Binding Offtake Contracts Secured for Arrowsmith North
Released
Released
Announcement PDF
ASX Announcement
23 October 2025
Binding Offtake Contracts Secured
for Arrowsmith North
Highlights:
Four binding offtake contracts signed with
customers in in South Korea, Taiwan and the
Philippines
Offtake customers are well-established, reputable
and substantial suppliers into the foundry,
glassmaking and filter industries
Aggregate 410,000tpa committed, close to half of
Arrowsmith North’s start-up capacity, with further
binding offtake contracts pending
VRX Silica Limited (ASX: VRX) (VRX or Company) is pleased
to announce that it has secured four binding offtake contracts
for the supply of silica sand from its Arrowsmith North Silica
Sand Project (Arrowsmith North).
The offtake contracts are for the supply of an aggregate
minimum of 410,000 tonnes per annum of high-quality silica
sand products to two well-established, reputable and substantial
suppliers into the foundry industries in South Korea, a leading
supplier of foundry, glassmaking, water filter media and sized
dry sand in Taiwan, and a glass manufacturer supplier in the
Philippines.
This follows announcements in August and September that the
Company has received environmental, works and mining
proposal approvals for Arrowsmith North allowing for the
development of Arrowsmith North, in particular the
commencement of construction and operation of the processing
plant and associated infrastructure as well as mining activity1
.
Arrowsmith North, 270km north of Perth, contains a globally
significant deposit of high-quality silica sand underpinning a
mining project that will enable long term production for the
foundry, container glass and flat-glass markets in Asia. As
detailed in the updated bankable feasibility study announced in
March 2024, Arrowsmith North has a JORC-compliant Proved
and Probable Ore Reserve of 221Mt @ 99.5% SiO2.2
1
ASX announcement “DMPE Approves Mining Proposal for Arrowsmith North Silica Sand Project” dated 8 August 2025; ASX
announcement “Environmental Approval for Arrowsmith North Silica Sand Project” dated 2 September 2025; and ASX
announcement “Works Approval for Arrowsmith North Silica Sand Project” dated 5 September 2025.
2 See the updated bankable feasibility study released to ASX in 2024 (ASX announcement “Arrowsmith North Updated BFS”
dated 6 March 2024)
ASX: VRX
Capital Structure
Shares on Issue:
749.9 million
Unlisted Options:
31.7 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
Geothermal Energy
Dandaragan Geothermal
Energy Permit, 145km
north of Perth, WA
The Company is actively
assessing other silica sand
and downstream
processing projects in
Australia.
2
VRX proposes to gradually ramp up production at Arrowsmith North from a starting level of
approx. 1Mtpa to more than 2Mtpa of silica sand, with an operating life of several decades.
These binding offtake deals in aggregate account for close to half of Arrowsmith North’s
proposed commencement capacity.
VRX’s strategic significance is its position as a near-term, long-life and stable supplier of high-
quality silica sand products from a Tier 1 jurisdiction.
VRX’s marketing strategy is to secure a portfolio of long-term offtake contracts with reputable
partners to underpin a steady ramp-up of production while balancing price exposure and
revenue stability amid the continuing strong inbound interest from a number of market
participants across the Asia-Pacific region.
Extensive testing by potential buyers of samples of silica sand foundry products from
Arrowsmith North confirmed that these would be sought-after products. The key features for
preferred foundry sand are particle size distribution, grain shape and size and thermal stability,
which all are attributes of Arrowsmith North silica sand to demonstrate its superior quality and
ability to meet the highest stringent specifications.
The contracted customers are decades long-established, leading suppliers into the automobile
foundry industry and glassmaking industries in their respective countries and throughout Asia.
The Company is in discussions with several other prospective customers and negotiating
additional binding offtake contracts, with announcements in that regard expected to be made
later this quarter.
VRX Managing Director Bruce Maluish said: “We are delighted with the support from our
offtake partners as we secure initial binding offtakes for Arrowsmith North. VRX is seen as a
reliable supplier of high-grade silica sand products and Australia as a dependable jurisdiction.
