Quarterly Activities Report
Released
Released
Announcement PDF
December 2019 Quarterly Update
The following is a summary of the activities conducted by VRX Silica Ltd (VRX Silica or
Company) (ASX: VRX) during the quarter ending 31 December 2019.
Muchea Silica Sand Project
Muchea BFS and Maiden Ore Reserve
On 18 October 2019 VRX Silica Limited announced details of its Bankable Feasibility Study
(BFS) and maiden Probable Ore Reserve at its Muchea Silica Sand Project (Muchea), located
50km north of Perth, WA.
This was the third BFS for the Company’s three advanced silica sand projects announced
during 2019.
Highlights:
•
Muchea has outstanding financial metrics and is capable of producing very highgrade silica sand products
•
Ungeared NPV10 of $338 million based on 25 years of a potential mine life of +100
years. Other key BFS outcomes:
•
Total Probable Ore Reserve of 18.7 Mt @ 99.9% SiO2 with 14.6 Mt @ 99.9% SiO2
in the Mining Lease application area
•
Studies identify three high-grade high-value silica sand products in high demand in
international markets
Exploration and Project Development
Muchea BFS and Maiden Ore Reserve
The Muchea Silica Sand Project (Muchea) is located 50km north of Perth (see Figure 1).
The Probable Ore Reserve for Muchea totals 18.7 Mt @ 99.9% SiO2 as reported in accordance
with the JORC Code, with 14.6Mt @ 99.9% SiO2 contained within the area of the Company’s
Mining Lease application (M70/1390) for Muchea.
This Reserve estimate is only a small portion of the silica sand Inferred Resource Estimate for
the project but produces a very high- grade product which is in high demand in specialist Asian
markets.
Muchea is a world class high-grade silica sand project which can support a substantial export
industry for WA providing benefits to the State and the Muchea-Gingin district.
Muchea will produce alternative high-grade products to Arrowsmith and will add to our available
catalogue of products from our silica sand projects. The Company has already had significant
interest in the Muchea product which will command higher prices than products from the
Company’s Arrowsmith North and Central silica sand projects.
Figure 1: Muchea Project Location
Financial model
Based on the capital and operating cost estimates a financial model was developed for the
purpose of evaluating the economics of the Project.
Key economic assumptions for the model are set out above and in detail in the BFS. The BFS
contains further details, including a life of mine production profile and sensitivity analysis for
the model.
Key outcomes from the BFS and summary financial model outputs are set out below, with the
first column showing outputs from the aggregated Probable Ore Reserve and the Inferred
Mineral Resource, and the second column showing outputs from the Probable Ore Reserve
only.
Mining from the area of the Probable Ore Reserve only supports a 9-10 year mine life. The
Company intends to mine solely from the Probable Ore Reserve during that period. The
financial model shows that Muchea is a viable project with the Probable Ore Reserve only,
and the Inferred Mineral Resource is not the determining factor for its viability. Key outcomes
from the BFS and summary financial model outputs are set out below.
Post Tax, ungeared NPV10
Muchea
(Inc. Inferred)
$337,900,000
Muchea
(Reserve Only)
$180,500,000
Post Tax, ungeared NPV20
$146,400,000
$104,600,000
Post Tax, ungeared IRR
96%
96%
Payback period (yrs) (post tax) (ramp up rate)
2.3
2.3
$0.70
$0.70
25
15
Total Sales (initial 25 years) no escalation
$3,345,000,000
$1,011,000,000
EBIT
$1,540,000,000
$447,000,000
Cashflow after finance and tax
$1,123,000,000
$321,000,000
404,318,617
404,318,617
$0.11
$0.09
$32,820,000
$32,820,000
20%
20%
$32.74
$33.84
54
16
(25 years) 48.3
(9-10 years) 14.6
Probable Ore Reserves @ 99.9% SiO2 (Mt)
18.7
18.7
Ore Reserve life (yrs)
9-10
9-10
JORC Resources (million tonnes)
208
208
Exchange Rate US$/A$
Life of Mine (yrs) (Scope of BFS Study)
Shares on Issue
EPS after tax (per year)
Capex (2 mtpa)
Capex contingency (inc)
Life of Mine C1 costs, FOB Kwinana (inc royalties)
Tonnes Processed (initial 25 years) (Mt)
Production Target (Mt) (BFS Study)
Notes:
1. There is a low level of geological confidence associated with inferred mineral resources and there is no
certainty that further exploration work will result in the determination of indicated mineral resources or that the
production target itself will be realised.
