Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
December 2023 Quarterly Activity Report
The following is a summary of the activities conducted by VRX Silica Limited (VRX or
Company) during the December 2023 quarter at its silica sand projects at Arrowsmith (located
270 km north of Perth), Muchea (located 50 km from Perth) and Boyatup (located 100 km east
of Esperance), all situated in Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand exploration and development
company with five high-value, advanced, very long-term silica sand projects in Western
Australia, a Tier 1 mining region.
The Company has multi-decade scale contiguous sand deposits on granted Mining Leases
with secure tenure and a combined 1.4Bn tonne Mineral Resource1 of 99.6% to 99.9% SiO2
grade silica sand.
The Company and its management team is based in Western Australia, as are its five large
scale, high-grade and low impurity silica sand projects. Each project can be run independently
and supply high-grade silica sand to many diverse markets.
Figure 1: VRX Projects Locations
1 See table on page 18
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and water. It is the main
ingredient in all types of glassmaking, including specialty solar panel and high-tech glass.
The glass manufacturing industry demand is increasing at a rate of 5-6% per year, or about
8-10 million tonnes pa. Around 47% of the world’s glass is manufactured in Asia.
Silica sand is an essential component of the foundry and casting industries. The largest
foundry industry is in Korea where it dominates the industry particularly for large marine
components. Arrowsmith North can produce three grades of sought after foundry sand. Large
samples have been sent to Korean and Japanese foundry companies and foundry sand
suppliers who have confirmed that the samples meet their rigorous requirements.
Silica sand is also the main ingredient in concrete and is the largest user of available supplies
and a primary reason for depleted resources in Asia including silica sand reserves that may
be beneficiated to glassmaking and foundry quality.
Silica sand is a finite resource that is rapidly being exhausted and the Asia-Pacific region is
currently experiencing increasing demand at a time of a global supply shortfall.
Arrowsmith North
Update on Arrowsmith North Environmental Approvals Process
On 31 October 2023, VRX provided an update on its application for environmental approval at
its Arrowsmith North Silica Sand Project (Proposal) located 270km north of Perth, Western
Australia.
The Company announced on 9 June 2023 to ASX that the Environmental Review Document
(ERD) for the Proposal had been accepted by the Department of Water and Environmental
Regulation (DWER) for publication and a four-week Public Environmental Review (PER). The
PER period closed on 16 July 2023.
On 7 September 2023 DWER provided the Company with a summary of the public submissions
received during that period.
In a significant step forward, on 31 October 2023 the Company lodged its draft response to
those public submissions for consideration by the Environmental Protection Authority of
Western Australia (EPA).
To date, the EPA is still considering those responses and, subject to further consultation with
the Company, will prepare an assessment report for the Western Australian Environment
Minister in respect of the Proposal.
Environmental approval for Arrowsmith North is crucial and linked to VRX’s ability to secure
other necessary approvals for mining. This is a significant step in Arrowsmith North’s approvals
process.
VRX appreciates the interest the public has shown in the proposal and is pleased that it has
now progressed to the next stage of the environmental approvals process for Arrowsmith North.
The submissions received during the public review period were reflective of that interest.
The proposal has the potential to underpin a project lasting many decades and underscores
the enormous economic contribution that could flow to the Irwin Shire in particular and Western
Australia more broadly.
2
Background to the Proposal and Environmental Approvals Process
The Proposal includes the sequential block mining of silica sand, development of a mine feed
plant, moveable surface conveyor, pipeline, processing plant, stockpiles, freshwater supply
bore, access corridor, laydown, administration, water storage and associated infrastructure
including a gas fired power station, communications equipment, offices, a workshop and
additional laydown areas. Access to the site will be via an access road connecting the mine
to Brand Highway. A freshwater supply bore, water pipeline and access road will be located
within the Access Development Envelope (ADE). All other infrastructure will be located within
the Mine Development Envelope (MDE).
The Proposal will result in clearing and rehabilitation of up to 353.8 ha of native vegetation,
14.5 ha of which will remain cleared for the life of the Proposal, and up to 339.3 ha of native
vegetation that will be progressively rehabilitated via Vegetation Direct Transfer (VDT). The
VDT methodology can be viewed at
https://vrxsilica.com.au/miningandrehabilitationmethodology/.