“These contracts further vindicate VRX’s strategy to ensure production of a unique Australian
highly sought-after product and secure the right customers for our silica sand products for what
we expect to be long-term relationships.
“We remain focused on converting the remaining offtake term sheets and new interest into
binding offtake agreements. With key project approvals in place, our marketing team is actively
engaging with interested parties involved in the foundry sand and glass-making industries and
responding to a number of new enquiries as our high-quality silica sand products and surety of
supply become recognised in the marketplace.”
VRX is targeting first production in late 2026 following a final investment decision and
commencement of construction of the processing plant and associated infrastructure expected
in the first half of 2026.
VRX has mandated Argonaut to act as the Company’s financial advisor in connection with
potential debt financing for Arrowsmith North. An independent technical review of the project
has been completed. Interest from potential debt financiers has increased markedly following
the granting of key approvals, with a shortlist of debt finance proposals to be evaluated in the
coming weeks.
3
These foundation offtake contracts are all for four-year terms, with pricing fixed for the first two
years within the range of the Company’s financial modelling for Arrowsmith North3
. They
provide certainty to VRX with regards to sales and revenue generation, an important
precondition for potential debt financiers.
The contracts set out detailed terms and conditions for the supply by Ventnor Mining Pty Ltd,
a 100% owned subsidiary of VRX and owner of the Arrowsmith North mining tenements, of a
minimum tonnage of silica sand products according to pre-determined technical specifications,
shipped FOB from the Port of Geraldton. They are on terms and conditions that are customary
for agreements of this nature and are in line with industry standard documentation including
provisions around contract performance, delivery of product, quality control, weighing and
sampling, shipping and laycan, force majeure, termination rights and the application of
Incoterms® 2020 rules.
Each contract is subject to customary conditions precedent relating to commencement of the
project, including the Company finalising project finance, receiving all remaining permits for
the project, finalising logistics contracts for transport and port access and usage,
commissioning of Arrowsmith North and its related infrastructure to achieve commercial
production, and delivery of an initial trial shipment. The conditions must be satisfied by
31 December 2026 with a right for the Company to extend this date by up to four months.
VRX considers that disclosing the specific identities of the counterparties to the offtake
contracts is not information a reasonable person would expect to have a material effect on the
price or value of its securities, given the counterparties’ standing and creditworthiness. VRX
confirms that this announcement includes all material information relevant to assessing the
impact of these offtake agreements on the price or value of the Company’s securities and is
not misleading by omission.
This announcement has been authorised for release to ASX by VRX Managing Director, Bruce
Maluish.
Further information:
Bruce Maluish Peter Klinger
Managing Director Purple
brucem@vrxsilica.com.au pklinger@purple.au
3 See the updated bankable feasibility study released to ASX in 2024 (ASX announcement “Arrowsmith North Updated BFS”
dated 6 March 2024)
4
About VRX’s target silica sand markets
Foundry
Silica sand is an essential part of both the ferrous and non-ferrous foundry industries. Metal
parts ranging from engine blocks to sink faucets are cast in a sand-and-clay mould to produce
their external shape, often using a resin coat to create the desired internal shape. Silica’s high
fusion point (1,760°C) and low rate of thermal expansion produce stable cores and moulds
compatible with all pouring temperatures. Its chemical purity also helps prevent interaction
with catalysts or affecting the curing rate of chemical binders, for that reason, customers are
looking for high quality silica sand that meets their specifications for size and shape.
Another critical specification is the hardness of silica grains to deliver the required crush
resistance to high pressure from molten metals.
Arrowsmith North is capable of producing multiple high quality sand products for the foundry
industry as confirmed by potential offtake partners in Asia following extensive testwork.
Glassmaking
Silica sand is the primary component of all types of standard and specialty glass. It provides
the essential SiO2 component of glass formulation and its chemical purity is the primary
determinant of colour, clarity and strength in glass. Silica sand is used to produce flat glass
for building and automotive use, container glass for foods and beverages, and tableware. In
its pulverised form, ground silica is required in the production of fibreglass insulation and for
reinforcing glass fibres. Specialty glass applications include test tubes and other scientific
tools, incandescent and fluorescent lamps, television and computer LCD/LED monitors.