2. The Probable Ore Reserve and the Inferred Mineral Resource underpinning the above production targets have
been prepared by a Competent Person in accordance with the requirements of the JORC Code.
3. The material assumptions for the BFS are set out below. All such material assumptions continue to apply and
have not materially changed from the date of release of the BFS.
4. All figures are presented in Australian dollars, unadjusted for inflation.
Key points and assumptions
The BFS is based on only 25 years production from a potentially long-term +100 year mine
life.
The maiden Probable Ore Reserve of 14.6 Mt @ 99.9% SiO2 contained within the area of the
Company’s Mining Lease application and will support a 9-10 year project. This is estimated
from the Indicated Mineral Resource only and constitutes approximately 39% of the estimated
total production target (in terms of processed tonnes of silica sand) over the 25 year mine life.
The Company intends to mine solely from Probable Ore Reserves during the initial 9-10 years
of the project.
The balance is from the Inferred Mineral Resource of 61.4 Mt @ 99.6% SiO2 in the proposed
mining area which the Company intends to mine from year 10 onwards. The Company has
undertaken sufficient drilling to assume geological and metallurgical continuity of the sand
deposit. There is negligible difference between the modelled sand in each category. In order
to upgrade the Inferred Mineral Resource, the Company anticipates that an additional 2,000m
of aircore drilling will be required. The cost for drilling, assaying and associated studies is
estimated (at current rates) to be in the region of $200,000 and will need to be undertaken
within the first 9-10 years of mining operations. Given the simple nature of the silica sand
deposit at the project and the associated geological and metallurgical confidence, the
Company expects that this additional drilling will be sufficient to realise the production target.
Notwithstanding this, there is a low level of geological confidence associated with inferred
mineral resources and there is no certainty that further exploration work will result in the
determination of indicated mineral resources or that the production target itself will be realised.
The Company has been in discussions with both the Department of Premier and Cabinet and
the Department of Jobs, Tourism, Science and Industry to identify options for the Company to
gain access to ground within File Notation Area 12671 (FNA), which is for the proposed “Perth
and Peel Green Growth Plan for 3.5 million”. Whilst that ground sits outside the proposed
development area for the project and the FNA does not affect the modelled 25 years of
production at Muchea detailed in the BFS, the Company is seeking access to this ground to
extend the project’s mine life to well beyond 25 years, and potentially over 100 years. Further
details of the FNA are set out in the BFS.
The Company has met with various local Members of State and Federal Parliament with great
support for the project. The project will be a potentially new long-term industry for Western
Australia with substantial economic benefits, including long-term employment and royalties with
a significant economic contribution to the Muchea-Gingin district.
The Company has engaged with the Department of Water and Environmental Regulation
following preliminary environmental studies to identify key issues pertaining to the project
environmental approvals for mining particularly the vegetation for potential foraging by
Carnaby’s cockatoos.
VRX Silica has developed a mining and rehabilitation methodology specific to the environment
at Muchea which will enable a successful restoration of mined areas.
A key challenge for industrial minerals projects is meeting market specifications. The silica sand
market has specifications for parameters such as purity (e.g. SiO 2 content) in addition to tight
specifications for trace elements such as Fe, Ti, Al and Cr in the glass industry.
The Company is confident that it can meet specifications for the ultra-clear glass market from
Muchea.
