ASX ANNOUNCEMENT
March 2022 Quarterly Activity Report
The following is a summary of the activities conducted by VRX
Silica Limited (VRX or Company) during the March 2022
quarter at its silica sand projects at Arrowsmith North,
Arrowsmith Central (located 270 km north of Perth), Muchea
(located 50 km from Perth) and Boyatup (located 100 km east
of Esperance), all situated in Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand
exploration company with four high-value, advanced, very longterm silica sand projects in Western Australia, a Tier 1 mining
region.
The Company has multi-decade scale contiguous sand
deposits on granted Mining Leases with secure tenure and a
combined +1bn tonne Mineral Resource of 99.6% to 99.9%
SiO2 grade silica sand.
The Company and its management team is WA based as are
its four large scale, high-grade and low impurity silica sand
projects. Each project can be run independently and supply
high-grade silica sand to many diverse markets.
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air
and water. It is the main ingredient in all types of glassmaking,
including specialty solar panel and high-tech glass. The glass
manufacturing industry demand is increasing at a rate of 5-6%
per year, or about 8-10 million tonnes pa. Around 47% of the
world’s glass is made in Asia.
Silica sand is an essential component of the foundry and
casting industries. The largest foundry industry is in Korea
where it dominates the industry particularly for large marine
components.
Silica sand is also the main ingredient in concrete.
Silica sand is a finite resource that is rapidly being exhausted
and the Asia-Pacific region is currently experiencing
increasing demand at a time of a global supply shortfall.
ASX: VRX
Capital Structure
Shares on Issue:
558.4 million
Unlisted Options:
35.3 million
Corporate Directory
Paul Boyatzis
Non-Executive
Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north
of Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
The Company is actively
assessing other silica
sand projects in
Australia.
A Project development pipeline to ensure a disciplined, staged development of
world-class assets
The Arrowsmith North silica sand project will lead a staggered and disciplined development
program, followed by Muchea and Arrowsmith Central.
VRX has the most-developed ASX listed company silica sand projects in Australia with
planning, Aboriginal heritage and environmental studies well advanced having commenced in
2017.
Mining Leases are granted over all three projects as well as various Miscellaneous Licences
for access with permitting and infrastructure preparations well-advanced.
The scale of the projects provides for a long-term opportunity for silica sand export and
potential for glass manufacturing and downstream industries in Western Australia.
Arrowsmith North
The mining and processing operation is relatively simple and low impact with long-term
production expected to commence initially at Arrowsmith North on the 223Mt Ore Reserve @
99.7% SiO2, subject to final environmental approvals.
A revised capital estimate is currently underway on a tailored 2Mtpa processing plant with a
unique patented process circuit.
Process circuit design and detailed engineering has been designed following an extensive
metallurgical testing regime. A bulk testwork programs has been undertaken during the March
2022 quarter with results pending. The program has produced sufficient final product samples
which will be sent to an extensive list of potential buyers once confirmation assays have been
received.
In addition, a process water bore was successfully drilled to access water from the Yarragadee
North deep aquifer.
As part of the application for a 5C Licence to Take Water a test production bore and two
monitoring bores, a deep and a shallow, have been drilled and constructed on the Arrowsmith
North miscellaneous licence L70/199 by Western Drilling. The bores have been constructed
to specifications exceeding the Minimal Construction Requirements for Water Bores in
Australia and as specified by the Department of Water and Environmental Regulation.
The test production bore is screened in the confined Yarragadee Formation Unit A aquifer with
the screens installed between 320m and 392m depth. The 250mm FRP casing has been
cement grouted from 0 – 300m to prevent ingress of water from other parts of the Yarragadee
Formation or the superficial aquifer.
A deep monitoring bore has a similar construction to the production bore with the grouting and
screening over similar intervals. A shallow monitoring bore is screened from 18 – 30m in the
superficial aquifer.
The production bore was test pumped to determine hydraulic parameters and specific yields
for use in the H3 Hydrogeological Assessment computer model. The test pumping was
undertaken to AS2368-1990 by Western Irrigation using their mobile test pumping equipment.
