ASX ANNOUNCEMENT
28 April 2023
March 2023 Quarterly Activity Report
The following is a summary of the activities conducted by VRX Silica Limited (VRX or
Company) during the March 2023 quarter at its silica sand projects at Arrowsmith North,
Arrowsmith Central (located 270 km north of Perth), Muchea (located 50 km north of Perth)
and Boyatup (located 100 km east of Esperance), all situated in Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand exploration and development
company with four high-value, advanced, very long-term silica sand projects in Western
Australia, a Tier 1 mining region.
The Company has multi-decade scale contiguous sand deposits on granted Mining Leases
with secure tenure and a combined +1.1Bn tonne1 Mineral Resource of 99.6% to 99.9% SiO2
high grade silica sand.
The Company and its management team is WA based as are its four large scale, high-grade
and low impurity silica sand projects. Each project can be run independently and will supply
high-grade silica sand to many diverse markets.
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and water. It is the main
ingredient in all types of glassmaking, including specialty solar panel and high-tech glass.
The glass manufacturing industry demand is increasing at a rate of 5-6% per year, or about
8-10 million tonnes pa. Around 47% of the world’s glass is manufactured in Asia.
Silica sand is also an essential component of the foundry and casting industries. The largest
foundry industry is in Korea where it dominates the industry particularly for large marine
components.
Silica sand is also the main ingredient in concrete.
Silica sand is a finite resource that is rapidly being exhausted and the Asia-Pacific region is
currently experiencing increasing demand at a time of a global supply shortfall.
A Project development pipeline to ensure a disciplined, staged development of
world-class assets
The Arrowsmith North silica sand project (Arrowsmith North) will lead a staggered and
disciplined development program, followed by the Muchea silica sand project (Muchea),
Arrowsmith Central (Arrowsmith Central) silica sand project and the Boyatup silica sand
project (Boyatup).
VRX has the most-developed ASX listed company silica sand projects in Australia with
planning, Aboriginal heritage, environmental approvals, metallurgical testwork studies,
process circuit design and plant engineering well advanced having commenced in 2017.
Mining Leases are granted over these projects as well as various Miscellaneous Licences for
access with permitting and infrastructure preparations well-advanced.
1 See Resource table on page 8
Page | 1
ASX ANNOUNCEMENT
The scale of the projects provides for a long-term opportunity for silica sand export and
potential for glass manufacturing and downstream industries in Western Australia.
Critical Minerals Publication
In December 2022 the Arrowsmith North and Muchea projects were included in the Australian
Critical Minerals Prospectus for 2022 published by Austrade.
The prospectus includes technical, commercial, and geological data to facilitate investment into
projects for Australia’s identified critical minerals.
The recognition by the Australian Government that silicon and silica sand are a critical mineral
and that VRX has significant potential to address anticipated production shortfalls, build supply
chain security, and help deliver progress on a net-zero future is an important step forward.
The publication has been widely distributed by Austrade during Government trade delegation
promotional trips to trading partner countries.
Recent trips by Australian Government trade delegations has seen a significant increase in
enquiries to purchase silica sand products. VRX has been contacted by potential trading
partners from India for glassmaking and foundry sand, Indonesia, Saudi Arabia and China for
glassmaking sand. Subsequent communication with enquirers supports the fundamental issues
surrounding supply of silica sand, particularly high-grade sand and the looming shortfall that
has been predicted for some time.
Arrowsmith North
The mining and processing operation is relatively simple and low impact with long-term
production expected to commence initially at Arrowsmith North on the 221Mt Proved and
Probable Ore Reserve (9.2Mt Proved and 212Mt Probable) in 2023, subject to final
environmental approvals.
A revised capital estimate is currently underway on a tailored 2Mtpa processing plant with a
unique patented custom process circuit.
The Company has identified long-lead items and commenced the specification and production
of tender documentation of processing equipment for the plant in preparation for the
procurement process in order to enable a timely construction program following a decision to
mine at Arrowsmith North.