Key economic assumptions for the Muchea BFS are as follows:
Currency
Australian dollars
Sales contracts in Asia for silica sand are invariably based $US and a A$0.70
exchange rate has been applied
Project life
25 years
Total Probable Ore Reserve alone supports a 9-10 year project. Mining will
occur solely from the Probable Ore Reserve during the first 9-10 years.
There is a reasonable expectation that with further close spaced drilling the
existing Inferred Mineral Resource would convert to Indicated Mineral Resource
and subsequently Probable Ore Reserve. This will increase the mine life to well
in excess of this time period, however the model is conservatively restricted to
25 years
Depreciation
15% rate on capital
Corporate tax rate
27% on taxable profit
Production
Steady state of production from Probable Ore Reserves over life of mine, with
the first 2 years at 1 million tonnes per year and thereafter at 2 million tonnes
per year
The Company has currently expressions of interest and letters of intent to
purchase 3.5 million tonnes per year of Muchea products and expects further
interest once these products are made available to the market
Shares on Issue
404,318,617
NPV estimation discount
rates
Standard financial modelling conducted at both 10% and 20% discount rates.
The 20% rate is generally above standard reporting rates but demonstrates that
the Project is still financially robust at this higher rate
Capital cost
Based on estimates ±15% from engineering companies with extensive
experience in sand separation
Operating costs
A$32.74 C1 costs, including royalties
Based on first principles and current rates for equipment
Sales revenue
US$38-55 (A$54-79) per dry metric tonne dependent on product type, product
quality, contract terms and sales quantity
Revenue is constant based on current prices and ignores any projected growth
in prices
Maximum debt
A$30 million
Borrowing rates
12%
Accounts receivable
30 days
Accounts payable
30 days
Plant maintenance
5% of capital cost per year
Environmental bond
A$500,000
May be substituted by the WA Department of Mines, Industry Regulation and
Safety’s “Mining Rehabilitation Fund”
Capex contingency
20%
Recoveries
Muchea F80C (80ppm Fe2O3)
20%
Muchea F80
(80ppm Fe2O3)
48%
Muchea F150 (150ppm Fe2O3)
20%
Recoveries are based on CDE testwork at ±5%
Probable Ore Reserve
The Probable Ore Reserve for Muchea totals 18.7 Mt @ 99.9% SiO2 as reported in accordance
with the JORC Code with 14.6Mt @ 99.6% SiO2 contained within the area of the Company’s
Mining Lease application (MLA70/1390).
VRX Silica has previously announced1 an upgraded MRE for Muchea of an Indicated Mineral
Resource of 29 Mt @ 99.6% SiO2 in addition to an Inferred Mineral Resource of 179 Mt @
99.6% SiO2 for a Total MRE of 208 Mt @ 99.6% SiO2, see Table 1.
Classification
Million Tonnes
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
Indicated
29
99.6
0.09
0.03
0.07
0.22
Inferred
179
99.6
0.05
0.02
0.1
0.23
Indicated + Inferred
208
99.6
0.06
0.02
0.1
0.23
*Note: Interpreted silica sand mineralisation is domained above a basal surface wireframe. The upper
(overburden) layer within 0.5 m of surface is depleted from the modelled silica sand unit, being reserved for
rehabilitation purposes. All classified silica sand blocks in the model are reported. Differences may occur
due to rounding.
Table 1: Muchea Silica Sand Mineral Resource Estimate as at September 2019
VRX Silica has now completed necessary work to convert the Indicated Mineral Resource to
Probable Ore Reserves.
Table 2 details the Probable Ore Reserve that will be produced from the mining of the Indicated
Mineral Resource and processing in a purpose built, wet sand processing plant. The plant will
produce three saleable products for different markets with a total Probable Ore Reserve of
18.7 Million tonnes, with 14.6Mt @ 99.6% SiO2 contained within the Mining Lease application
(M70/1390) area.
