Arrowsmith North Maiden Mineral Resource
Released
Released
Announcement PDF
2 October 2018
ASX ANNOUNCEMENT
Arrowsmith North Maiden Mineral
Resource
Highlights:
•
Inferred Mineral Resource of 193.6 million tonnes @ 98%
SiO2
•
38% larger than previous Exploration Target*
•
Result is from shallow hand auger drilling
•
Aircore drilling expected to significantly increase the
Mineral Resource
•
Metallurgical testwork to-date confirms glass making
quality achievable
Ventnor Resources Limited (Ventnor or Company) (ASX: VRX) is
pleased to announce the results from the independent estimate of
the Mineral Resource at its Arrowsmith North prospect, which is
contained within its Arrowsmith Silica Sand Project, located 270km
north of Perth.
The result is based on an exploration program of 62 hand held auger
drill holes to a depth of 4-5 metres for a total of 235.6 metres which
was conducted December 2017 and is an acceptable standard for
use in a Mineral Resource estimate publicly reported in accordance
with the JORC Code.
ASX: VRX
Capital Structure
Shares on Issue:
365 million
Unlisted Options:
51.75 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
John Geary
Company Secretary
The project area is a substantial prominent dune system that has
only been tested with shallow auger. Additional drilling planned for
late 2018 will use deeper aircore drill holes and is expected to add
substantially to the maiden Mineral Resource.
Company Projects
The initial exploration program also provided a bulk sample which
was used for the second iteration of metallurgical testwork and has
verified that the sand can be beneficiated to glass making quality
(VRX announcement 20 September 2018). An additional third
iteration of testwork, which is underway, is expected to improve on
the currently known quality.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Ventnor Managing Director Bruce Maluish said: “This estimation
confirms our belief that Arrowsmith has the potential to be a very
substantial source of silica sand for glassmaking.”
“From our testwork we have been able to obtain samples of the final
products that we can send to prospective customers. Coupled with
this Mineral Resource estimate we can accelerate our marketing
program for potential sales in Asia” Maluish said.
The Company has had a number of enquiries from potential
customers in Asia.
Arrowsmith Silica Sands
Project, 270km north of
Perth, WA.
Biranup base metals and
gold Project adjacent to
the Tropicana Gold Mine,
WA.
Warrawanda Nickel
Project south of
Newman, WA.
The Company is actively
assessing other projects
in Australia.
The estimate exceeds the previous Exploration Target of 100 to 140 million tonnes at 95% to
98% SiO2.
Prior to the Maiden Mineral Resource estimate, the Company had estimated an Exploration
Target for Arrowsmith North;
Area
Arrowsmith North*
Tonnes (Mt)
Low
100
Grade SiO2
High
140
Low
95%
High
98%
The potential quality and grade of this Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource; it is uncertain
if further exploration will result in the estimation of a Mineral Resource.
This estimation was based on:
*Arrowsmith North Exploration Target
•
•
•
•
Exploration Target area 3,600 ha
1.6t/m3 in situ bulk density
Between 40% and 50% of area contains high grade silica sand
Depth of high-grade sand 4 to 5 metres
The Mineral Resource estimate at the Company’s Arrowsmith Central prospect will be
conducted following the next drill program later in 2018.
Figure 1: Arrowsmith Silica Sand Project Location
Executive Summary
Ventnor engaged CSA Global to
prepare a maiden Mineral Resource
estimate (MRE) for the Arrowsmith
North target area reportable under
the guidelines of the JORC Code.
Arrowsmith North is part of the
Arrowsmith Project 270km north of
Perth. See Figure 1 beside:
The MRE for the Arrowsmith North
Deposit comprises 193.6 Mt @ 98%
SiO2 reported in accordance with the
JORC Code 20121 Edition. The MRE
is based on the results obtained from
62 hand auger drill holes for 235.6 m
and defines two silica sand types,
white and yellow sand, geologically
logged and differentiated based on
colour and through chemical analysis
results. Based on metallurgical
testwork completed to-date, both
sand types are readily amenable to
upgrading by conventional washing
and screening methods to produce a
1 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC
Code, 2012 Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and
Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC).
high-purity silica sand product with high mass recoveries. The high-purity silica sand product
specifications are expected to be suitable for industries such as glass making.