This process includes salvaging and translocating intact sods comprised of soil, sub soil and
vegetation (mulched to a height) to already mined areas for planting. This approach results in
minimal disturbance to plant roots and rapid recovery of native flora.
VRX has previously received confirmation from the Commonwealth Department of Climate
Change, Energy, the Environment and Water for an accredited assessment under the
Environment Protection and Biodiversity Conservation Act 1999 (Cth) (EPBC Act). Accredited
assessment means the Commonwealth can rely on environmental assessments undertaken by
the EPA for the purpose of its approval decisions under the EPBC Act on proposals that may
have a significant impact on a matter of national environmental significance.
VRX has conducted extensive environmental studies on its silica sand projects over a number
of seasons since 2017 in anticipation of requirements of the State and Commonwealth
environmental regulation authorities to undertake approvals assessments. These surveys
commenced shortly after the tenements were acquired and the number and extent of these
surveys have expanded following further consultation with these authorities. The Company has
initially concentrated on gaining approval for development of Arrowsmith North.
The Proposal was referred to the EPA for assessment under Part IV, Section 38 of the
Environmental Protection Act 1986 (WA) (EP Act) in March 2021. The referral was reviewed
and in May 2021 the EPA determined that the Proposal would be assessed. The EPA set the
level of assessment for the Proposal at ‘Public Environmental Review’ or PER, with a
requirement for a proponent-prepared Environmental Scoping Document (ESD) and a fourweek public review period for the ERD.
The Company submitted its ESD to the EPA for assessment in September 2021. The ESD was
approved in March 2022.
In May 2022 VRX lodged with the EPA the first-draft ERD for the Proposal. The ERD was
prepared according to the EPA’s Administrative Procedures Manual and other guidance
documents and amendments. The ERD is a comprehensive summary of the Proposal’s
environmental setting, the physical elements of the proposed mine and infrastructure,
operational elements, the extent of impacts on the environment and the proposed rehabilitation
and closure plan. VRX received a request from DWER for further information in early July 2022
and submitted its response later that month.
In November 2022, DWER requested additional information. The Company lodged a revised
ERD and response table in December 2022. VRX then received a request for further
information in April 2023 and provided a final ERD to DWER in May 2023, which was accepted
by DWER on 8 June 2023 for publication and the PER.
3
The final ERD, which comprises a 341 page summary and 32 appendices detailing a
comprehensive environmental impact assessment of the Proposal, was published by the EPA
for a four-week PER period, commencing on 19 June 2023.
Following completion of the four-week PER period DWER compiled public submissions for the
Company to review and these were provided to the Company on 7 September 2023. The
Company lodged its draft response to those public submissions for consideration by the EPA
31 October 2023.
Subject to consultation and acceptance of the response to submissions, the EPA will prepare
an assessment report that will include recommendations to the Western Australian
Environment Minister on whether to approve the Proposal. If successful, the Minister will sign
off on a Ministerial Statement that will serve as approval for the Proposal.
Muchea
Drilling
In April 2023 a Program of Works (PoW) to drill on existing tracks, south of the granted mining
lease M70/1390, was approved by the Department of Energy, Mines, Industry Regulation and
Safety (or DMIRS, as it was then known). This program was planned to infill a previous hand
auger program that was completed as part of the due diligence process prior to the acquisition
of the project2. Vacuum drilling over 5 days in November 2023 completed 69 holes for 953.5
metres. Drilling was spaced typically 200m along the tracks infilling the original drilling.
Figure 2: Vacuum drilling at Muchea
2 VRX: ASX announcement of 5 April 2018, “Muchea Silica Sand Project Drill Results”
4
As expected, the drilling intercepted high quality white sand, with holes being drilled to the full
depth allowable. Assays are pending. A second stage of drilling has been approved and
following completion of drilling the Mineral Resource Estimate will be updated.
The Company referred a Proposal to undertake further exploration drilling and trials of the
Vegetation Direct Transfer rehabilitation methodology (VDT Trials) within M70/1390 to support
the future development of Muchea to the Federal Department of Climate Change, Energy, the
Environment and Water (DCCEEW) for an assessment under the EPBC Act. The Department
determined that the proposal is not a controlled action and that the works may be carried out
under certain conditions.
The Company plans to undertake the drilling and VDT trials in the second quarter 2024.
