Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
28 October 2022
ASX ANNOUNCEMENT
September 2022 Quarterly Activity Report
The following is a summary of the activities conducted by VRX Silica Limited (VRX or
Company) during the September 2022 quarter at its silica sand projects at Arrowsmith North,
Arrowsmith Central (located 270 km north of Perth), Muchea (located 50 km from Perth) and
Boyatup (located 100 km east of Esperance), all situated in Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand exploration and development
company with four high-value, advanced, very long-term silica sand projects in Western
Australia, a Tier 1 mining region.
The Company has multi-decade scale contiguous sand deposits on granted Mining Leases
with secure tenure and a combined +1.1Bn tonne Mineral Resource1 of 99.6% to 99.9% SiO2
grade silica sand.
The Company and its management team is WA based as are its four large scale, high-grade
and low impurity silica sand projects. Each project can be run independently and supply highgrade silica sand to many diverse markets.
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and water. It is the main
ingredient in all types of glassmaking, including specialty solar panel and high-tech glass.
The glass manufacturing industry demand is increasing at a rate of 5-6% per year, or about
8-10 million tonnes pa. Around 47% of the world’s glass is manufactured in Asia.
Silica sand is an essential component of the foundry and casting industries. The largest
foundry industry is in Korea where it dominates the industry particularly for large marine
components.
Silica sand is also the main ingredient in concrete.
Silica sand is a finite resource that is rapidly being exhausted and the Asia-Pacific region is
currently experiencing increasing demand at a time of a global supply shortfall.
A Project development pipeline to ensure a disciplined, staged development of
world-class assets
The Arrowsmith North silica sand project (Arrowsmith North) will lead a staggered and
disciplined development program, followed by the Muchea silica sand project (Muchea) and
Arrowsmith Central (Arrowsmith Central) silica sand project.
VRX has the most-developed ASX listed company silica sand projects in Australia with
planning, Aboriginal heritage, environmental approvals, metallurgical testwork studies and
plant engineering well advanced having commenced in 2017.
Mining Leases are granted over these three projects as well as various Miscellaneous
Licences for access with permitting and infrastructure preparations well-advanced.
1
See table at page 13
The scale of the projects provides for a long-term opportunity for silica sand export and
potential for glass manufacturing and downstream industries in Western Australia.
Arrowsmith North
The mining and processing operation is relatively simple and low impact with long-term
production expected to commence initially at Arrowsmith North on the 223Mt Probable Ore
Reserve @ 99.7% SiO2 in 2023, subject to final environmental approvals.
A revised capital estimate is currently underway on a tailored 2Mtpa processing plant with a
unique patented custom process circuit.
The results of additional bulk testwork programs undertaken during the March and June 2022
quarters were received in August 2022. These programs produced sufficient final product for
the large samples (50-60kg) required for glassmaking furnace testing and foundry resin
coating testing. The samples have been forwarded to an extensive list of potential buyers.
The Company has identified long-lead items and has commenced the specification and
production of tender documentation of processing equipment for the plant in preparation for
the procurement process in order to enable a timely construction program following a decision
to mine at Arrowsmith North.
Engineering
The Company has undertaken significant steps to finalise the processing circuit design to
produce multiple products and to finalise the detailed engineering required for construction.
The final design phase is progressing to shop detailing of all disciplines - steelwork,
mechanicals, pipework, electrical, air, etc.
The execution schedule has been recently updated with revised lead times for major
equipment. Well-documented supply-side constraints, including the continued application of
COVID lockdowns in China, is affecting equipment delivery globally, and there is little certainty
with quoted lead times. Specification and tendering of long lead time equipment is essentially
complete and is now waiting on VRX final approval to commence procurement of these major
items.
Process Water
A process water bore was successfully drilled to access water from the Yarragadee North
deep aquifer with aquifer testing to supply data for an abstraction licence application for 0.9Gl
of water. Monitoring boreholes for the borefield have been completed. The plant has been
designed to operate predominately with recycled water.
Power Supply
A number of gas wellheads are in close proximity to the project area. The Company is
evaluating the potential and costs to establish a power supply from locally produced LNG.
