Quarterly Activities Report
Released
Released
Announcement PDF
During the March 2016 Quarter, Ventnor Resources Limited (ASX: VRX) (Ventnor or the
Company) conducted the following activities:
EXPLORATION
Thaduna/Green Dragon JV – Copper
On 21 January Ventnor and its JV partner, Sandfire announced the results from the diamond
drill program completed in the previous quarter. The program was aimed at resource
definition at the Thaduna/Green Dragon Copper Project. The drill program at Thaduna
comprised six diamond drill holes and two preliminary RC pre-collars with best results of:
TDDD010 11.0 metres @ 4.7% Cu and 19.3 g/t Ag
TDDD013
6.3 metres @ 6.0% Cu and 28.2 g/t Ag
o
o
The drill program comprised six holes drilled at dips of 60 – 63 , and to a depth of up to
462m downhole. The drill program targeted the Thaduna Fault mineralisation and was
designed as an initial step towards the resource definition of the middle portion of
mineralisation. Each drill hole was designed to improve geological certainty over the areas of
known mineralisation, and to extend mineralisation where possible.
The program had been planned and selected to target gaps in drill coverage over the main
ore body, between known mineralisation intercepts and all holes have intersected the target
zone with results below.
Hole Assays
Hole ID
Interval
From (m)
To (m)
TDDD010
1
2
1
2
3
4
1
2
3
1
2
1
2
1
2
245.0
272.0
223.9
245.0
297.6
352.3
279.0
288.0
383.0
355.7
381.0
247.0
255.8
225.2
321.2
247.0
283.0
224.2
245.9
299.0
353.9
280.0
289.0
386.0
357.0
387.3
251.0
257.0
225.7
323.3
TDDD011
TDDD012
TDDD013
TDDD014
TDDD015
Downhole
Width (m)
2.0
11.0
0.3
0.9
1.4
1.6
1.0
1.0
3.0
1.3
6.3
4.0
1.2
0.6
2.1
Est. True
Width (m)
1.4
7.5
0.2
0.6
0.9
1.0
0.9
0.9
2.3
0.9
4.4
2.8
0.8
0.4
1.6
Intersection
Cu (%)
Ag (g/t)
1.1
3.0
4.7
19.3
1.0
2.4
4.1
1.8
2.1
0.3
7.8
38.5
2.2
0.3
4.9
1.1
2.5
9.9
2.2
5.1
6.0
28.2
3.6
9.2
1.2
3.0
1.2
0.3
3.3
7.1
These diamond holes had intersected the main orebody at Thaduna with results that met
expectations and confirmed the predictability and consistency that was indicated by the
previous Resource drilling.
Hole Locations
Hole ID
TDDD009
TDDD010
TDDD011
TDDD012
TDDD013
TDDD013A
TDDD014
TDDD015
Depth
66.0
314.3
371.9
462.4
438.3
96.0
300.7
399.6
Dip
-63.0
-61.0
-62.0
-63.0
-63.0
-60.0
-61.0
-61.0
Azimuth
53.4
52.1
60.0
52.0
52.8
51.0
55.0
55.0
Grid ID
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
East
772519
772688
772597
772566
772527
772527
772544
772456
North
7176211
7175878
7175944
7175982
7176029
7176029
7176115
7176146
RL
561.2
560.6
561.8
560.3
560.4
560.5
560.9
560.5
Hole Status
RC Precollar
Complete
Complete
Complete
Complete
RC Precollar
Complete
Complete
During the Quarter, Sandfire completed a review of the distribution of mineralisation at the
Thaduna deposit, including the diamond drill holes (above) completed in the last Quarter.
Work is continuing to define structural controls for the higher grade mineralisation
encountered within the deposit.
Detailed Information
The Thaduna Project is located 40km east of DeGrussa and represents the largest copper
resource in the Doolgunna-Bryah Basin Region outside of Sandfire’s DeGrussa-Doolgunna
Project (7.9Mt @ 1.8% Cu for 142,000 tonnes of contained copper). Sandfire currently owns
a 35% interest in the project, and has entered into a farm-in agreement to earn up to a
further 45% (total of 80%) with Ventnor Resources (ASX: VRX).