Dandaragan Geothermal Project
Farm-in and JV Agreement
On 3 November 2023 VRX announced it had entered into a Farm-In and Joint Venture
Agreement (Agreement) with Hydro X Gen Pty Ltd (HXG) for the Company’s granted
Geothermal Exploration Permit 44 (GEP 44) at Dandaragan, 145km north of Perth, Western
Australia. Further information on GEP 44 is set out below.
HXG is planning to conduct an initial public offering and list on the ASX as Steam Resources
Limited (www.steamresources.com.au) in 2024 (Steam).
Geothermal technology has the potential to produce long term dispatchable renewable energy
for the Mid-West region, including VRX’s Arrowsmith silica sand projects.
The grant of GEP 44 to VRX was announced to ASX on 28 July 2023. It consists of 8
contiguous blocks and the area includes the Walyering gas field currently under development
by the EP447 Joint Venture between Strike Energy (55%) and Talon Energy (45%). The project
provides an opportunity to work with these gas companies and use extensive historical and
current data to explore potential geothermal power options.
Under the terms of the Agreement, Steam can earn up to a 90% interest in GEP 44. Steam is
required to complete an agreed exploration program and drilling campaign by 31 July 2026 to
earn an initial 40% interest in the project and an additional 30% interest by completing a
feasibility study assessing the economic viability of the production of energy from geothermal
sources within the project area by that date. Steam may earn an additional 20% interest upon
the production of energy from geothermal sources within the project area by 31 July 2029. VRX
is not required to contribute funding for geothermal development of the project.
Steam has the requisite experience and expertise to explore and develop the project and is of
the view that GEP 44 represents a unique development opportunity for geothermal energy
production in Western Australia that will complement their other project areas in the Northern
Territory and South Australia.
This geothermal exploration initiative was undertaken by VRX to support our silica sand projects
and long-term ambitions for the production of glass in Western Australia. Geothermal energy
is a reliable, long-term renewable energy source and an opportunity for a new renewable
energy industry in the Mid West.
VRX will retain the rights to any minerals that may be encountered in the development of the
geothermal project.
Effective 15 December 2023, GEP 44 was transferred by VRX to a 100% owned subsidiary
VRX Geothermal Pty Ltd, and the Agreement has, accordingly, been novated to that entity.
5
GEP 44
In December 2021 VRX lodged an Acreage Release nomination with DMIRS for specified areas
in the Mid-West to be included in a geothermal acreage release. In January 2022 DMIRS
released 21 areas in Western Australia for applications for GEPs with a closing date for
applications of 21 April 2022. GEPs are administered by the Department of Energy, Mines,
Industry Regulation and Safety (DEMIRS) (as it is now known) under the Petroleum and
Geothermal Energy Resources Act 1967 (PGERA) with areas released as a Discrete Area
Release. Successful applications are determined through a competitive bidding system. VRX
has made application for three GEPs, granted GEP 44, and has been notified the other two
permits are progressing through a section 69A PGERA consultation phase. There is no timeline
for this process. The GEP 44 has been denoted as the Dandaragan Geothermal Project, Figure
3 and Table 1 show its location and details.
GEP
Holders
Grant Date
Term
5l Blocks
44
VRX Geothermal Pty Ltd
27 July 2023
6 years
8
Table 1: VRX Geothermal Exploration Permits
Figure 3: Dandaragan Geothermal Exploration Permit Location
6
Geothermal Exploration Concept
A geothermal energy source is an accumulation of extractable heat deep in the Earth’s
subsurface. Heat (thermal energy) is directly proportional to temperature, and water (either
liquid or vapor) is almost always the medium by which geothermal energy is brought to the
Earth’s surface via boreholes. For geothermal energy to be extractable, water must be able to
flow through hot rock from an injection well to a production well.
For ‘hot sedimentary aquifers’ (the principal target in the North Perth Basin), it is important to
target the maximum temperature, volume and transmissivity of the reservoir rocks. The goal of
a geothermal exploration program is to progressively build confidence in predictions of
temperature, reservoir properties, and geometry (depth, extent, thickness) of target geothermal
reservoirs, culminating in the drilling of one or two appraisal wells. Semi-independent work
streams can investigate the three elements (temperature, reservoir properties, geometry) in
parallel, with results integrated into one or more ‘conceptual models’ of the geothermal
system(s).