The MRE results are shown in Table 1. Summary information is included in this announcement
and a JORC 2012 Table 1 is included as Appendix 1.
Table 1:
Classification
Inferred
Arrowsmith North Mineral Resource
Domain
Million Tonnes
SiO2%
Al2O3%
Fe2O3%
LOI%
TiO2%
Yellow Sand
149.4
97.7
1.1
0.4
0.5
0.2
White Sand
44.2
99.1
0.3
0.1
0.2
0.2
All Sand
193.6
98.0
0.9
0.3
0.4
0.2
*Note: Interpreted mineralisation is domained into different sand types based on drill logging data and publicly
available soil mapping information, above a basal surface wireframe defined based on the current drill sampling
depths. Depletion zones include the upper 0.5 m for rehabilitation purposes, and minor swamp zones in the east
and south of the modelled area. Differences may occur due to rounding.
Competent Persons Statements
The information in this document that relates to Arrowsmith Exploration Results is based on
data collected under the supervision of Mr David Reid, in his capacity as Exploration Manager
for Ventnor. Mr Reid, BSc (Geology), is a registered member of the Australian Institute of
Geoscientists and has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and the activity being undertaken to qualify as a
Competent Person under the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Reid consents to the inclusion
of the data in the form and context in which it appears.
The information in this document that relates to Mineral Resources is based on information
compiled by Mr Grant Louw, under the direction and supervision of Dr Andrew Scogings, who
were both full-time employees of CSA Global at the time of the Mineral Resource estimation.
Dr Scogings is a Member of the Australasian Institute of Mining and Metallurgy and a Member
of the Australian Institute of Geoscientists. He is a Registered Professional Geologist in
Industrial Minerals. Dr Scogings has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian
Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC
Code). Dr Scogings consents to the disclosure of information in this report in the form and
context in which it appears.
ASX Listing Rule 5.8.1 Summary
The following summary presents a fair and balanced representation of the information
contained within the MRE technical report:
•
Silica sand mineralisation at Arrowsmith North occurs within the coastal regions of the
Perth Basin, and the targeted silica sand deposits are the aeolian sand dunes that overlie
the Pleistocene limestones and paleo-coastline. (ASX LR 5.8.1 geology &geological
interpretation)
•
Samples were obtained from auger drilling. Quality of drilling/sampling and analysis, as
assessed by the Competent Person, is of an acceptable standard for use in a Mineral
Resource estimate publicly reported in accordance with the JORC Code. (ASX LR 5.8.1
Sampling & 5.8.1 Drilling)
•
Major and trace elements apart from SiO2 were analysed using a four-acid digest followed
by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry (ICP-OES)
analysis at the Intertek, Perth laboratory. Loss on Ignition at 1000°C (LOI) was analysed
by Thermal Gravimetric Analyser. SiO2 was back-calculated by subtracting all ICP major
and trace elements plus LOI from 100%, as this is the most accurate way of determining
SiO2 content for samples with very high SiO2. Certain of the ICP results were verified by
X-Ray Fluorescence (XRF) analyses. (ASX LR 5.8.1 Analysis).
•
The Mineral Resources were estimated above 3-d wireframe basal surfaces for the white
and yellow sands. These basal surfaces are nominally limited to the drill hole depths and
the extents are limited to within the Ventnor nominated Arrowsmith North target area. The
surfaces are based on the geological boundaries defined by logged sand types from the
drill data and with reference to the publicly available soil mapping data. The surface humus
layer is typically about 300 mm thick. In consultation with Ventnor, CSA Global considered
that the upper 500 mm (overburden) is likely to be reserved for rehabilitation purposes.