Delays in the approvals process that have afflicted the resources industry in general in
Western Australia have necessitated the tender process for major equipment to be deferred
until a more precise commencement date can be established. However, previous tenders have
identified Original Equipment Manufacturers (OEM) that will be requested to supply updated
tenders.
Engineering
The Company has finalised the processing circuit design to produce multiple products and
finalised the detailed engineering required for construction detailing all disciplines - steelwork,
mechanicals, pipework, electrical, air, etc.
The execution schedule will also have revised lead times for major equipment. Specification
and tender documents for long lead time equipment are also complete and VRX is awaiting
determination of the commencement timetable to commence procurement of these major
items.
Page | 2
ASX ANNOUNCEMENT
Process Water
The process water bore and associated monitoring bores have been completed to access
water from the Yarragadee North deep aquifer. The application for abstraction has been
lodged and final licensing will be in conjunction with the environmental approvals.
Power Supply
The Company has executed an LOI with ResourcesWA to investigate a proposed power supply
solution for the Arrowsmith North Silica Sand Project utilising gas directly from a local wellhead.
The purpose of the LOI is to investigate the potential to establish a powerhouse, with
containerised gas reciprocating engines, at a nearby gas wellhead site with direct offtake from
the existing gas plant and reticulation to the Arrowsmith North site via a dedicated transmission
line.
ResourcesWA has a fully resourced and operational project development, delivery and asset
management team. The proposal is inclusive of all design, construction and operational
requirements to provide a 100% turnkey Build, Own and Operate solution.
This power solution has the potential to provide the most economic low emission power supply
to the Arrowsmith North Project.
Logistics
The Company is continuing discussions with the Mid West Ports Authority (for export of silica
sand product from Geraldton Port) to enable a storage area and shiploading within their Port
Maximisation Plan.
A recent site visit and planning meeting with the MWPA has investigated proposed sites for
future storage and berth access for shiploading.
The Company has access to the adjacent Brand Highway from the Arrowsmith North
processing plant site and an approved road intersection plan from Main Roads to enable road
transport of silica sand product in the short-term.
The Company is preparing tender documents for the short-term haulage operations.
Approvals
VRX has conducted extensive environmental studies on its silica sand projects over a number
of seasons in anticipation of requirements of the State and Federal environmental regulation
authorities to undertake approvals assessments. These surveys commenced shortly after the
tenements were acquired and the number and extent of these surveys have expanded
following further consultation with these authorities. The Company has initially concentrated
on gaining approval for development of the Arrowsmith North project.
During May 2022 the Company lodged the initial Environmental Review Document (ERD) for
Arrowsmith North with the EPA.
The Company received a request for additional information mid-November 2022. The
Company lodged a revised ERD (Revision D) and response table to address the requested
information in December 2022.
Subsequent to the end of the quarter, the Company received a further response on 19 April
2023 requesting confirmation that the Company has complied with requirements for flora
collecting and Herbarium vouchers, Index of Biodiversity Surveys for Assessments (IBSA)
Page | 3
ASX ANNOUNCEMENT
submissions and consistency in flora naming, inclusion of amended appendices in the final
ERD and conformity in variously dated surveys with respect to amended affected areas.
The next step is re-submission of another Revision and acceptance of the ERD by the EPA
for publication, initiating the four week Public Environmental Review of the ERD.
The EPA considers the ERD to be the proponent’s view of the proposal for public comment
and public release of the ERD does not mean the EPA has endorsed the proposed
approaches to impact assessment and management. If additional information is required from
the proponent during the Response to Submissions phase of the assessment, this information
may subsequently require publishing on the EPA website for further public review and
comment.
An important feature of the EPA Proposal is the proposed rehabilitation method to use the
unique VDT method which is estimated to result in the best restoration of the mine area
vegetation and habitat.
The VDT methodology can be viewed at:
https://vrxsilica.com.au/miningandrehabilitationmethodology/
Key Plant Equipment
VRX has previously announced the start of project capital expenditure for its Arrowsmith North
processing plant, with the purchase of two major items of sand processing capital equipment.