Logistics
Arrowsmith North has access to established infrastructure such as the unused rail line (from
Eneabba to Geraldton) which runs adjacent to the Arrowsmith project tenements. The
Company is in discussions to finalise its logistics plans with Mid West Ports Authority (for
export of silica sand product from Geraldton Port) and with the rail owner, Arc Infrastructure
(for transport to port and a dedicated train unloader at the Geraldton Port in the medium to
long term).
The Company has access to the adjacent Brand Highway and a 100% detailed road
intersection plan has been submitted to Main Roads for approval to enable road transport of
silica sand product in the short term.
Approvals
VRX has conducted extensive environmental studies over the Company’s silica sand projects
over a number of seasons in anticipation of requirements of the State and Federal
environmental regulation authorities to undertake approvals assessments. These surveys
commenced shortly after the tenements were acquired and the number and extent of these
surveys have expanded following further consultation with these authorities. The Company
has initially concentrated on gaining approval for development of the Arrowsmith North project.
VRX has received confirmation from the Commonwealth Department of Agriculture, Water
and the Environment (DWER) for accredited approval under the Environment Protection and
Biodiversity Conservation Act 1999 (EPBC Act). Accreditation of the Environmental Protection
Authority of Western Australia’s (EPA) assessment processes means that the Commonwealth
can rely on environmental assessments undertaken by the EPA for the purpose of its approval
decisions under the EPBC Act on proposals that are likely to have a significant impact on a
matter of national environmental significance. If the EPA assesses a proposal at the level of
Public Environmental Review (PER), as is the case for Arrowsmith North, separate
assessment by the Commonwealth is not required.
The Environmental Scoping Document was lodged with the EPA in September 2021 and
approved in April 2022.
During May 2022 the Company lodged the Environmental Review Document (ERD) with the
EPA for Arrowsmith North. The ERD document is required under the EPA’s public
environmental review process and will be released for public review following the review by
the EPA and other relevant authorities. The ERD was prepared according to the procedures
in the EPA’s Environmental Impact Assessment (EIA; Part IV Divisions 1 And 2) Procedures
Manual (EPA, 2021b). The ERD is a comprehensive summary of the project environmental
setting, the physical elements of the mine and infrastructure, operational elements, the extent
of effects on the environment and the proposed rehabilitation and closure plan. The Company
received a request from the EPA for further information on 4 July 2022 and the response was
submitted on 12 July 2022. The Company awaits EPA confirmation that the document will
been released for public review.
The indicative timetable for the development of Arrowsmith North anticipates final EPA
approval in December 2022, with the six-month construction phase scheduled to commence
in January 2023 subject to Ministerial Consent.
An important feature of the EPA Proposal is the proposed rehabilitation methos to use the
unique VDT method which is estimated to result in the best restoration of the mine area
vegetation and habitat.
The VDT methodology can be viewed at:
https://vrxsilica.com.au/miningandrehabilitationmethodology/
Key Plant Equipment
VRX has previously announced the start of project capital expenditure for its Arrowsmith North
processing plant, with the purchase of two major items of sand processing capital equipment.
With the support of specialist engineering consultancy ProjX, VRX purchased locally a 3m
diameter x 8m long RCR-designed feed trommel and a 3.6 x 8.5m Schenck “banana” vibrating
screen. This equipment has been stripped and assessed for refurbishment by Bunbury based
workshops.
Figure 1: Feed trommel barrel and surge bin
Figure 2: Feed trommel support and base
The banana screen has undergone strip, non-destructive testing and refurbishment by the
OEM (Original Equipment Manufacturer) and after painting the work is complete.
Figure 3: Refurbished Schenck banana screen
VRX will continue to pursue other lead time and cost-saving opportunities to capitalise on its
first-mover advantage in Western Australia’s emerging silica sand sector, at a time when there
is fast-rising global demand for high-quality, responsibly sourced silica sand volumes.
Arrowsmith Central
Arrowsmith Central is the second of the Company’s silica sand projects under development.
Approvals
Arrowsmith Central Silica Sand Project (Arrowsmith Central) has moved to the next stage of
the environmental approval process with the EPA.
On 20 June 2022 the Company lodged an Environmental Scoping Document (ESD) which
details the environmental studies that are required to inform the assessment of the project.
Lodgement of the ESD is a fundamental step in the EPA administration procedures to inform
the Environmental Impact Assessment of Arrowsmith Central. The Company is confident the
project has addressed the Environmental Principles, Factors and Objectives of the guidelines
for assessment.