This overburden surface forms the upper boundary of the estimated Mineral Resource and
is depleted from the reported Mineral Resources. Comparatively minor areas that are
mapped as swamp or sandy swamp are also depleted from the Mineral Resources. (ASX
LR 5.8.1 Estimation methodology)
•
Grade estimation was completed using inverse distance weighting to the power of two.
(ASX LR 5.8.1 Estimation methodology)
•
The Mineral Resource is quoted from all classified blocks above the defined basal surface
wireframes for white and yellow sand and below the overburden surface layer. (ASX LR
5.8.1 cut-off grades)
•
The Mineral Resource was classified as Inferred based on drill hole logging, drill hole
sample analytical results, drill spacing, geostatistical analysis, confidence in geological
continuity, and metallurgical / process test results. (ASX LR 5.8.1 classification)
•
Roughly 15% of the interpreted mineralisation is extrapolated.
•
The JORC Code Clause 49 requires that industrial minerals must be reported “in terms of
the mineral or minerals on which the project is to be based and must include the
specification of those minerals” and that “It may be necessary, prior to the reporting of a
Mineral Resource or Ore Reserve, to take particular account of certain key characteristics
or qualities such as likely product specifications, proximity to markets and general product
marketability.” (ASX LR 5.8.1 Mining, metallurgy & economic modifying factors)
•
Therefore, the likelihood of eventual economic extraction was considered in terms of
possible open pit mining, likely product specifications, possible product marketability and
potentially favourable logistics and it is concluded that Arrowsmith North is an industrial
Mineral Resource in terms of Clause 49. (ASX LR 5.8.1 Mining, metallurgy & economic
modifying factors)
Detailed Information
Geology
Most economically significant silica sand deposits in Western Australia are found in the coastal
regions of the Perth Basin, and the targeted silica sand deposits are the aeolian sand dunes
that overlie the Pleistocene limestones and paleo-coastline, which also host the regional heavy
mineral deposits. Within the project area, data obtained from the Department of Agriculture
soil mapping shows there are pale and yellow deep sands predominating with lesser swampy
areas and occasional ironstone ridges. See Figure 1 below:
Figure 1: Simplified geology of the Arrowsmith North Area. Figure 6 section line A – B shown.
Tenements as in Figure 1
Source: Outlines based on DOAG soil mapping data, refined based on drill data.
Bulk Testwork
As was announced to ASX on 20th September 2018 – “Silica Sand Bulk Testwork Results” it
has been demonstrated that the Arrowsmith North sand can be upgraded using a simple
flowchart to produce glass grade silica sand. A bulk 300kg metallurgical composite was
generated from selected auger holes, used in this MRE. See Figure 3 below for holes selected
for bulk testwork:
Figure 3: Arrowsmith North Metallurgy holes
The composite was sent to the CDE Global facility in Cookstown, Ireland. The Bulk testwork
returned the following results, Table 2 below, after de-sliming, attritioning, spirals and magnetic
separation. The final product grade and particle sizes as reported are considered to be of
glass making quality.
Table 2:
CDE Global Bulk Testwork results
SAMPLE MATERIAL
SAMPLE
DESCRIPTION
ARROWSMITH NORTH
Raw Material
Non-magnetic
Al2O3
Fe2O3
K2O
TiO2
LOI1000C
ppm
11,313
1,797
ppm
3,885
414
ppm
881
276
ppm
1,096
198
%
SiO2
Calc.
SiO2 +
LOI
0.58
0.09
97.67
99.63
98.25
99.72
Mineral Resource Estimate
Drilling
Drilling over the project area has been completed by means of hand auger (see Figure 4) with
hole depths ranging from 1.2 m to 7 m and an average depth of 3.8 m. Drilling has been
completed along existing tracks, that form a nominal 800 m section line spacing, with drill
spacing of 400 m to 1,000 m apart along the section lines (see Figure 5).