A feed trommel and a vibrating screen has been refurbished by Bunbury based workshops.
VRX will continue to pursue other lead time and cost-saving opportunities to capitalise on its
first-mover advantage in Western Australia’s emerging silica sand sector, at a time when there
is fast-rising global demand for high-quality, responsibly sourced silica sand volumes.
Ore Reserve Estimate Update
Arrowsmith North - Ore Reserves
Updated Estimate
Classification
Proved
Probable
Total
Prior
Estimate
Change
Total
AFS20
AFS35
AFS55
Local
Mt
9.2
211.8
221.0
Mt
0.8
24.2
25.0
Mt
3.9
102.5
106.4
Mt
2.7
51.1
53.8
Mt
1.8
34.1
35.9
223
Mt
-2.0
-0.9%
Mt
The rounding in the above table is an attempt to represent levels of precision implied in the
estimation process which may result in apparent errors of summation in totals shown in rows
or columns.
Page | 4
ASX ANNOUNCEMENT
Arrowsmith Central
Arrowsmith Central is the second of the Company’s silica sand projects under development.
Approvals
Arrowsmith Central Silica Sand Project (Arrowsmith Central) has moved to the next stage of
the environmental approval process with the EPA.
On 20 June 2022 the Company lodged an Environmental Scoping Document (ESD) which
details the environmental studies that are required to inform the assessment of the project.
Lodgement of the ESD is a fundamental step in the EPA administration procedures to inform
the Environmental Impact Assessment of Arrowsmith Central. The Company is confident the
ESD addresses the EPA’s Environmental Principles, Factors and Objectives.
The ESD is under assessment and the Company is seeking feedback from the EPA.
The Company is not in a position at this stage to set a timeline for the approval process.
Process Water
On 6 September 2022 VRX announced the completion of the test holes for 2 production water
bores which will be the source of water supply for the proposed processing plant at Arrowsmith
Central. The borehole drilling, construction, test pumping and downhole logging has been
completed to compile the required data for the H3 assessment for the abstraction licence.
Muchea
Development of Muchea will follow development at Arrowsmith North.
The Company has had many offtake enquiries for Muchea silica sand from Asian markets and
believes that the consistent production of such high-grade silica sand with a low iron content
will be in high demand as raw material for the manufacture of predominately premium ultraclear glass production, particularly for the burgeoning solar panel manufacturing industry. VRX
continues to receive these enquiries on a regular basis.
Environmental Studies
Detailed springtime flora and vegetation studies were undertaken during the 2022 springtime
months on a selected Priority Area of 450Ha.
The Priority Area has been selected as an area that has only two vegetation types and is
restricted to Low Banksia Woodland on loose sand, which is the Company production target.
Work to date indicates that the selected area has no Priority Species of flora and no thickets
of paperbark which are restricted to low lying areas and generally have more potential fauna
breeding habitat.
The final report was received early 2023 and will form the basis of the EPA Proposal Referral
for the Muchea Silica Sand Project.
Muchea Aboriginal Heritage
VRX had previously undertaken an Aboriginal Ethnographic and Archaeological heritage
survey in 2017 to clear the initial drilling program area, with representatives of the Whadjuk
People accompanying the drill crew.
Page | 5
ASX ANNOUNCEMENT
During the December 2022 quarter, VRX undertook a comprehensive Aboriginal Ethnographic
and Archaeological heritage survey over the Priority Area to identify and understand Aboriginal
heritage values within the area to support future dialogue with the Whadjuk people about the
proposed mining project.
The final report was received early 2023. No archaeological heritage sites were identified on
the archaeological survey. VRX has committed to continued monitoring by Whadjuk
representatives when significant ground disturbing works are undertaken to identify any
material which comes may come to light as a result of the proposal.
No ethnographic heritage sites were identified on the ethnographic survey.
The Proposal will be managed through a Cultural Heritage Management Plan (CHMP) under
the Aboriginal Cultural Heritage Act (Western Australia) 2021 (to be implemented in 2023).