GEP 44 is in an area of petroleum gas production development, providing an opportunity to
work with the current gas companies to use extensive historical and current data to explore for
potential geothermal power options. Not all petroleum well data will be ideal for the exploration
of geothermal energy, however it will provide a good basis and guide on where to create new
information.
Figure 4 shows a typical project cost and risk profile during the development of a geothermal
energy project. The graph shows that the risks are high in the early stages of exploration but
reduce significantly once the reservoir has been drilled and verified. The costs associated with
the activities are inversely proportional to the risk and only increase significantly after the risk
is reduced.
Figure 4: Project costs and risk profile through the development of a geothermal resources 3
3 ARENA 2014 Report – “Looking Forward: Barriers, Risks and Rewards of the Australian Geothermal Sector
2020 and 2030”
7
Geothermal Exploration Program
The exploration program is expected to begin with the compilation and quality assurance of all
relevant historical exploration and geoscientific data/information about the geothermal potential
of the bid area. This will establish the baseline from which to carry out targeted exploration
activities.
Existing data sets will be reprocessed and/or reinterpreted to focus on characterising 3D
geometry and geothermal reservoir potential, with the initial assessment identifying key
information gaps that can be addressed by the collection of new data. New data collection will
take the form of geophysical surveys; surface, airborne, and/or borehole. All data will be
compiled into a 3D geological model forming the basis for predictions of temperature and
reservoir properties, which will be continually updated as new information becomes available.
An appraisal well will ultimately be drilled to test the most attractive target reservoir once nearsurface exploration activities are no longer cost effective for reducing uncertainty in predictions
of temperature, reservoir properties, and geometry. If results are promising, a production and
injection doublet will be drilled to create a circulation loop to demonstrate heat recovery and
power conversion.
What is Geothermal Energy?
Geothermal energy is a clean, virtually emissions-free, renewable energy resource produced
from underground reservoirs of water naturally heated by Earth’s internal heat. Steam and brine
produced from these underground reservoirs can be used to turn turbines to produce electricity
either directly or using “organic rankine cycle binary plants”, see Figure 5.
Figure 5: Typical Binary cycle geothermal power plant
8
Why Geothermal?
The Australian Renewable Energy Agency (ARENA) produced a report4 in 2014 to assess the
barriers and opportunities for geothermal energy development in Australia. The report found
that Australia does have a large geothermal potential to generate direct heat or electricity. It
identified the strength of geothermal power generation to be a source of dispatchable power
with a low environmental footprint. The report also states “Geothermal-sourced electricity is
among the cheapest in the United States … and plays an important role in the dispatch of power
to meet renewable portfolio standards. This is primarily because of its ability to provide baseload renewable generation to backstop variable renewable sources, such as wind and solar.”
A subsequent ARENA report in 20185 looked at comparing the cost of dispatchable renewable
electricity options. This report identified, on a levelised basis, geothermal electricity generation
as a cost effective solution for base load, 24 hour dispatchable power which easily competes
with, or beats, all other renewable alternatives which are non-dispatchable, such as wind and
solar PV.
The prospect to produce a renewable energy source in the Mid West is an opportunity to add
to the growing reputation that the Mid West will become the central hub for renewable energy
and downstream use in Western Australia.
There is a long term prospect to use renewable energy to produce hydrogen to use in “green”
glass manufacturing. Technically it has been well established that hydrogen can be used as
the energy source for heating required to produce glass.
Table 2: Estimated US average levelised costs (2011$/MWhr) for plants entering service in 2018, from US-EIA
(2013)
4 ARENA 2014 Report – “Looking Forward: Barriers, Risks and Rewards of the Australian Geothermal Sector
2020 and 2030”
5 ARENA 2018 Report – “Comparison of Dispatchable Renewable Electricity Options – Technologies for an
orderly transition”
9
Dispatchable v Non-Dispatchable Energy
Geothermal power provides a stable and constant source of energy. Unlike solar and wind
power, which are intermittent and dependent on weather conditions, geothermal power plants
operate consistently. They deliver electricity 24/7, regardless of the weather or time of day,
providing a reliable and consistent energy supply.
