Visible Gold at Black Dragon
Released
Released
Announcement PDF
3 September 2015
ASX ANNOUNCEMENT
VISIBLE GOLD AT BLACK DRAGON
Ventnor Resources Ltd (ASX: VRX) (Ventnor or the Company) is
pleased to announce that visible gold has been observed in drill
samples at its Black Dragon Gold Project in Western Australia.
ASX: VRX
Capital Structure
Black Dragon is located 370 kilometres north-east of Kalgoorlie and
22 kilometres north-east of AngloGold Ashanti (70%) and
Independence Group’s (30%) Tropicana Gold mine, a project with in
excess of seven million ounces of gold in Resources.
Shares on Issue 137.5
million
The drill program recently completed by Ventnor was designed to test
the potential for a new style of mineralisation in this exciting gold
region and to investigate the strike, dip and plunge components of the
prospect.
Market Cap @ 4.0¢ a share
A total of 33 RC drill holes were completed for 2,492 metres of
drilling. The average vertical depth per hole was 50 metres.
Corporate Directory
During drilling 15 RC samples were selected on the basis of observed
geology and hand portable XRF results. These samples were panned
and visible gold and silver were noted in 12 of the samples.
Unlisted Options 13.4
million
$5.5 million (Fully Diluted)
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
John Geary
Company Secretary
Company Projects
Thaduna/Green Dragon
Copper Project in the
Doolgunna district, WA
(subject to SFR Farm-in)
Black Dragon Gold project
adjacent to the Tropicana
Gold Mine
Warrawanda Nickel Project
south of Newman, WA
Discrete ore intercepts or any indication of true widths of gold bearing
lodes will be subject to final assays, which are expected in early
September 2015.
Managing Director Bruce Maluish said: ”It is encouraging to see
visible gold in samples at this early stage and it supports the
Georgina Basin IOCG
Project in western
Queensland
The Company is actively
assessing other base metal
projects in Australia.
geological assumptions we are testing in the Black Dragon exploration program so far”. The
observed geology from the RC drilling confims the Company’s belief that Black Dragon is an
epithermal-style deposit.
The drilling program was designed to recognise the deposit is visually and structurally different
to typical West Australian archean gold deposits and on-site drill hole planning was flexible to
deal with the expected variations in dip and strike.
Competent Person’s Statement
The information in this release that relates to Exploration Results is based on, and fairly represents,
information compiled by Mr David Reid who is a Member of the Australasian Institute of Mining and
Metallurgy (MAusIMM). Mr Reid is a contractor to Ventnor Resources Limited. Mr Reid has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the “2012 Edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Reid consents to the inclusion in this report of the matters based on information provided by him and in
the form and context in which it appears.
For further information please contact:
Bruce Maluish, Managing Director
brucem@ventnorresources.com.au
Tel: +61 8 9226 3780
www.ventnorresources.com.au
Media: Warrick Hazeldine/Luke Forrestal
Cannings Purple
Tel: +61 8 6314 6300
whazeldine@canningspurple.com.au
ABOUT VENTNOR
Ventnor Resources is a base-metals focused explorer with a farm-in JV with Sandfire Resources NL at the
historic Thaduna/Green Dragon project, 170 km north of Meekatharra in Western Australia.
The Thaduna/Green Dragon Project is located 40km east of DeGrussa and represents the largest copper
resource in the Doolgunna-Bryah Basin Region outside of Sandfire’s DeGrussa-Doolgunna Project.
As announced, the Company has recently been granted a tenement adjacent to the Tropicana Gold Mine
in WA that is prospective for gold and has had preliminary exploration comprising mapping and rock chip
sampling and a recently completed an initial drill program.
Also in Western Australia, 40 km south of Newman is the Warrawanda nickel project. In western
Queensland, the Georgina Basin project lies within the Mt Isa Inlier, which is well endowed with Iron
Oxide Copper Gold (“IOCG”) systems and sulphide base-metal deposits.
Known Copper and Nickel Mineralisation
The Thaduna/Green Dragon copper project has historic mine production; copper mineralisation has been
confirmed with four phases of exploration drilling; a Scoping Study has confirmed the economic potential
of the project. A farm-in deal has been transacted with Sandfire Resources to develop the project and to
treat ore. The prospectivity of the Warrawanda nickel project was increased when nickel gossans were
identified in recent work. Further work is planned later in 2015.
Proven Management
The Ventnor directors have extensive experience in the management of publicly listed mining and
exploration companies.
The Company is actively seeking and evaluating other base metals projects in Australia.
PROJECT LOCATIONS
Share your feedback
Discover