Preliminary drafting of the CHMP will commence during the June 2023 quarter to comply with
the recently published guidelines.
Exploration
A POW has been approved for further deeper exploration on existing tracks on E70/4886.
Drilling will be undertaken in the September 2023 quarter. This will be followed by an updated
MRE.
Boyatup
An examination of the Particle Size Distribution (PSD) data indicates that the Boyatup Silica
Sand project is generally a finer sand than that encountered at the Company’s other projects.
The potential products that can be produced have been identified and a marketing study
underway. What is apparent is that the potential products are different to the products from the
Company’s other projects and will be aimed at yet another potential market and not conflict with
the other identified markets.
Geothermal Exploration Permit Applications
In January 2022 DMIRS released 21 areas in Western Australia for applications for
Geothermal Exploration Permits with a closing date for applications of 21 April 2022.
VRX made a number of applications for permits proximal to the Company’s current Arrowsmith
North and Arrowsmith Central silica sand holdings.
The applications were made as part of VRX’s overall green energy intentions as demonstrated
by the hydrogen gas MOU signed with XODUS Energy Pty Ltd.
VRX has not received any notification at this stage regarding these applications and received
no notification on the timetable to grant.
Metallurgical Testwork R&D
During April 2022, VRX lodged a registration for an R&D Tax Incentive Application with
AusIndustry for the year ending June 2021.
The Company is currently preparing an additional claim for the financial year ending June
2022.
Page | 6
ASX ANNOUNCEMENT
WA Investment Attraction Fund
In July 2019 the Western Australian State Government released Diversity WA to provide an
economic development framework for the State. It sets out initiatives, actions and strategies
that will contribute to achieving its vision for “a strong and diversified economy delivering
secure, quality jobs through increased investment across a broad range of industries”. It also
identifies priority sectors for strategic development that match Western Australia’s unique
strengths with global trends to achieve growth across the economy.
As part of the initiative, successful applicants will be eligible for financial assistance in the form
of grants and other incentives, subject to a Financial Assistance Agreement (FAA) from the
Investment Attraction Fund.
In May 2022 VRX made a preliminary application under Stage 1 of the scheme (Expressions
of Interest) and at the end of August 2022 the Company was shortlisted and invited to progress
to Stage 2 and make a detailed application.
The detailed application was lodged in October 2022.
Corporate
There was no corporate activity during the quarter.
ASX Listing Rule 5.3 disclosures
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $22K related mainly to
tenement rents.
Payments for exploration & evaluation under investing activities of $705K consists mainly of
water bore drilling and hydrogeological studies, environmental surveys and approvals costs,
drilling and assay work and metallurgical test work.
Details of tenement activities:
None
Details of related party payments:
The aggregate amount of payments to related parties and their associates of $152K
represents directors’ fees and salaries paid during the quarter.
Page | 7
ASX ANNOUNCEMENT
Combined +1.1Bn tonne Mineral Resource
Project
Classification
Indicated
Inferred
Total
Indicated
Arrowsmith
Inferred
North
Total
Indicated
Arrowsmith
Inferred
Central
Total
Inferred
Boyatup*
Total
Total Mineral Resource
Muchea
Mt
36
172
208
248
523
771
28.2
48.3
76.5
60
60
1,116
Al₂O₃
%
99.6
0.09
99.6
0.05
99.6
0.06
97.7
1.00
98.2
0.80
98.0
0.86
96.6
1.70
96.9
1.50
96.8
1.50
97.8
0.83
97.8
0.83
Million Tonnes**
SiO₂ %
Fe₂O₃ %
TiO₂ %
LOI %
0.03
0.02
0.02
0.40
0.30
0.30
0.40
0.40
0.40
0.23
0.23
0.07
0.10
0.10
0.20
0.20
0.17
0.20
0.20
0.20
0.13
0.13
0.22
0.23
0.23
0.50
0.40
0.41
0.70
0.70
0.70
0.88
0.88
* Boyatup Mineral Resource Estimate announced to ASX on 18 August 2022
** See material assumptions statement at end of document
Material assumptions for Reserve and Resource reporting
The information in this document that relates to the estimation and reporting of the Mineral
Resource and Ore Reserves for the Company’s silica sands projects is extracted from releases
to ASX on 28 August 2019 and 11 November 2022 (Arrowsmith North), 17 September 2019
(Arrowsmith Central), 18 October 2019 (Muchea) and Boyatup (18 August 2022). The
Company confirms that it is not aware of any new information or data that materially affects the
information included in this document and all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed.