Initial multi-rate testing was carried out to determine a constant rate test rate. The highest
rate of 32L/s yielded a maximum drawdown of 6.12m. The constant rate test was carried out
at 30L/s for 1,990 minutes for a maximum drawdown of 6.20m in the pumping bore, 2.71m in
the deep observation bore and no movement in the shallow observation bore.
Preliminary assessment of the constant rate test data indicates a transmissivity in excess of
900m3/d/m which results in a hydraulic conductivity in excess of 10m/d. The controlled test
pumping indicates that the confined Yarragadee Formation Unit A aquifer is capable of yielding
the project requirements of 900,000kL per annum. The production bore has been constructed
to yield in the order of 1,200,000kl per annum.
Analysis of water samples taken during test pumping has confirmed the water is of acceptable
quality for use as process water in VRX’s proposed silica sand process plant.
Arrowsmith North Approvals
During the quarter Environmental Protection Authority of Western Australia (EPA) approved
the Company’s Environmental Scoping Document (ESD) for proposed mining activities at its
100% owned Arrowsmith North Silica Sand Project.
The Proposal was referred to EPA services on 17 March 2021 for assessment under Part IV
of the Environmental Protection Act 1986. On 24 May 2021 it was determined that the
Proposal should be assessed at a Public Environmental Review level of assessment and as
a result, an ESD was to be submitted to the EPA for assessment. The ESD was approved on
15 March 2022.
The ESD approval required no amendments to the submitted document which is testament to
the process that VRX has undertaken in consultation with the EPA.
EPA approval of the ESD is a significant milestone in the environmental approvals process for
Arrowsmith North and provides clarity for the Company on the pathway to development.
The ESD is a precursor to the Environmental Review Document (ERD), which is required
under the EPA’s public environmental review process and will be released for public review.
The ESD was prepared according to the procedures in the EPA’s Environmental Impact
Assessment (EIA; Part IV Divisions 1 And 2) Procedures Manual (EPA, 2021b)
Importantly, VRX now has an indicative timetable for full assessment acceptance by the EPA,
with a final report for Ministerial environmental approval scheduled for December 2022.
The indicative timetable included the timing for submission of the first draft of the ERD by 15
April 2022. Subsequent to the end of the quarter, VRX submitted the required documentation
on 14 April 2022. The ERD is a comprehensive summary of the project environmental setting,
the physical elements of the mine and infrastructure, operational elements, the extent of
effects on the environment and the proposed rehabilitation and closure plan.
An important feature of the proposed rehabilitation is the use of the unique Vegetation Direct
Transfer (VDT) which is estimated to result in the best restoration of the mine area vegetation
and habitat.
The VDT methodology can be viewed at:
https://vrxsilica.com.au/miningandrehabilitationmethodology/
Arrowsmith Central
VRX has referred a proposal for the Arrowsmith Central silica sand project to the Federal
Department of Water and Environment (DAWE) for assessment under the EPBC Act. During
the December 2021 quarter, VRX was advised by DAWE it has determined that the Proposal
is a Controlled Action and the statutory assessment approach timeframe will await a decision
by the WA Government to determine whether an accredited assessment is an appropriate
method.
The Arrowsmith Central Proposal was referred to the EPA under s. 38 of the EP Act on 10
September 2021. A notice for further information under s. 38F (1) and (2) of the EP Act was
then received on 8 December 2021.
VRX has requested and had approved an extension of time to the end of February 2022 to
supply the information requested to incorporate the additional material from the September
2021 detailed flora and vegetation study at Arrowsmith Central.
The revised Proposal was submitted 28 February 2022. The revised referral package replaces
the original s.38 referral that was submitted to EPA services on 10 September 2021.
As part of the notice requiring further information, the EPA requested the IBSA submission
reference number for any biodiversity surveys that were submitted to support the referral. This
information was provided.
Arrowsmith North and Central Aboriginal Heritage Surveys
Aboriginal heritage surveys have been completed at the Arrowsmith North (Arrowsmith North)
and Arrowsmith Central (Arrowsmith Central) Silica Sand Projects.