Figure 4:
Figure 5:
Hand auguring yellow sand at Arrowsmith
Arrowsmith North auger hole locations
Mineral Resource Modelling
The Mineral Resource is estimated above 3-d wireframe basal surfaces for the white and
yellow sands (see Figure 6). These basal surfaces are nominally limited to the auger drill hole
depths, it should be noted that the full depth of silica sand was not tested due to the sampling
methodology. The modelled extents are limited to within the nominated Arrowsmith North
target area based on the geological boundaries defined by logged sand types from the drill
data and with reference to the publicly available soil mapping data (see Figure 1). The
overburden, reserved for rehabilitation, forms the upper boundary of the estimated Mineral
Resource and is depleted from the reported Mineral Resource. Comparatively minor areas
that are mapped as swamp or sandy swamp are also depleted from the Mineral Resource
(Figure 7).
Despite both white and yellow sands being readily amenable to beneficiation, they have been
separately interpreted, as they are separately estimated due to differences in grades of the
various mineral components.
Figure 6: Cross section A – B at 6738150 mN (See Figure 7), Looking north; 10 times Vertical exaggeration
Figure 7:
Modelled extents of mineralisation and depletion domains
Mineral Resource Classification
The Mineral Resource is classified as Inferred according to the principles contained in the
JORC Code. Material that has been classified as Inferred was considered by the Competent
Person to be sufficiently informed by geological and sampling data to imply but not verify
geological and grade continuity between data points. The results of the MRE are presented in
Table 3.
Table 3
Arrowsmith North Mineral Resource
Classification
Inferred
Domain
Million Tonnes
SiO2%
Al2O3%
Fe2O3%
LOI%
TiO2%
Yellow Sand
149.4
97.7
1.1
0.4
0.5
0.2
White Sand
44.2
99.1
0.3
0.1
0.2
0.2
All Sand
193.6
98.0
0.9
0.3
0.4
0.2
*Note: Interpreted mineralisation is domained into different sand types based on drill logging data and publicly
available soil mapping information, above a basal surface wireframe defined based on the current drill sampling
depths. Depletion zones include the upper 0.5 m for rehabilitation purposes, and minor swamp zones in the east
and south of the modelled area. Differences may occur due to rounding.
Future Work
A further iteration of testwork has been commenced by CDE Global using a refined flow sheet
to incorporate additional attritioning to further improve the quality of the potential final products.
The results of this work are expected to be available early in the December 2018 quarter.
Process circuit design and engineering will then follow, allowing for capital cost estimates to
be generated before the end of 2018.
The Company has an approved program of works to infill the Arrowsmith North Inferred
Mineral Resource with the intention of upgrading the resource to an Indicated category. This
drilling will be done by an Aircore drill rig which will not have the depth limitations of the hand
auger technique and the full depth of sand will be drill tested. The drilling program will consist
of 105 holes with an average depth of 11.3m (in comparison, the average depth of hand auger
holes was 3.8m).
The drill program is expected to commence early in 2019 due to limited drill rig availability and
the requirement for native title heritage clearance.
Further information:
Bruce Maluish
Managing Director
Ventnor Resources
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
About Ventnor
Ventnor Resources Ltd (Ventnor) (ASX: VRX) has significant silica sand projects including four granted
exploration licences and one application pending over the Arrowsmith Silica Sand Project, located 270km
north of Perth, Western Australia. Initial testwork has confirmed that the projects’ sand can be upgraded
to glassmaking quality. Further work is under way to enable feasibility studies to be completed.
Ventnor has also completed the acquisition of the Muchea Silica Sand Project, 50km north of Perth, which
complements the Arrowsmith Silica Sand Project with additional significant silica sand resources. Further
work is also under way at this project to enable a feasibility study to be completed.
Ventnor also has granted tenements adjacent to the Tropicana Gold Mine in Western Australia’s
Goldfields that are prospective for gold and base metals (Biranup Project), with prospects identified
following an extensive review of historical data.
