of the ICP results were
verified by X-Ray Fluorescence (XRF) analyses. (ASX LR 5.8.1 Analysis).
The Mineral Resources were estimated above 3-d wireframe basal surfaces for the white
and yellow sands, with the surfaces being based on the geological boundaries defined by
logged sand types and chemical analysis results from the drill data. The air core drilling
demonstrated that the white sand layer extends to the west, past the interpreted contact,
under the yellow sand in approximately the northern half of the modelled area. The basal
surface of the yellow sand is defined by this lithological contact, or is limited by
interpretation of nominal average thickness of the sand layer based on the data from
surrounding deeper drill holes as required. The white sand layer basal surface is similarly
defined by the drilling data and or is limited by interpretation of nominal average thickness
of the sand layer based on data from surrounding deeper drill holes as required. The
horizontal extents of the interpreted sand layers are limited to within the VRX nominated
Arrowsmith North target area and with reference to the publicly available soil mapping
data. The surface humus layer is typically about 300 mm thick. In consultation with the
Company, CSA Global considered that the upper 500 mm (overburden) is likely to be
reserved for rehabilitation purposes. This overburden surface forms the upper boundary
of the estimated Mineral Resource and is depleted from the reported Mineral Resources.
Comparatively minor areas that are mapped as iron richer sand ridges, swamp or sandy
swamp are also depleted from the Mineral Resources. (ASX LR 5.8.1 Estimation
methodology).
Grade estimation was completed using ordinary kriging with an inverse distance weighting
to the power of two validation estimate also completed. (ASX LR 5.8.1 Estimation
methodology).
•
•
•
•
•
The Mineral Resource is quoted from all classified blocks within the defined layers for white
and yellow sand and below the overburden surface layer. (ASX LR 5.8.1 cut-off grades).
The Mineral Resource was classified as Indicated and Inferred based on drill hole logging,
drill hole sample analytical results, drill spacing, geostatistical analysis, confidence in
geological continuity, and metallurgical / process test results. (ASX LR 5.8.1 classification).
Roughly 15% of the interpreted mineralisation is extrapolated.
The JORC Code Clause 49 requires that industrial minerals must be reported “in terms of
the mineral or minerals on which the project is to be based and must include the
specification of those minerals” and that “It may be necessary, prior to the reporting of a
Mineral Resource or Ore Reserve, to take particular account of certain key characteristics
or qualities such as likely product specifications, proximity to markets and general product
marketability.” (ASX LR 5.8.1 Mining, metallurgy & economic modifying factors).
Therefore, the likelihood of eventual economic extraction was considered in terms of
possible open pit mining, likely product specifications, possible product marketability and
potentially favourable logistics and it is concluded that Arrowsmith North is an industrial
mineral Mineral Resource in terms of Clause 49. (ASX LR 5.8.1 Mining, metallurgy &
economic modifying factors)
Testwork and Product Catalogue
VRX has announced the results of metallurgical testwork and the development of product
catalogues. 3 The testwork completed to date at the CDE Global, world leading sand testing
laboratory in Cookstown, Northern Ireland confirmed that high quality glass and foundry sand
could be produced from the Arrowsmith North Project. This testwork resulted in the generation
of a catalogue of products that can be produced from the Arrowsmith North Project, these are
summarised in Table 3 and 4, below.
Chemical Composition (%)
Product
Arrowsmith-NF500
Arrowsmith-N20
Type
Glass
Foundry
SiO2
99.7
99.7
Al2 O3
0.20
0.20
Fe2 O3
0.05
0.05
TiO2
0.035
0.035
CaO
0.010
0.010
MgO
0.002
0.002
K2 O
0.03
0.03
Arrowsmith-N40
Foundry
99.7
0.20
0.05
0.035
0.010
0.002
0.03
Table 3:
Arrowsmith North Product Catalogue – Chemical Composition
Particle Size
Product
Arrowsmith-NF500
Arrowsmith-N20
Arrowsmith-N40
Table 4:
10
(2000)
20
(850)
3%
30
(600)
0.5%
87%
40
(425)
40%
8%
0.1%
0%
21%
36%
Sieve Opening – Mesh (µm) Retained
50
(300)
42%
1%
70
(212)
17%
0.1%
100
(150)
1%
140
(106)
0%
200
(75)
24%
13%
5%
1%
0%
AFS
No
21
Arrowsmith North Product Catalogue – Particle Size
3ASX announcement of 26 February 2019. “Testwork Update and Product Catalogues”.