The long section image is from the Ventnor defined Resource with some of the significant
intercepts.
At the time of commencement of the Joint Venture with Sandfire Resources, Ventnor had
completed 221 RC holes for 29,041 metres with 79 Diamond Tails for 20,485 metres,
totaling 49,526 metres at the Thaduna Project.
Summary of the Ventnor Resources Ltd/Sandfire Resources NL JV details
On 4 December 2013 Ventnor entered a JV agreement with Sandfire Resources NL (Sandfire) on
the historic Thaduna/Green Dragon copper project located 170km north of Meekatharra in Western
Australia. At that date Sandfire acquired a 35% interest in the project and management of the JV.
Sandfire currently has an exploration spend obligation on the tenements in order to satisfy the
second tranche requirements to move to a 51% interest in the JV.
This JV transaction represents substantial value accretion for Ventnor shareholders by:
Reducing the previous project capital cost estimate of $70M included in the Scoping
Study (completed February 2013) to only the establishment costs.
Sandfire providing all JV funding through to production from contributions and
interest-free loans;
Ventnor not incurring additional financing costs to develop the project;
Minimising on-going equity dilution for current shareholders; and
Lower processing costs at Sandfire’s DeGrussa plant because of its higher
throughput rate compared to that contemplated in the Ventnor Scoping Study.
Black Dragon Gold Project
Black Dragon is located 370 kilometres north-east of Kalgoorlie and 22 kilometres north-east
of AngloGold Ashanti (70%) and Independence Group’s (30%) Tropicana Gold mine, a
project with in excess of seven million ounces of gold in Resources.
The Black Dragon prospect was initially sampled by AngloGold Ashanti with rock chip and
soil sampling. In a small area of outcrop of approximately 150 metres by 150 metres, 31 rock
chip samples returned better than 1g/t Au with a peak value of 573g/t Au.
In the previous quarter the Company continued to collate data from previous exploration on
the tenement area and has been using various techniques to evaluate further potential on
the tenement.
During this quarter Ventnor acquired better resolution geophysical data which is being reprocessed data in conjunction with geological interpretation in order to locate future drill
targets.
High resolution mag image over southern portion of Black Dragon tenements
A recent emissivity survey has highlighted areas of anomalous thermal response which
coincide with anomalous gold in previous auger and aircore drilling. These make compelling
targets for further investigation.
Competent Person’s Statement
The information in this release that relates to Exploration Results regarding the Black Dragon Project
is based on, and fairly represents, information compiled by Mr David Reid who is a Member of the
Australasian Institute of Mining and Metallurgy (MAusIMM). The information in this release that relates
to Exploration Results regarding the Thaduna Copper Project is from information supplied by Sandfire
Resources and compiled by Mr Reid. Mr Reid is a contractor to Ventnor Resources Limited. Mr Reid
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the “2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr Reid consents to the inclusion in this report of the matters based on
information provided by him and in the form and context in which it appears.
Interests in Mining Tenements
WESTERN AUSTRALIA
Thaduna/Green Dragon Project - Copper
Tenement
Status
M52/1060
M52/1061
L52/149
L52/150
Granted
Granted
Granted
Granted
Interest at
beginning of
quarter
(%)
65
65
65
65
Interests sold to
JV partner
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
65
65
65
65
Interest at
beginning of
quarter
(%)
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
Interest at
beginning of
quarter
(%)
100
100
100
100
100
100
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
100
100
100
100
100
100
Interest at
beginning of
quarter
(%)
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
-
Interest at
beginning of
quarter
(%)
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
Black Dragon Project - Gold
Tenement
Status
E39/1828
Granted
Warrawanda Project - Nickel
Tenement
Status
E52/2372
P52/1242
P52/1243
P52/1244
P52/1281
P52/1282
P52/1283
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Nickel Hills Project - Nickel
Tenement
Status
E52/2550
Granted
Doolgunna Project - Copper
Tenement
Status
E52/2548
Granted
Share your feedback
Discover