48%
Million
Tonnes
10.2
Within
M70/1390
Million
Tonnes
8.0
20%
4.25
20%
Ore Reserve
Classification
Probable
Global
Product
Recovery
Muchea-F80
MucheaF80C
MucheaF150
Total Reserve
Al2O3
%
0.02
Fe2O3
%
0.008
3.3
SiO2
%
+99.
9
+99.
0.02
0.008
4.25
3.3
9
99.8
0.07
0.015
18.7
14.6
LOI
%
0.1
0
0.03
5
0.1
Sieve Opening (μm Retained)
Particle Size
Product
Muchea-F80
850
600
0.5%
425
49%
Muchea-F80C
9.0%
90.0%
1.0%
Muchea-F150
TiO2
%
0.03
0
0.03
300
50%
212
0.5%
150
106
0.5%
88%
11%
0.5%
Table 2: Muchea Silica Sand Probable Ore Reserve as at October 2019
1ASX announcement of 17 June 2019, “Muchea Mineral Resource Estimate Upgrade”.
75
0.1
Metallurgical Factors
CSA Global reviewed the metallurgical testwork to comply with Clause 49 of the JORC Code 2.
CSA Global has concluded that the available process testwork indicates likely product qualities
for glass and ceramics is considered appropriate for eventual economic extraction from
Muchea. In addition, potentially favourable logistics and project location support the
classification of the Muchea deposit (in accordance with Clause 49) as an industrial mineral
with an Inferred/Indicated Mineral Resource.
The extensive metallurgical testwork which has been completed by CDE Global at their facility
in Cookstown, Northern Ireland, and Nagrom in Kelmscott, Perth, allowed for the creation of
a catalogue of silica sand products that could be produced from Muchea 3 (see Table 3).
These products become the recovered products which make up the Ore Reserve (see Table
2).
Chemical Composition
SiO2
Product
%
Muchea-F80 +99.9
Al2O3
%
0.02
Fe2O3
%
0.008
TiO2
%
0.030
CaO
%
0.005
MgO
%
0.001
K2O
%
0.004
Muchea-F80C
+99.9
0.02
0.005
0.030
0.005
0.001
0.004
Muchea-F150
99.8
0.07
0.015
0.035
0.020
0.001
0.004
Sieve micron and % retained on sieve
425
300
212
150
106
49% 50%
0.5%
75
Particle Size
Product
Muchea-F80
850
600
0.5%
Muchea-F80C
9.0%
90.0%
53
1.0%
Muchea-F150
0.5%
88%
11%
0.5%
Table 3: Muchea saleable products from catalogue
The mass balance of the particle sizes was analysed allowing for the recoveries of these
products in a wet processing plant to be estimated.4 The recovery of each product is shown in
Table 4.
Product
Industry
Recovery
Muchea-F80
Glassmaking
48%
Muchea-F80C
LCD
20%
Muchea-F150
Glassmaking
20%
Total Recovery
88%
Table 4: Muchea Product Recovery
2 Reviewed as part of the metallurgical testwork for the Muchea maiden MRE, see ASX announcement of
20 November 2018, “Muchea Silica Sand Project Maiden Resource”.
3ASX announcement of 26 February 2019, “Testwork Update and Product Catalogues”.
4ASX announcement of 3 May 2019, “High Recovery from Silica Sand Process Plant Design”.
Material Modifying Factors – Environmental Studies
Development location:
•
Mining is 100% on Unallocated Crown Land
•
East of the Yeal Nature Reserve and State Forest
•
West of Freehold land
•
South of Gingin Airfield
•
Approximately 25 km inland of the coast
•
West of Chandala Brook (Registered Aboriginal Heritage Site)
•
Outside of World Heritage Areas, National Heritage Places, Ramsar Wetlands,
Conservation Reserves or Commonwealth Marine Reserves
The Probable Ore Reserve is located within an area of deep Bassendean sands, leached of
nutrients. The vegetation type is Banksia Woodlands. The topography is low to medium dunes.