36
Plant Recoveries
VRX has announced the process plant recoveries for each of the Arrowsmith North products
reported in the catalogue. 4
Product
Arrowsmith - N20
Arrowsmith - N40 / NF500
Local Market/Filter/Bunker
Table 5:
Industry
Foundry
Foundry / Glass
Filter / Bunker
Recovery
24%
60%
6%
Arrowsmith North Plant Recoveries
Future Work
With the estimation of an Indicated Mineral Resource the Company can now complete a
Feasibility Study and estimate an Ore Reserve for the Project. A positive Feasibility Study will
allow for the project to progress through mining approvals, financing and into construction and
the commencement of Mining Operations.
A further testwork program will be undertaken on the unpredicted 313 million tonnes of white
sand at Arrowsmith North to determine the quality of products that can be generated from the
higher-grade source.
For silica sand enquiries contact Mr Yoonil Kim:
Manager International Sales
yoonilk@vrxsilica.com.au
+60 17 687 8238
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
4ASX announcement of 3 May 2019, “High Recovery from Silica Sand Process Plant Design-Amended”.
About VRX Silica
VRX Silica Ltd (VRX Silica) (ASX: VRX) has significant silica sand projects in Western Australia.
The Arrowsmith Silica Sand Project, located 270kms north of Perth, comprises five granted exploration
licences and two mining lease applications pending. The Muchea Silica Sand Project, located 50kms north of
Perth, comprises one granted exploration licence, with one exploration licence and one mining lease
application pending. Testwork has confirmed a range of silica sand products which are capable of production
at both projects. A feasibility study for Arrowsmith Central and Arrowsmith North is being compiled.
The Boyatup Silica Sand Project, located 100kms east of Esperance, comprises two adjacent granted
exploration licences. Initial indications are that this project will complement both Arrowsmith and Arrowsmith
while adding to the silica products VRX Silica will potentially produce. A POW for a drilling program has been
approved and the Company is currently arranging a Heritage Survey for drilling clearance.
Also, in Western Australia, 40km south of Newman, is VRX Silica’s Warrawanda Project, which is prospective
for high purity quartz and nickel sulphides. A POW for a drilling program has been approved and the Company
is currently arranging a Heritage Survey for a drilling clearance.
VRX Silica also has granted tenements at its Biranup Project, adjacent to the Tropicana Gold Mine in Western
Australia’s Goldfields that are prospective for gold and base metals.
Proven Management
The VRX Silica Board and management team have extensive experience in mineral exploration and mine
development into production and in the management of publicly listed mining and exploration companies.
Project Locations
Appendix 1 - JORC 2012 Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Commentary
Aircore drilling samples are 1m down hole intervals with sand collected from a cyclone
mounted rotary cone splitter, ~2-3kg (representing 50% of the drilled sand) was collected.
Two sub-samples, A and B, of ~200g were taken from the drill samples. The remainder
was retained for metallurgical testwork.
Auger drilling samples are 1m down hole intervals with sand collected from a plastic tub
which received the full sample, ~8kg, from the hole. The sand was homogenised prior to
sub sampling, two sub-samples, A and B, of ~200g were taken from the drill samples. A
bulk sample of ~5kg was retained for each 1m interval for metallurgical testwork.
The “A” sample was submitted to the Intertek Laboratory in Maddington, Perth for drying,
splitting (if required), pulverisation in a zircon bowl and a specialised silica sand 4 Acid
digest and ICP analysis.
All auger samples were weighed to determine if down hole collapse was occurring, if the
samples weights increased significantly the hole was terminated to avoid up hole
contamination.
The targeted mineralisation is unconsolidated silica sand dunes, the sampling techniques
are “industry standard”.
Due to the visual nature of the material, geological logging of the drill material is the
primary method of identifying mineralisation.
Drilling techniques
Vertical NQ sized aircore drilling was completed by a Contract Drilling Company using a
Landcruiser mounted Mantis 82 drill rig.
A 100mm diameter hand screw auger was used to drill until hole collapse.
Drill sample
recovery
Aircore
Visual assessment and logging of sample recovery and sample quality
Reaming of hole and clearance of drill string after every 3m drill rod
Sample splitter and cyclone cleaned regularly to prevent sample contamination
No relationship is evident between sample recovery and grade
Hand Auger
All material recovered from the hole is collected in a plastic drum and weighed, the
weights are used to determine when the hole is collapsing, and drilling is terminated.