The Company is waiting on the EPA response.
The Company is not in a position at this stage to set a definitive timeline for the approval
process.
Process Water
On 6 September 2022 VRX Silica Limited announced the completion of the test holes for 2
production water bores which will be the source of water supply for the proposed processing
plant at Arrowsmith Central. The borehole drilling and construction is completed and downhole
logging and test pumping is underway to compile the required data for the H3 assessment for
the abstraction licence.
Figure 4: Arrowsmith Central Location showing water bore location
DWER has accepted the Company’s application for an allocation of 900,000 kilolitres.
Figure 5: Water Bore Rig onsite
Muchea
Development of Muchea will follow development at Arrowsmith North.
Muchea will have access to established infrastructure such as grid power and is adjacent to
the Brand Highway and the underutilised railway which connects to the Kwinana Port (approx.
100km).
Gas pipelines run adjacent to Muchea and water will be accessed from the Yaragadee deep
aquifer.
The Company has had many offtake enquiries for Muchea silica sand from Asian markets and
believes that the consistent production of such high-grade silica sand with a low iron content
will be in high demand as raw material for the manufacture of predominately premium ultraclear glass production, particularly for the burgeoning solar panel manufacturing industry. VRX
continues to receive these enquiries on a regular basis.
Environmental Studies
Detailed springtime flora and vegetation studies are underway on a selected priority area of
350Ha.
This survey will comply with the requirements of the Environment Protection Authority
Environmental Factor Guideline: Flora and Vegetation, and Technical Guidance – Flora and
Vegetation Surveys for Environmental Impact Assessment (2016a and 2016b).
The following work will be undertaken:
a. Updated desktop covering the revised priority area boundary
b. Field studies covering access routes (North and South).
c. Field studies including additional 10m x 10m plots in representative areas of communities
d. Targeted searches on 20m grid line basis (100km of searching)
e. The relevant results of Root studies undertaken by Mattiske with Professor Pate and Jon
Dodd will have major species included in the updated report
f.
Finalisation of documents for the EPA assessment associated with flora and vegetation
values.
Final report to include both previous survey results and the current survey results from
quadrats, targeted searches as well as historical information that relates to the root structure,
density and distribution of the key species.
Exploration
A drill program completed 54 holes to produce a two-tonne sample to be used in an additional
pilot plant metallurgical test work program.
The program was designed to determine if selective mining and processing of the
differentiated layers, identified in previous test work, can produce a higher-purity product,
therefore significantly enhancing Muchea’s project economics.
The program also generated further samples for testing following overwhelming interest from
potential offtake partners.
The drill program at Muchea was undertaken along existing cleared tracks, with an approved
Program of Work from the Department of Mines, Industry Regulation and Safety (DMIRS).
Boyatup
Results of early work undertaken at Boyatup by VRX and the previous tenement holder
indicated in-situ sand grades up to 99.7% SiO2 with potential to produce a very low Fe2O3
product.
In March 2022 VRX conducted a 206 hole, 312m, 400m x 800m spaced air core drill program
at its Boyatup Silica Sand Project which took 9 days to complete.
On August 18, 2022 VRX Silica Limited announced the Mineral Resource Estimate (MRE) for
its Boyatup Silica Sand Project.
The estimate has utilised a comprehensive collation of assays and Particle Size Distribution
(PSD) on the drill samples collected.
The MRE results are shown in Table 1. Summary information is included in the announcement
of 18 August 2022 “Boyatup Silica Sand Project Maiden Mineral Resource”.
Classification
Mt
SiO₂
%
Al₂O₃
%
Fe₂O₃
%
TiO₂
%
LOI
%
Inferred
60
97.8
0.83
0.23
0.13
0.88
Total
60
97.8
0.83
0.23
0.13
0.88
*Note: Interpreted mineralisation is above a basal layer of clay and/or gravel. Depletion zones include the
upper 0.3 m excluded for rehabilitation purposes. Only areas with a minimum sand depth of 1m were
included. Differences may occur due to rounding.
Table 1: Boyatup Mineral Resource
A comprehensive metallurgical testwork program is planned to determine the specification of
the potential products that can be produced from the in-situ sand resource at Boyatup. Initial
work suggests that the potential products are different from those from the other VRX silica
sand projects, due to the different particle size, shape and quality.