Two more comprehensive archaeological and ethnographic surveys over proposed mining
and critical infrastructure areas were completed over the past four months with representatives
of the Yamatji Southern Regional Corporation (YSRC) and SandS CRM personnel.
Advice received by the Company from YSRC confirms that all proposed long-term mining and
associated infrastructure areas are clear for the stated works to proceed. These areas include
the 360ha Arrowsmith North mine disturbance envelope, allowing for 30 years of mining, and
485ha of the Arrowsmith Central mine disturbance envelope that will allow for 20 years of
mining
In addition to the heritage surveys, the YSRC and SandS CRM consultants assisted VRX in
further understanding the presence of conservation significant fauna identified by the
Company’s fauna consultants. The YSRC and SandS CRM consultants were aware of VRX’s
Native Fauna Manual and asked to identify those species, or significant others not referenced
in the Company’s manual, that they had encountered during the survey. The Company is
pleased to report that no priority fauna was identified during the survey, with this outcome to
be included in VRX’s submissions for regulatory approvals.
In addition to the successful review and assessment by YSRC and SandS CRM consultants
of the Company’s Native Fauna Manual, this exercise will help support the future Ranger
Program to be developed by VRX in consultation with YSRC.
Muchea
Development of the Muchea silica sand project will follow once production has commenced at
Arrowsmith North.
Muchea will have access to established infrastructure such as grid power, is adjacent to the
Brand Highway and the underutilised railway which connects to the Kwinana Port (approx.
100km).
Gas pipelines run adjacent to the Muchea silica sand project and water will be accessed from
the Yaragadee deep aquifer.
The Company has had many overseas enquiries for Muchea silica sand and believes that the
consistent production of such high-grade silica sand with a low iron content will be in high
demand as raw material for the manufacture of premium ultra-clear cover glass production,
particularly for the burgeoning solar panel manufacturing industry. This interest continued
throughout the March 2022 quarter.
In July 2021, VRX commissioned Mattiske consulting to undertake a detailed springtime flora
and vegetation study on the priority area in the north of the Muchea silica sand project area.
This is in addition to a 2017 desktop survey and a field survey in spring 2018. The survey area
included 884ha of proposed mining area and proposed access routes.
During the quarter, VRX received a comprehensive flora and vegetation assessment of the
2021 survey area which includes:
1. An assessment of the area, at a suitable scale that allows the vegetation communities
to be delineated, including replicate survey sites in similar vegetation types to enable
statistical analysis of flora species data;
2. The collection and identification of the vascular plant species present in both the survey
sites and opportunistically in order for a more complete assessment of the flora in the
survey to be made;
3. A review of the conservation status of the vascular plant species recorded by reference
to current literature and listings by the Department of Biodiversity, Conservation and
Attractions (DBCA) and plant collections held at the Western Australian State
Herbarium (WAH), and listed by Department of Agriculture, Water and the Environment
(DAWE)(2019b) under the EPBC Act;
4. Collation and analysis of data and comparison with local and regional datasets and
analyses;
5. Definition and mapping of the vegetation communities, Floristic Community Types
(FCTs) and Site-Vegetation Types (SVTs) in the survey area;
6. Definition and mapping of the location of any Threatened or Priority flora and any
Threatened or Priority Ecological Communities located within the survey area;
7. Definition of any management issues related to flora and vegetation values; and
8. Provision of recommendations on the local and regional significance of the vegetation
communities
In combination with previous detailed fauna survey reports the detail in this report will allow
VRX to select areas of mining that will have the least impact to the environment and habitats.
Boyatup
VRX conducted a 206 hole, 312m, 400m x 800m spaced air core drill program at its Boyatup
Silica Sand Project, located approximately 100km east of Esperance, Western Australia.
Results of early work undertaken by VRX and the previous tenement holder indicated in-situ
sand grades up to 99.7% SiO2 with potential to produce a very low Fe2O3 product.
Drilling took 9 days with assay results to follow in late April 2022. This drilling campaign is
anticipated to enable a maiden mineral resource to be estimated. Drilling will also produce
bulk material for metallurgical testwork to determine the product quality that the project can
produce.