Material Modifying Factors – Mining Factors
The mining method chosen for Muchea is a rubber wheeled front-end loader, feeding into a
3mm trommel screen to remove oversize particles and organics. Undersize sand is slurried
and pumped to a sand processing plant located proximal to the Moora-Kwinana railway line.
After processing, the silica sand is then loaded into railway trucks for bulk export from the
Kwinana Bulk Terminal.
Mining of the in-situ sand will extract to the extent and base of the Indicated
Resource/Probable Ore Reserve leaving a slightly undulating surface. Appropriate buffer
zones are left from the adjacent stakeholders such as freehold land and the Dongara-Pinjarra
gas pipeline. The pre- and post-mining topography is shown in Figures 2 and 3. 100% of the
material in the mining area is considered to be sand that can be beneficiated to a saleable
silica sand project. The top 500mm has been excluded from the MRE as it will be reserved for
rehabilitation purposes. As there is no waste material, the recovery factor is considered to be
100% and ore loss therefore is considered to be 0%.
Figure 2: Muchea Pre-Mining Topography (10:1 vertical exaggeration)
Figure 3: Muchea Post-Mining Topography (10:1 vertical exaggeration)
Material Modifying Factors – Environmental Studies
Development location:
•
Mining is 100% on Unallocated Crown Land
•
East of the Yeal Nature Reserve and State Forest
•
West of Freehold land
•
South of Gingin Airfield
•
Approximately 25 km inland of the coast
•
West of Chandala Brook (Registered Aboriginal Heritage Site)
•
Outside of World Heritage Areas, National Heritage Places, Ramsar Wetlands,
Conservation Reserves or Commonwealth Marine Reserves
The Probable Ore Reserve is located within an area of deep Bassendean sands, leached of
nutrients. The vegetation type is Banksia Woodlands. The topography is low to medium dunes.
Mine Plan
The production target for Muchea incorporates the maiden Probable Ore Reserve of 14.6 Mt
@ 99.9% SiO2 that sits within the Mining Lease application area (see above under “Probable
Ore Reserve”) as well as a portion of the Inferred Mineral Resource.
The Inferred Mineral Resource available to mine within the Mine Plan Pit is 61.4 Mt @ 99.6%
SiO2.
In designing the Mine Plan Pit, the Company has examined the restrictions and constraints on
mining activities in the context of surrounding areas and the interests of stakeholders, and
planned accordingly. To that end, the Mine Plan Pit ensures:
•
mining will not occur any closer than 100m to the Dongara to Pinjarra gas pipeline;
•
mining will not occur any closer than 200m to the boundary of any freehold land and will
be at least 600m from the nearest house; and
•
the Mining Lease area does not intersect with the Gingin Airfield ground and mining will
not occur any no closer than 250m to the boundary of the Gingin Airfield. In addition,
mining will not occur under the flight lines to and from the airfield.
These buffer zones are at least equal to, or are in excess of, industry practice and legislative
requirements (if any). In addition, the western boundary of the Mine Plan Pit is contiguous
with the FNA (see above under “Key points and assumptions”) and does not intersect with any
proposed conservation area under the Green Growth Plan.
The Mine Plan Pit therefore is not impacted by any known exclusion areas.
The maiden Probable Ore Reserve is estimated from the Indicated Mineral Resource only.
This constitutes approximately 30% of the estimated total production target (in terms of
processed tonnes of silica sand) over the 25 year mine life for the project BFS estimates. It
provides sufficient tonnage for the first 9-10 years of mining operations. The Company intends
to mine solely from the Probable Ore Reserve during that period. Key assumptions
underpinning the financial model for the Project are set out below, including timing for project
start-up and ramp-up to full capacity. The financial model (see below and in the BFS) shows
that Muchea is a viable project with the Probable Ore Reserve only, and the Inferred Mineral
Resource is not the determining factor for its viability.
The ore which forms the Inferred Mineral Resource is contiguous with the Indicated Mineral
Resource and has been categorised as lower confidence due to wider spaced drilling. (Drilling
of the Indicated Mineral Resource is typically 50m spaced along existing tracks, whereas the
Inferred Mineral Resource is drilled on a 400m spacing along existing tracks.)