Energy generation can be split into two different groups:
•
Dispatchable – being energy sources which can be turned on and off within a short
period of time, and the amount of energy they produce can also be turned up or down so
that supply of electricity matches the amount demanded by users.
•
Non-dispatchable – Renewable energy sources which are intermittent, the energy they
produce varies from moment to moment, from day to day, and even from season to
season. Supply is available when supply is available and if the demand is not there, then
the energy can be wasted.
Geothermal is considered dispatchable as it is easily programmed on demand to produce
steady reliable energy.
Capacity Factor
The Capacity Factor of a generating unit is the ratio of the electrical energy produced by the
unit for the period of time to the electrical energy that could have been produced at continuous
full power operation during the same period. Geothermal generation typically operates at a very
high Capacity Factor, several times higher than intermittent renewable generators and higher
even than conventional coal and gas generators.
Using the data in Table 2, above, Geothermal power plants have an average capacity factor of
92%, meaning that geothermal generators can be expected to reliably produce power for 92%
of the time. Geothermal energy is more consistently delivered than both coal and gas
generation, and is significantly more reliable than intermittent renewable generation, 170%
more than Wind and 270% more than solar PV’s. The Capacity Factor is a major factor in the
Levelised Cost of Energy, by which measure Geothermal energy is one of the cheapest sources
of energy, let alone renewable energy.
Levelised Cost of Energy
The Levelised Cost of Energy (LCOE) is expressed in $/MWh and is defined as the timediscounted cost to generate energy over the expected lifetime of the generator, divided by the
amount of energy generated over the lifetime of the generator, and can be expressed as a
formula;
It : investment expenditures in the year t
Mt : operations and maintenance expenditures in the year t
Et : electrical energy generated in the year t
r : discount rate
n : expected lifetime of system or power station
10
The key factor in favour of Geothermal energy is its very high capacity factor. A geothermal
generator will produce on average 270% more electricity over a year than a solar PV plant of
the same installed capacity. The graph in Figure 6 below, from ARENA6 shows that Hot
Sedimentary Aquifer (HSA) Geothermal energy is amongst the lowest LCOE of any renewable
energy option for 24-hour supply, lower in fact than stand-alone non-dispatchable wind and
Utility PVs.
Figure 6: Levelised Cost of Energy for 24 hours duration delivery for systems at 100Mwe nominal capacity
evaluated with a 6.5% weighted average cost of capital.
Environmental Impact
Geothermal power plants can be designed to “blend-in” to their surroundings, more so than
many other types of electricity-producing facilities. Geothermal power has a very small footprint
compared to other renewable energy sources and does not require significant alterations to the
landscape. Figure 7, below, shows the land area required to generate 1GWh of energy7.
6 ARENA 2018 Report – “Comparison of Dispatchable Renewable Electricity Options – Technologies for an
orderly transition”
7 A Guide to Geothermal Energy and the Environment - Alyssa Kagel, Diana Bates, & Karl Gawell, Geothermal
Energy Association, April 2007.
11
Figure 7: Land area required to generate 1GWh of energy.
Geothermal development poses only minimal impact to wildlife and vegetation in the
surrounding area. Unlike solar PV, there is no ground shading, and geothermal avoids the risk
to bird life posed by large scale wind farms.
Australian Industry Geothermal Projects
Geothermal energy projects in Australia have been largely confined to smaller scale localised
heating projects such as hotel, aged care facilities, public swimming pools, aquaculture, space
heating and spa resorts. Recently, however, there is a resurgence of interest in power
generation. There are three ASX listed companies pursuing geothermal power generation as
an energy source for an ultimate downstream processing goal. These are Vulcan Energy
(Vulcan) (ASX:VUL), Controlled Thermal Resource (CTR) (not listed on ASX) and Strike
Energy (Strike), (ASX:STX). Vulcan and CTR are both planning to produce geothermal power
and recover lithium from hot brines in a carbon neutral process. The Vulcan project is in the
Upper Rhine Valley in Bavaria and the CTR project is in the Salton Sea geothermal field in
California, USA.