The drilling was undertaken pursuant to a program of work, or POW, approved by the
Department of Mining, Industry and Regulation and Safety of Western Australia.
A heritage (site avoidance) survey undertaken by the Esperance Tjaltjraak Native Title
Aboriginal Corporation (ETNTAC) cleared the area for the drill program.
Environmental desktop studies over the area have commenced with databases from the
Department of Biodiversity Conservation and Attractions (DBCA) received to review regional
data on:
1. Priority flora
2. Priority ecological communities
3. Threatened ecological communities; and
4. Significant fauna.
Hydrogen Supply
During the quarter, VRX signed a non-binding memorandum of understanding (MOU) with
Xodus Group Pty Ltd (Xodus) to explore the future supply of renewable hydrogen to the
Company’s silica sand projects as well as to potential, nearby glass-manufacturing facilities to
enable the production of net-zero glass.
Given the high quality and volume of silica sand at both Arrowsmith and Muchea and the close
proximity to energy infrastructure at both locations, VRX is exploring – in consultation with the
Western Australian Government and significant international industry players – the potential
for the development of glass-manufacturing facilities to take advantage of this tremendous
opportunity.
Glass manufacturing requires considerable energy inputs. The supply of renewable hydrogen
to power such glass-manufacturing facilities could potentially lead to the production of world
leading net-zero glass.
The MOU with Xodus establishes a platform for strategic confidential communication and
future co-operation between the parties. It contemplates the sharing of information with a view
to a future offtake of between 9,000 tonnes to 11,000 tonnes of hydrogen per annum, which
is adequate to supply a substantial glass-making facility.
Figure 1. Glass production float process
Research into replacing natural gas with hydrogen to power glass-manufacturing plants is well
advanced. Nippon Sheet Glass (NSG Group) recently announced that it had successfully
manufactured architectural glass at its facility in the UK in a world-first trial that used hydrogen
(https://www.nsg.com/en/media/ir-updates/announcements-2021/ag-production-powered-byhydrogen).
Potential for Glass Manufacturing in Western Australia
Both Arrowsmith and Muchea locations have substantial Mineral Resources that comprise
high-quality silica sand suitable to manufacture glass, with Muchea in particular suitable for
solar panel glass.
The high quality and substantial volumes of silica sand at both projects lend themselves to the
potential for development of nearby glass-manufacturing facilities. This potential has attracted
the interest of the Western Australian Government and international glass manufacturers and
could deliver potentially billions of dollars in foreign investment into the State.
As well as high quality and volumes of silica sand, glass manufacturing requires substantial
energy inputs. VRX is further exploring the potential for the supply of renewable hydrogen to
power glass manufacturing facilities to produce net-zero glass.
VRX believes it is the right time and Muchea is the right place for WA to maximise its economic
advantages of a very long-life high-grade silica sand supply and WA domestic gas reserves,
together with rapidly developing hydrogen projects in the Mid-West, for a high-tech ultra-clear
glass production capability at Muchea.
During the March 2022 quarter, VRX continued its consultation with the WA State Government
to attract foreign and local investment into the development of world-class glass manufacturing
and downstream processing industries in Western Australia.
Environmental, Social and Governance – ESG
VRX continues to deliver on its ESG responsibilities aligned to the UN’s Sustainable
Development Goals and published its maiden report in the 2021 Annual Report. This report
will be updated during the June 2022 quarter for inclusion in the 2022 Annual Report.
Metallurgical Testwork R&D
During April 2022, VRX has lodged registration for an R&D Tax Incentive Application for the
year ending June 2021 with AusIndustry.
The claim is for costs incurred for the R&D work undertaken by VRX and its consultants in the
core development of a new process route for high grade silica sand which includes the
recovery and testing of metallurgical composite samples, preparation and analytical testwork
to determine a process circuit design and subsequent engineering.
The claim period will extend to following years that R&D will be undertaken.
Corporate
During the quarter the Company announced that Ian Hobson has replaced John Geary as
Company Secretary, effective 1 January 2022. Mr Geary has remained with the Company,
undertaking a variety of other roles.