The Company has undertaken sufficient drilling to assume geological and metallurgical
continuity of the sand deposit. There is negligible difference between the modelled sand in
each category and it is believed an additional 1,500m of drilling would be required to upgrade
the inferred resource category. The cost for drilling, assaying and associated studies is
estimated (at current rates) to be in the region of $250,000 and will need to be undertaken
within the first 9 years of mining operations.
Given the simple nature of the silica sand deposit at the Project and the associated geological
and metallurgical confidence, the Company expects that this additional drilling will be sufficient
to realise the production target.
Notwithstanding the above, there is a low level of geological confidence associated with
Inferred Mineral Resources and there is no certainty that further exploration work will result in
the determination of Indicated Mineral Resources or that the production target itself will be
realised.
Figure 4: Muchea Post-Mining of Ore Reserves and Inferred Resources
Topography (5:1 vertical exaggeration)
Probable Ore Reserve within green boundaries and Inferred Mineral Resource within blue boundaries.
Assessment Process:
•
Pre-referral submission to Department of the Environment and Energy (DotEE)
•
Final referral submission to DotEE
•
Submission of Section 38 referral to the State Environmental Protection Authority (EPA)
•
Seek an Accredited Environment Protection and Biodiversity Conservation Act 1999 (Cth)
Assessment under the State Environmental Protection Act 1986 (WA) via an
Environmental Review Document with public comment
•
Undertake any further studies required
•
Submission of Environmental Review Document
Mitigation Strategies
•
Proposed action lies within a large development envelope, allowing for the flexibility to
target areas of lower significance to Matters of National Environmental Significance
(MNES)
•
Disturbance will be kept to a minimum, up to 35 ha per year and 14 ha at any one time
•
Progressive rehabilitation using topsoil re-location to ensure topsoil and plants are
translocated intact to previously mined areas
•
Conduct further surveys to identify MNES
•
Use findings to steer the project and avoid MNES where possible
There are no mine tailings storage requirements, there are no waste dumps and processing
requires no chemicals.
Material Modifying Factors – Infrastructure
The project is located on vacant, unallocated crown land which is east of the Yeal Nature
Reserve and State Forest, west of Freehold land and south of the Gingin Airfield. The southern
boundary is the limit of tenure. The Brand Highway is proximal to the area and access is via
the sealed Timaru Road from Brand Highway. The rail line to the Kwinana Bulk Terminal runs
east of the Brand Highway and will be used to transport the processed silica sand to the
Kwinana Bulk Terminal for bulk export.
The project will require its own water infrastructure and power is reticulated from alongside
Brand Highway. As there will be no accommodation at the mine site labour will be sourced
from the nearest towns, Gingin and Muchea (approximately 12km and 14 km, respectively,
from the mine site).
Costs
Operating costs
Operating costs were determined from first principles and are estimated to include all costs to
mine, process, transport and load product on to ships.
Royalties
The prevailing rate of royalty due to the State is used in VRX’s economic assessments. The
State Royalty rate is A$1.17 per dry metric tonne and reviewed every 5 years with the next
review due in 2020.
A 1% net production royalty from the project will be payable to Australia Silica Pty Ltd.
There are no other royalties payable, though a royalty is in the process of being negotiated
with Native Title claimants and has been included in the project metrics.
Revenue
Product Quality
Multiple products will be differentiated during processing subject to required particle size
distribution by screening. Recovery of products has been independently assessed by CDE
Global, a world leading silica sand testing laboratory.
Commodity Prices
Commodity prices for silica sand products have been determined by independent industry
source Stratum Resources. The industry standard is that sales contracts are in US dollars.
The exchange rate to convert to Australian dollars will be the prevailing rate at the time of
payment.