Also, in Western Australia, 40km south of Newman, is Ventnor’s Warrawanda Nickel Project, which is
prospective for nickel sulphides.
Proven Management
The Ventnor directors have extensive experience in mineral exploration and mine development in to
production and in the management of publicly listed mining and exploration companies.
Project Locations
ASX Announcements
Ventnor Resources (2017). New Arrowsmith Silica Sand Project. ASX Release 12 October 2017.
Ventnor Resources (2017). Arrowsmith Silica Sands Project Sampling. ASX Release 14 December
2017.
Ventnor Resources (2017). Arrowsmith Silica Sands Project Testwork. ASX Release 30 January
2018.
Ventnor Resources (2018). Arrowsmith Silica Sand Project Tenement Grants. ASX Release 12 April
2018.
Ventnor Resources (2018). Arrowsmith Silica Sand Project Update. ASX Release 15 August 2018.
Ventnor Resources (2018). Arrowsmith Silica Sand Project. ASX Release 30 August 2018.
Ventnor Resources (2018). Silica Sand Bulk Testwork Results. ASX Release 20 September 2018.
APPENDIX 1 – JORC 2012 Table 1
Sections 1 and 2 provided by Ventnor Resources Ltd., Section 3 provided by CSA Global
Section 1: Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
Auger drilling samples are 1m down hole intervals with sand collected
from a plastic tub which received the full sample, ~8kg, from the hole.
The sand was homogenised prior to sub sampling, two sub-samples, A
and B, of ~200g were taken from the drill samples. A bulk sample of
~5kg was retained for each 1m interval for metallurgical testwork.
The “A” sample was submitted to the Intertek Laboratory in
Maddington, Perth for drying, splitting (if required), pulverisation in a
zircon bowl and a specialised silica sand 4 Acid digest and ICP
analysis.
All auger samples were weighed to determine if down hole collapse
was occurring, if the samples weights increased significantly the hole
was terminated to avoid up hole contamination.
The targeted mineralisation is unconsolidated silica sand dunes, the
sampling techniques are “industry standard”.
Due to the visual nature of the material, geological logging of the drill
material is the primary method of identifying mineralisation.
A 100mm diameter hand screw auger was used to drill until hole
collapse.
All material recovered from the hole is collected in a plastic drum and
weighed, the weights are used to determine when the hole is
collapsing, and drilling is terminated.
No relationship is evident between sample recovery and grade.
Geological logging of drill samples is done by the field geologist with
samples retained in chip trays for later interpretation.
Logging is captured in an excel spreadsheet, validated and uploaded
into an Access database.
Auger drill material, ~8kg, is collected in a plastic tub and homogenised,
2 x 200g sub-samples, A and B, are taken from the drill material. The A
sample is submitted to the laboratory and the B sample is retained for
repeat analysis and QAQC purposes. A 5kg bulk sample is retained for
later metallurgical testwork.
The sample size is considered appropriate for the material sampled.
The 200g samples are submitted to the Intertek Laboratory in
Maddington, Intertek use a zircon bowl pulveriser to reduce the particle
size to -75µm.
Samples were submitted for analysis to the Intertek Laboratory in
Maddington in Perth WA. The assay methods used by Intertek are as
follows: multi-elements are determined by a specialised four-acid digest
including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids in
Teflon tubes. Analysed by Inductively Coupled Plasma Mass
Spectrometry, silica is reported by difference.
The assay results have also undergone internal laboratory QAQC,
which includes the analysis of standards, blanks, and repeat
measurements.
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Quality of
analytical data
and laboratory
tests
Criteria
Verification of
sampling and
analyses
Location of
data points
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
Sample
security
Audits or
reviews
Commentary
The Company has been validating a high-purity silica standard that was
created for the Company by OREAS Pty Ltd. This was required as
there is no commercial standard available for high purity silica sand.
The standard was “round robin” assayed at several laboratory’s in Perth
prior to the commencement of drilling.