Once the potential products that can be produced are identified a marketing study will be
completed to determine the focus to maximise the economic value of the project.
Geothermal Energy Resources
In January 2022 DMIRS released 21 areas in Western Australia for applications for
Geothermal Exploration Permits with a closing date for applications of 21 April 2022.
VRX made a number of applications for permits proximal to the Company’s current Arrowsmith
North and Arrowsmith Central silica sand holdings.
The applications were made as part of VRX’s overall green energy intentions as demonstrated
by the hydrogen gas MOU signed with XODUS Energy Pty Ltd and embodied in the
Company’s ESG statement (see below).
VRX has not received any notification at this stage regarding these applications.
Environmental, Social and Governance – ESG
VRX committed to a series of Environmental, Social and Governance (ESG) initiatives ahead
of the release of its FY21 Sustainability Report, the first one to be published by the Company
and included in the 2021 Annual Report.
VRX is conscious of its social licence obligations, not only in proactively engaging with the
traditional owners and other stakeholders in the region, but also as an emerging global
supplier, to join the world movement towards a low-carbon future.
During the quarter, with the assistance of ESG specialist Futureproof Consulting, the
Company completed its FY22 Sustainability Report, which was published and included in the
2022 Annual Report, released on 30 September 2022.
With the support of Futureproof, VRX will continue to measure, monitor and report on its
sustainability progress as the Company adapts to the growing demands of investors and
stakeholders to implement and improve its ESG strategies and reporting practices.
Metallurgical Testwork R&D
During April 2022, VRX lodged a registration for an R&D Tax Incentive Application with
AusIndustry for the year ending June 2021.
The Company will prepare an additional claim for the year ending June 2022.
Corporate
There was no material corporate activity during the quarter.
Events Subsequent to the End of the Quarter
WA Investment Attraction Fund
In July 2019 the Western Australian State Government released Diversity WA to provide an
economic development framework for the State. It sets out initiatives, actions and strategies
that will contribute to achieving its vision for “a strong and diversified economy delivering
secure, quality jobs through increased investment across abroad range of industries”. It also
identifies priority sectors for strategic development that match Western Australia’s unique
strengths with global trends to achieve growth across the economy.
As part of the initiative, successful applicants will be eligible for financial assistance in the form
of grants and other incentives, subject to a Financial Assistance Agreement (FAA) from the
Investment Attraction Fund.
In May 2022 VRX made a preliminary application under Stage 1 of the scheme (Expressions
of Interest) and at the end of August 2022 the Company was shortlisted and invited to progress
to Stage 2 and make a detailed application.
The detailed application was lodged on 12 October 2022.
Muchea Heritage
VRX had previously undertaken an Aboriginal Heritage survey in 2019 to clear the initial drilling
program area, with representatives of the Whadjuk People accompanying the drill crew.
Subsequent to the end of the quarter, VRX undertook a comprehensive Heritage Site
identification survey over a priority area to identify and understand Aboriginal heritage values
within the priority area to support future dialogue with Whadjuk people about the proposed
mining project.
This 4-day survey was completed in late October and included foot traverses over the 400 Ha
area. An Ethnographic survey will follow in early November. The results of the Survey are
expected in the December quarter.
Figure 6: Muchea clearance survey area
ASX Listing Rule 5.3 disclosures
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $72K related mainly to
tenement applications and rents. Payments for exploration & evaluation under investing
activities of $1,370K consists mainly of water bore drilling, pads and hydrogeological studies,
processing plant engineering design and related metallurgical test work. There were no
substantive mining production and development activities during the quarter.
Details of tenement activities:
During the quarter, the following tenements were granted:
General Purpose Leases G70/264, G70/265 & G70/266
During the quarter, the following tenements were applied for:
Mining Lease M70/1418
Details of related party payments:
The aggregate amount of payments to related parties and their associates at line 6.1 of the
attached Appendix 5B of $139K represents directors’ fees and salaries paid during the quarter.