This quarterly report has been approved for release by the Managing Director.
Page | 8
ASX ANNOUNCEMENT
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica Sand
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
E70/5817
M70/1389
M70/1392
M70/1418
L70/198
L70/199
L70/202
L70/203
L70/208
L70/230
L70/229
G70/264
G70/265
G70/266
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Granted
Granted
Granted
Granted
Granted
Granted
Application
Granted
Granted
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
Muchea Project – Silica Sand
Tenement
Status
E70/4886
E70/5157
E70/5548
E70/5651
M70/1390
M70/1414
L70/200
L70/204
L70/205
L70/206
Granted
Granted
Granted
Application
Granted
Application
Granted
Granted
Application
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
Boyatup Project – Silica Sand
Tenement
Status
E69/3560
E69/3668
Granted
Granted
Interest at
beginning of
quarter
100%
100%
Page | 9
ASX ANNOUNCEMENT
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most
advanced pureplay silica sand company
listed on the ASX, developing its 100%
owned silica sand projects at Arrowsmith
(North and Central), Muchea and Boyatup
in Western Australia.
Silica sand is the most used commodity on
the planet after air and water. It is the main
ingredient in all types of glassmaking,
including specialty solar panel and hightech glass, and foundry casting. It is a finite
resource that is running out, with the AsiaPacific region experiencing an ever-growing
supply shortfall that is driving up prices.
Arrowsmith North is located 270km north of
Perth and boasts a minimum 25-year mine
life capable of producing more than 2Mt
tonnes per year of high-grade (99.7% SiO2)
silica sand for export to the foundry,
container glass and flat glass markets in
Asia. Permitting at Arrowsmith North is well
advanced, with production targeted for 2023
subject to approvals.
Arrowsmith Central, located 270km north of Perth, is capable of producing sand for the
container and flat glass market.
Muchea, located 50km north of Perth, is an ultra-high-grade (99.9% SiO2) silica sand project
capable of producing sand required for ultra-clear glass for solar panels and other high-tech
glass applications.
Boyatup, located 100km east of Esperance, is under
development and capable of producing sand for the glass market.
Page | 10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VRX SILICA LTD
Quarter ended (“current quarter”)
ABN
59 142 014 873
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 March 2023
Year to date
(9 months)
$A’000
Current quarter
$A’000
-
-
(22)
(229)
(b) development
-
-
(c) production
-
-
(d) staff costs
(319)
(797)
(e) administration and corporate costs
(311)
(1,396)
-
-
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
44
78
1.5
Interest and other costs of finance paid (on
lease liability)
(7)
(15)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
198
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(615)
(2,161)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(471)
(823)
(d) exploration & evaluation
(705)
(2,860)
(e) investments
4
(16)
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Year to date
(9 months)
$A’000
Current quarter
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (bonds deposit)
-
(89)
2.6
Net cash from / (used in) investing
activities
(1,172)
(3,788)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liability)
(19)
(54)
3.10
Net cash from / (used in) financing
activities
(19)
(54)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
5,109
9,306
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(615)
(2,161)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,172)
(3,788)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(19)
(54)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Year to date
(9 months)
$A’000
Current quarter
$A’000
-
-
3,303
3,304
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
3,303
3,109
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
152
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
2,000
3,303
5,109
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(615)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(705)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,320)
8.4
Cash and cash equivalents at quarter end (item 4.6)
3,303
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
3,303
2.5
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Not applicable
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Not applicable
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Not applicable
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
.............28 April 2023............................................................
Authorised by: .........MANAGING DIRECTOR......................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and th