ASX Listing Rule 5.3 disclosures
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $60,000 related mainly to
tenement rents.
Payments for exploration & evaluation under investing activities of $403,000 consists mainly
of processing plant engineering design and related metallurgical test work and environmental
surveys and approvals costs.
There were no substantive mining production and development activities during the quarter.
Details of tenement activities:
During the quarter, the following tenements were granted:
None
During the quarter, the following tenements were applied for:
Mining Lease M70/1414
Details of related party payments:
The aggregate amount of payments to related parties and their associates of $144,000 shown
at paragraph 6.1 of the attached Appendix 5B represents directors’ fees and salaries paid
during the quarter.
----------------------The information in this document that relates to the estimation and reporting of the Mineral
Resource and Ore Reserves for the Arrowsmith North, Arrowsmith Central and Muchea Silica
Sand Projects is extracted from releases to ASX on 28 August 2019, 17 September 2019 and
18 October 2019, respectively. The Company confirms that it is not aware of any new
information or data that materially affects the information included in this document and all
material assumptions and technical parameters underpinning the estimates continue to apply
and have not materially changed.
This report has been authorised for release to ASX by the Board of Directors.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 540
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica Sand
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
E70/5817
M/1389
M/1392
L70/198
L70/199
L70/202
L70/203
L70/208
L70/230
L70/229
G70/264
G70/265
G70/266
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Application
Application
Application
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
Muchea Project – Silica Sand
Tenement
Status
E70/4886
E70/5157
E70/5548
E70/5651
M70/1390
M70/1414
L70/200
L70/204
L70/205
L70/206
Granted
Granted
Granted
Application
Granted
Application
Granted
Granted
Application
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
Boyatup Project – Silica Sand
Tenement
Status
E69/3560
E69/3668
Granted
Granted
Interest at
beginning of
quarter
100%
100%
About VRX Silica
VRX Silica Ltd (ASX: VRX) is developing world-class, high-grade silica sand projects in Western Australia.
The Arrowsmith North and Arrowsmith Central Silica Sand Projects, 270km north of Perth, comprise five granted
exploration licences and two granted mining leases. Bankable feasibility studies for both projects have demonstrated
exceptional financial metrics.
The Muchea Silica Sand Project, 50km north of Perth, comprises two granted and one under-application exploration
licences as well as one granted mining lease. Muchea is a world-class project with high-purity silica sand in situ. A
bankable feasibility study has demonstrated outstanding financial metrics.
The Boyatup Silica Sand Project, 100km east of Esperance, comprises two adjacent granted exploration licences.
Initial indications are that this project can complement the Arrowsmith and Muchea projects and add to the range of
silica products VRX Silica may be capable of producing.
Proven Management
VRX Silica’s Board and Leadership Team have extensive experience in mineral exploration and mine developmentto-production and in the management of publicly listed mining and exploration companies.
Silica Sand Projects Locations
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VRX SILICA LTD
Quarter ended (“current quarter”)
ABN
59 142 014 873
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 March 2022
Year to date
(9 months)
$A’000
Current quarter
$A’000
-
-
(60)
(220)
(b) development
-
-
(c) production
-
-
(d) staff costs
(225)
(575)
(e) administration and corporate costs
(194)
(1,148)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
12
1.5
Interest and other costs of finance paid (on
lease liability)
(2)
(7)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(478)
(1,938)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(227)
(330)
(d) exploration & evaluation
(403)
(1,871)
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Year to date
(9 months)
$A’000
Current quarter
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(630)
(2,201)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
4,438
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liability)
(17)
(50)
3.10
Net cash from / (used in) financing
activities
(17)
4,388
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
11,816
10,442
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(478)
(1,938)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(630)
(2,201)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(17)
4,388
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Year to date
(9 months)
$A’000
Current quarter
$A’000
-
-
10,691
10,691
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5,677
6,805
5.2
Call deposits
5,014
5,011
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
10,691
11,816
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
144
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(478)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(403)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(881)
8.4
Cash and cash equivalents at quarter end (item 4.6)
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
10,691
10,691
12
Note: if the entity has reported positive relevant outgoings
Share your feedback
Discover