No relationship is evident between sample recovery and grade
Logging
Geological logging of drill samples is done by the field geologist with samples retained in
chip trays for later interpretation.
Logging is captured in an excel spreadsheet, validated and uploaded into an Access
database
Sub-sampling
techniques and
sample preparation
Aircore drill samples are rotary split 50:50 into a calico bag resulting in 2-3kg of dry
sample, 2 x 200g sub-samples, A and B, are taken from the drill sample. The A sample
is submitted to the laboratory and the B sample is retained for repeat analysis and QA/QC
purposes. The bulk sample is retained for later metallurgical testwork.
Criteria
Commentary
Auger drill material, ~8kg, is collected in a plastic tub and homogenised, 2 x 200g subsamples, A and B, are taken from the drill material. The A sample is submitted to the
laboratory and the B sample is retained for repeat analysis and QAQC purposes. A 5kg
bulk sample is retained for later metallurgical testwork.
The sample size is considered appropriate for the material sampled.
The 200g samples are submitted to the Intertek Laboratory in Maddington, Intertek use a
zircon bowl pulveriser to reduce the particle size to -75um.
Quality of assay
data and laboratory
tests
Samples were submitted for analysis to the Intertek Laboratory in Maddington in Perth
WA. The assay methods used by Intertek are as follows: multi-elements are determined
by a specialised four-acid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric
acids in Teflon tubes. Analysed by Inductively Coupled Plasma Mass Spectrometry, silica
is reported by difference.
The assay results have also undergone internal laboratory QAQC, which includes the
analysis of standards, blanks and repeat measurements.
The Company has been validating a high-purity silica standard that was created for the
Company by OREAS Pty Ltd. This was required as there is no commercial standard
available for high purity silica sand. The standard was “round robin” assayed at several
laboratory’s in Perth prior to the commencement of drilling.
The standard was then included in the drill sample submissions to Intertek, in sequence,
on a ratio of 1:20. Field duplicate samples were submitted in a ratio of 1:20 and in addition
to this Intertek routinely duplicated analysis from the pulverised samples in a ratio of 1:25.
The number of QAQC samples therefore represents ~14% of the total assays.
A full analysis of all the quality control data has been undertaken. This analysis validates
the drill assay dataset and conforms with the guidelines for reporting under the JORC
2012 code.
Verification of
sampling and
assaying
Significant intersections validated against geological logging
Location of data
points
Auger drill hole locations were measured by hand-held GPS with the expected relative
accuracy; GDA94 MGA Zone 50 grid coordinate system is used. Aircore drill holes have
been surveyed by RM Surveys using base stations on GOLA SSM DON53 and a Project
Control point established as GFM001, situated within the Arrowsmith North prospect and
coordinated by RTK from DON53, with the expected relative accuracy compared to the
control of 0.05m E, N and RL. Due to RL issues with the SRTM topographical surface the
drill collar RL’s were transformed to the SRTM surface.
Data spacing and
distribution
Initial auger drilling at Arrowsmith were spaced 400-1,000m apart along existing tracks.
The aircore drilling in the indicated resource was spaced 400m, along lines spaced 450m
apart. In the Inferred area holes were spaces 800m apart, on line spaces 800m apart.
Three pairs of twin holes were drilled at Arrowsmith North, with each twin pair collared
within 0.5m. Analysis of the twin pairs shows an acceptable repeatability between holes.
No sample compositing (down hole) has been done.
Orientation of data
in relation to
geological structure
Sampling is being undertaken on aeolian sand dunes; the drill orientation is therefore
considered appropriate.
Sample security
All samples are selected onsite under the supervision of VRX Silica Geological staff.
Criteria
Commentary
Samples are delivered to the Intertek laboratory in Maddington. Intertek receipt received
samples against the sample dispatch documents and issued a reconciliation report for
every sample batch.
Audits or reviews
There has been no audit or review of sampling techniques and data at this time.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Commentary
Mineral tenement
and land tenure
status
All drilling has been within Tenement E70/5027, which is owned by Ventnor Mining Pty
Ltd a 100% owned subsidiary of VRX Silica Limited.