The Strike project is most relevant geographically and technically to this proposed VRX
Geothermal Project. Strike is an ASX listed energy company with an approx. $1bn market
capitalisation, that has onshore gas reserves in the Perth Basin. Strike is currently developing
a production facility at Walyering in 2023, followed by gas production at South and West
Erregulla in 2024 and 2025. In addition to its gas assets Strike is investigating the potential
production of Urea via the Project Haber site west of VRX’s Arrowsmith North silica sand
projects. Project Haber envisages using gas from the Erregulla gas field, potentially with
geothermal energy to produce low carbon urea for the domestic and export market.
12
On 17 May 2021 Strike announced the completion of the acquisition of Mid West Geothermal
Power Pty Ltd8, giving access to explore an area of ~4,000km2 in the Dongara region for
potential geothermal energy. In April 2022 Strike announced it had received a $2 million grant
from the WA Government - Clean Energy Future Fund9 to support the preparation and
execution of a drill test hole. On 5 May 2022 Strike then announced an Inferred Resource for
the Mid-West Geothermal Power Project10, Table 3, below, summarises the Inferred Resource.
Kingia Sandstones (30-year model)
P90
(low)
Mapped Area (km²)
P50
(mid)
P10
(high)
1,826
GEP
Application Area
Net Energy Resource (PJe)
69
203
422
Equivalent Power Resource (MWe)
77
226
470
Table 3: STX – Geothermal Inferred Resource Statement
Strike’s inferred resource assessment predicts that if a hot sedimentary aquifer (brine) reservoir
is verified there is a 50% likelihood it could support a commercial scale geothermal generating
capacity of 226MW total generating capacity over a 30-year period. To put this potential in
perspective against other renewable energy generation, an equivalent solar PV array would
need to have 270% greater installed capacity to account for the difference in capacity factor.
This would need the solar array to have an 840MW installed capacity, which would have a
footprint of 590Ha compared to a 74Ha geothermal plant. The solar array would only produce
power 25% of the time compared to 92% for the geothermal plant.
It should be noted that Vulcan and CTR are both looking at extracting significant value from the
minerals contained within the hot sedimentary hosted brine. In both cases the final product is
lithium, a high value battery mineral. VRX will assess the potential for secondary revenue
streams from brine minerals, but Strike has not reported any such potential in its own fields to
date.
Uses for Renewable Geothermal Energy
Baseload grid power
As shown on Figure 3, GEP 44 is traversed by 330KV and 132KV transmission lines
that are connected to the South West Interconnected System (SWIS) and an associated
substation. The presence of this infrastructure could allow for any excess electricity
generated to be fed into the SWIS as base load grid power. In addition to this the
immediate area has 2 long life mineral sands mines, Iluka Resources Cataby Mine and
Tronox Inc. Cooljarloo Mine, both of which consume significant power.
Hydrogen injection in Gas Pipelines
The WA Government as part of its decarbonizing strategy has successfully completed
studies confirming the technical feasibility of transmitting hydrogen via the existing gas
8 STX: ASX announcement of 17 May 2021, “Geothermal acquisition progresses to completion”
9 STX: ASX announcement of 8 April 2022, “Strike Awarded Clean Energy Future Fund Grant”
10 STX: ASX announcement of 5 May 2022, “Mid-West Geothermal Power Project Inferred Resource”
13
pipelines by either blending11 with natural gas or 100% hydrogen12. GEP44 has both the
Parmelia and Dampier to Bunbury pipelines running through, or proximal to them, Figure
3.
Green Hydrogen
A potential use of the energy that could be generated from a Geothermal Plant is the
production of green hydrogen. In March 2022 VRX announced13 an MOU with Xodus
Group for potential supply to a glass manufacturing facility powered by hydrogen
producing ultra-clear glass for solar panels from the high-grade silica sand produced
from VRX’s Muchea silica sand project. The MOU covered a possible future offtake of
9,000 tonnes to 11,000 tonnes of hydrogen per annum. If a geothermal resource is
delineated leading to development of a commercial scale power generator, all or some
of the power generated could be used to produce green hydrogen by the electrolysis of
water. Recently Hysata, in Wollongong NSW, achieved a record-breaking reduction in
the energy required to produce hydrogen by 20% to 41.4kWh/kg14. To put this potential
in scale, a 100MW installed geothermal generator could potentially produce 20,000t of
hydrogen per annum. Any green hydrogen produced could potentially be injected into
the Gas Pipeline that runs through the Permit or potentially supplied to hydrogen
vehicles travelling along the Brand Hig