Combined +1.1Bn tonne Mineral Resource
Project
Classification
Indicated
Inferred
Total
Indicated
Arrowsmith
Inferred
North
Total
Indicated
Arrowsmith
Inferred
Central
Total
Inferred
Boyatup*
Total
Total Mineral Resource
Muchea
Mt
29
172
208
248
523
771
28.2
48.3
76.5
60
60
1,116
Al₂O₃
%
99.6
0.09
99.6
0.05
99.6
0.06
97.7
1.00
98.2
0.80
98.0
0.86
96.6
1.70
96.9
1.50
96.8
1.50
97.8
0.83
97.8
0.83
Million Tonnes**
SiO₂ %
Fe₂O₃ %
TiO₂ %
LOI %
0.03
0.02
0.02
0.40
0.30
0.30
0.40
0.40
0.40
0.23
0.23
0.07
0.10
0.10
0.20
0.20
0.17
0.20
0.20
0.20
0.13
0.13
0.22
0.23
0.23
0.50
0.40
0.41
0.70
0.70
0.70
0.88
0.88
* Boyatup Mineral Resource Estimate announced to ASX on 18 August 2022
** See material assumptions statement at end of document
Material assumptions for Reserve and Resource reporting
The information in this document that relates to the estimation and reporting of the Mineral
Resource and Ore Reserves for the Arrowsmith North, Arrowsmith Central and Muchea Silica
Sand Projects, and Boyatup Drilling is extracted from releases to ASX on 28 August 2019, 17
September 2019, 18 October 2019 and 24 March 2022, respectively. The Company confirms
that it is not aware of any new information or data that materially affects the information
included in this document and all material assumptions and technical parameters underpinning
the estimates continue to apply and have not materially changed.
This quarterly report has been approved for release by the Managing Director.
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica Sand
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
E70/5817
M70/1389
M70/1392
M70/1418
L70/198
L70/199
L70/202
L70/203
L70/208
L70/230
L70/229
G70/264
G70/265
G70/266
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Granted
Granted
Granted
Granted
Granted
Granted
Application
Granted
Granted
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
Muchea Project – Silica Sand
Tenement
Status
E70/4886
E70/5157
E70/5548
E70/5651
M70/1390
M70/1414
L70/200
L70/204
L70/205
L70/206
Granted
Granted
Granted
Application
Granted
Application
Granted
Granted
Application
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
Boyatup Project – Silica Sand
Tenement
Status
E69/3560
E69/3668
Granted
Granted
Interest at
beginning of
quarter
100%
100%
About VRX Silica
VRX Silica Ltd (ASX: VRX) is developing world-class, high-grade silica sand projects in Western Australia.
The Arrowsmith North and Arrowsmith Central Silica Sand Projects, 270km north of Perth, comprise five granted
exploration licences and two granted mining leases. Bankable feasibility studies for both projects have demonstrated
exceptional financial metrics.
The Muchea Silica Sand Project, 50km north of Perth, comprises two granted and one under-application exploration
licences as well as one granted mining lease. Muchea is a world-class project with high-purity silica sand in situ. A
bankable feasibility study has demonstrated outstanding financial metrics.
The Boyatup Silica Sand Project, 100km east of Esperance, comprises two adjacent granted exploration licences.
Initial indications are that this project can complement the Arrowsmith and Muchea projects and add to the range of
silica products VRX Silica may be capable of producing.
Proven Management
VRX Silica’s Board and Leadership Team have extensive experience in mineral exploration and mine developmentto-production and in the management of publicly listed mining and exploration companies.
Silica Sand Projects Locations
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VRX SILICA LTD
Quarter ended (“current quarter”)
ABN
59 142 014 873
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 September 2022
Year to date
(3 months)
$A’000
Current quarter
$A’000
-
-
(72)
(72)
(b) development
-
-
(c) production
-
-
(d) staff costs
(236)
(236)
(e) administration and corporate costs
(525)
(525)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
7
7
1.5
Interest and other costs of finance paid (on
lease liability)
(2)
(2)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
198
198
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(630)
(630)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(156)
(156)
(1,370)
(1,370)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Year to date
(3 months)
$A’000
Current quarter
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (bonds deposit)
(89)
(89)
2.6
Net cash from / (used in) investing
activities
(1,615)
(1,615)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liability)
(17)
(17)
3.10
Net cash from / (used in) financing
activities
(17)
(17)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
9,306
9,306
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(630)
(630)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,615)
(1,615)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(17)
(17)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Year to date
(3 months)
$A’000
Current quarter
$A’000
-
-
7,044
7,044
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,021
4,289
5.2
Call deposits
5,023
5,017
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,044
9,306
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
139
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(
Share your feedback
Discover