Glassmaking physical specifications focus on particle size, as it significantly impacts melting
efficiency. Uniform grain size is preferred to reduce energy use and ensure complete melting.
In fibreglass production, over 99.5% of raw material grains are smaller than 0.045 mm (45μm),
and tighter limits are being considered. Coarse particles are hardest to melt and can cause
defects. Grain shape also matters—if too many grains are coarser than specified, incomplete
melting and poor product quality can result.
Refractory heavy minerals (RHM)—such as iron, zircon, corundum, chrome spinels, rutile,
and staurolite—should generally be avoided in glassmaking because they do not melt at
standard glass-making temperatures. This leads to solid inclusions or defects ("stones") in
the final glass. Limits on RHM are typically based on their size and amount, with particles
larger than 0.25 mm (10 mesh) being the most problematic. These may be restricted by
weight percentage or particle count.
5
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most advanced pureplay silica sand company listed
on the ASX, developing its 100% owned silica sand projects at Arrowsmith (North, Brand
and Central), Muchea and Boyatup in Western Australia.
Silica sand is the most used commodity on the planet after air and water. It is the main
ingredient in foundry casting and in all types of glassmaking, including specialty solar panel
and high-tech glass. It is a finite resource that is running out, with the Asia-Pacific region
experiencing an ever-growing supply shortfall that will drive up prices in the long term.
VRX has significant Resources to underpin very long-life silica sand projects.
Arrowsmith is located 270km
north of Perth. Arrowsmith
North boasts a minimum 25-
year mine life capable of
producing more than 2Mt
tonnes per year of high-grade
(99.7% SiO2)* silica sand for
export to the foundry, container
glass and flat glass markets in
Asia, with permitting well
advanced, and will lead
production.
Muchea, located 50km north of
Perth, is an ultra-high-grade
(99.9% SiO2)* silica sand
project capable of producing
sand required for ultra-clear
glass for solar panels and other
high-tech glass applications.
Boyatup, located 100km east of
Esperance, is under
development and capable of
producing sand for the glass
market.
*Information relating to grades are extracted from releases to ASX on 28 August 2019 and 11 November 2022
(Arrowsmith North) and 18 October 2019 (Muchea). The company is not aware of any new information or data that
materially affects this information.
6
Appendix
Arrowsmith North Ore Reserves and Grades
Project Classification Product Mt
SiO2
%
Al2O3
%
Fe2O3
%
TiO2
%
LOI
%
Arrowsmith
North
Proved
AFS20 0.8 99.5 0.25 0.07 0.05 0.1
AFS35 3.9 99.5 0.5 0.06 0.05 0.1
AFS55 2.7 99.2 0.5 0.1 0.05 0.1
Local 1.8
Proved Ore Reserve 9.2 Million Tonnes
Probable
AFS20 24.2 99.5 0.25 0.07 0.05 0.1
AFS35 102.5 99.5 0.5 0.06 0.05 0.1
AFS55 51.1 99.2 0.5 0.1 0.05 0.1
Local 34.1
Probable Ore Reserve 212 Million Tonnes
Total Ore Reserves 221 Million Tonnes
Compliance Statement – Ore Reserves and Grades
The information in this document that relates to the estimation and reporting of the Ore
Reserves for the Arrowsmith North silica sand project is extracted from releases to ASX on 28
August 2019, 11 November 2022 and 6 March 2024. The Company confirms that it is not
aware of any new information or data that materially affects the information included in this
document and all material assumptions and technical parameters underpinning the estimates
in those releases continue to apply and have not materially changed.
Compliance Statement – Production Target
The information in this document that relates to the Company’s production target for the
Arrowsmith North silica sand project is extracted from releases to ASX on 6 March 2024. The
Company confirms that it is not aware of any new information or data that materially affects the
information included in this document and all material assumptions underpinning the
production target continue to apply and have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the relevant original market
announcements.
Share your feedback
Discover