Exploration done by
other parties
Minor exploration for mineral sands has been completed by various Companies. Other
than work completed by VRX, no exploration for silica sand has been done.
Geology
Most economically significant silica sand deposits in Western Australia are found in the
coastal regions of the Perth Basin, and the targeted silica sand deposits are the aeolian
sand dunes that overlie the Pleistocene limestones and paleo-coastline, which also host
the regional heavy mineral deposits. Within the project area, data obtained from the
Department of Agriculture soil mapping shows there are pale and yellow deep sands
predominating with lesser swampy areas and occasional ironstone ridges.
Drill hole
Information
Not relevant. Exploration results are not being reported. Mineral Resources are being
disclosed (see Section 3). Sample and drillhole coordinates are provided in previous
market announcements.
Data aggregation
methods
Not relevant. Exploration results are not being reported. Mineral Resources are being
disclosed (see Section 3).
Relationship
between
mineralisation
widths and
intercept lengths
Not relevant. Exploration results are not being reported. Mineral Resources are being
disclosed (see Section 3).
Diagrams
Refer to figures within the main body of this report.
Balanced reporting
Not relevant. Exploration results are not being reported. Mineral Resources are being
disclosed (see Section 3).
Other substantive
exploration data
Geological observations are consistent with aeolian dune mineralisation
The tenement was granted 29 August 2017 and all drilling was conducted on VCL.
Four, certified, dry in-situ bulk density measurements were completed at Arrowsmith by
Construction Sciences Pty Ltd using a nuclear densometer. The arithmetic average of
these was used in the determination of the exploration targets.
Groundwater was intersected in only a few holes that were drilled deeper deliberately to
ascertain the position of the water table. The water table is typically below 15m depth.
The mineralisation is unconsolidated sand.
There are no known deleterious substances at this time.
Further work
With the estimation of an Indicated Mineral Resource the Company can now complete a
Feasibility Study and estimate a Ore Reserve for the Project. A positive Feasibility Study
Criteria
Commentary
will allow for the project to progress through mining approvals, financing and into
construction and the commencement of Operations.
A further testwork program will be undertaken on the “White Sand” at Arrowsmith North to
determine the products that can be beneficiated from the higher-grade source.
Section 3: Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
Commentary
Data used in the MRE is sourced from a Microsoft Access database. Relevant tables from
Database integrity
the Microsoft Access database are exported to Microsoft Excel format and converted to
csv format for import into Datamine Studio 3 software.
Validation of the data imported comprises checks for overlapping intervals, missing survey
data, missing analytical data, missing lithological data, and missing collars.
Site visits
A site visit by Grant Louw of CSA Global took place on 3 July 2019.
Geology – Mr Louw noted that the Arrowsmith tenements are primarily underlain by
unconsolidated white / yellow silica sand, covered by low scrub and very few trees.
Topographic relief is low. It was noted that the material recorded as ironstone ridges by the
DOAG mapping is in fact a more iron rich sand unit, and not an ironstone.
Drill collars – Mr Louw recorded and verified several marked drill sites using hand-held
GPS.
Project location – several points such as road intersections were located and plotted in
Google Earth™ to verify the tenement location.
The CP has visited the VRX sample storage on 17 October 2018 and addressed the
following:
Sample storage – originals, field duplicates, pulps, standards and chip trays are housed
appropriately. Some chip trays were photographed by the CP as a check against Company
photographs and geology logs.
Geological
interpretation
Silica sand mineralisation at Arrowsmith North occurs within the coastal regions of the
Perth Basin, and the targeted silica sand deposits are the aeolian sand dunes that overlie
the Pleistocene limestones and paleo-coastline.
Within the project area, data obtained from the Department of Agriculture soil mapping
shows there are pale (logged by the Company as white sands) and yellow deep sands
predominating, with lesser swampy areas and occasional iron rich sand ridges.
The geological modelling was completed based on this soil mapping data in conjunction
with the auger and aircore drill logging data. The Mineral Resources were estimated above
3-d wireframe basal surfaces for the white and yellow sands, with the surfaces being based
on the geological boundaries defined by logged sand types and chemical analysis results
from the drill data. The air core drilling demonstrated that the white sand layer extends to
the west, past the interpreted contact, under the yellow sand in approximately the northern
half of the modelled area. The basal surface of the yellow sand is defined by this lithological
contact, or is limited by interpretati
Share your feedback
Discover