Subject to final quality produced, the prices for the commodity will range from US$38 to US$55
per dry metric tonne FOB. There will be no other treatment, smelting or refining charges and
no shipping cost estimates with all contracts to be based on FOB rates.
Revenue will be based on a negotiated per shipment basis per dry metric tonne FOB with
payment by demand on an accredited bank letter of credit.
Market Assessment
The Company has commissioned an independent assessment of the current market prices for
proposed products by industry leader Stratum Resources. The assessment includes
projections for future demand and supply of silica sand and concludes that there is a future
tightening of supply of suitable glassmaking silica sand with a commensurate increase in price.
Sales volumes have been estimated as a result of received letters of intent and expressions
of interest to purchase products.
Economic Factors
The Company’s economic analysis has calculated at a 10% discounted ungeared post tax net
present value (NPV10). A 20% discounted NPV has also been calculated to demonstrate the
strength of the economic analysis.
The assessment has not considered any escalated future product prices nor any inflation to
operating costs. The analysis has used a US$/A$ exchange rate of US$0.70/A$1.00.
The analysis is based on a 25 year production profile with the Probable Ore Reserve
supporting a 9-10 year project. Mining will occur solely from the Probable Ore Reserve during
that period. There is a reasonable expectation that with further close spaced drilling the
existing Inferred Resources would convert to Indicated Resources and Probable Reserves
well in excess of this time period, however the model is conservatively restricted to 25 years.
See above for further information.
Capital requirements are based on independent estimates.
The analysis is most sensitive to the exchange rate and sales prices. The analysis indicates
the financials of the project are very robust and there is a high confidence that a viable longterm mining operation can be justified.
Due to the higher-grade products the average sales price of Muchea silica sand products is
higher than those from the Arrowsmith silica sand projects.
Social Factors
The Company lodged an application for a Mining Lease (M70/1390) on 17 January 2019. The
application lies within the Whadjuk native title claim boundaries (WAD242/11), which is part of
the South West Native Title Settlement. The Whadjuk people are represented by the South
West Aboriginal Land and Sea Council Aboriginal Corporation. The Company is currently in
negotiations with the claimant group with respect to this mining lease application including the
Miscellaneous Licences applications required to access the project area, and the Company
expects that an agreement will be reached between the parties allowing for the Mining Lease
to be granted.
The project is wholly on unallocated crown land with little negative impact on local
communities.
Project Funding
The financial model summarised in the BFS sets out the project metrics and provides a basis
for the potential capital structure of the Company for the development of the project. Total
capital expenditure at Muchea (for a 2 million tonnes per annum processing plant) is estimated
at approximately A$33 million (the BFS details capital cost estimates).
The Company anticipates that the source of funding for the capital investment at Muchea will
be any one, or a combination of, equity, debt and pre-paid offtake from the project. Whilst no
final decision has been made in that regard, the financial model assumes a maximum A$30
million in debt.
The Company has received a number of enquiries and expressions of interest from debt
financiers for the project. As noted above, the financial model provides for debt capacity and
is designed to meet the expectations of any providers of potential debt funding for their due
diligence and other internal requirements.
In addition, VRX Silica has also received enquiries and expressions of interest from
organisations across Asia for silica sand products from the project and holds signed letters of
intent for substantial tonnages. A number of these organisations have expressed interest in
becoming a funding partner of the Company for development of a mine by way of pre-paid
offtake arrangements or commercial debt funding.
The balance of the Company’s capital requirements will be funded from equity capital.
Whilst the envisaged project development requires a low capital intensity relative to a
greenfields hard rock mining project, and any one of, or a combination of equity, debt and prepaid offtake is planned, VRX Silica has not as yet secured the required capital. The positive
financial metrics of the BFS and feedback from potential funding partners provides
encouragement as to the likelihood of meeting optimum project and corporate capital
requirements.
Muchea, Arrowsmith North and Arrowsmith Central Project Metrics
Key BFS outcomes for Muchea, Arrowsmith North and Arrowsmith Central, and
Share your feedback
Discover