The standard was then included in the drill sample submissions to
Intertek, in sequence, on a ratio of 1:20. Field duplicate samples were
submitted in a ratio of 1:20 and in addition to this Intertek routinely
duplicated analysis from the pulverised samples in a ratio of 1:25. The
number of QAQC samples therefore represents ~14% of the total
assays.
A full analysis of all the quality control data has been undertaken. This
analysis validates the drill assay dataset and conforms with the
guidelines for reporting under the JORC 2012 code.
Significant intersections validated against geological logging.
No twinned holes have been completed.
Drill hole locations were measured by hand-held GPS with the
expected relative accuracy; GDA94 MGA Zone 51 grid coordinate
system is used. The reduced level (RL) of the drilling collars is
generated from publicly available SRTM data. The SRTM data is
compared to the available Landgate Geodetic Survey Marks to validate
the data that it is appropriate for use.
Auger holes were spaced 400-1,000m apart along existing tracks.
Due to the relatively low variability of assays between drill holes the
current spacing is sufficient for the estimation of a Mineral Resource.
No sample compositing (down hole) has been done.
Sampling is being done on aeolian sand dunes the auger orientation is
therefore considered appropriate.
All samples are selected onsite under the supervision of Ventnor
Geological staff.
Samples are delivered to the Intertek laboratory in Maddington. Intertek
receipt received samples against the sample dispatch documents and
issued a reconciliation report for every sample batch.
There has been no audit or review of sampling techniques and data yet.
Section 2: Reporting of Exploration Results
Criteria
Commentary
Mineral tenement
and land tenure
status
Auger drilling was done on Tenement E70/4987 and E70/5027 which
are 100% held by a wholly owned subsidiary of Ventnor Resources
Limited.
The tenements were granted on 06/04/2018 and 13/06/2018
respectively, and all drilling was conducted on vacant Crown land.
Minor exploration for mineral sands has been completed by various
Companies.
No exploration for silica sand has been done.
The targeted silica sand deposits are the aeolian sand dunes that
overlie the Pleistocene limestones and paleo-coastline which host the
Gingin heavy mineral deposits.
Not relevant. Exploration results are not being reported. Mineral
Resources are being disclosed (see Section 3). Sample and drillhole
coordinates are provided in previous market announcements.
Not relevant. Exploration results are not being reported. Mineral
Resources are being disclosed (see Section 3).
Not relevant. Exploration results are not being reported. Mineral
Resources are being disclosed (see Section 3).
Exploration done
by other parties
Geology
Drillhole
information
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
Balanced
reporting
Other substantive
exploration data
Further work
Refer to figures within the main body of this report.
Not relevant. Exploration results are not being reported. Mineral
Resources are being disclosed (see Section 3).
Geological observations are consistent with aeolian dune
mineralisation.
Seven, certified, dry in situ bulk density measurements were
completed by Construction Sciences Pty Ltd using a nuclear
densometer.
No groundwater was intersected during drilling.
The mineralisation is unconsolidated sand.
A first pass Metallurgical testwork program has been completed with
demonstrates conventional sand processing techniques can upgrade
the sand to a high value product. Further testwork is required to
determine the best quality final product.
Infill drilling will be undertaken to further assess the depth and
variability of the high-grade silica sand.
Section 3: Estimation and Reporting of Mineral Resources
Criteria
Commentary
Database
integrity
Data used in the MRE is sourced from a Microsoft Access database.
Relevant tables from the Microsoft Access database are exported to
Microsoft Excel format and converted to csv format for import into
Datamine Studio 3 software.
Validation of the data imported comprises checks for overlapping
intervals, missing survey data, missing analytical data, missing
lithological data, and missing collars.
No site visit by representatives of CSA Global has taken place at this
early stage of project development. CSA Global has previous
experience with this project in the form of an Independent Technical
Assessment Report completed for Ventnor. Based on this work and
publicly available data relating to the area CSA Global has no reason
to believe that the interpreted mineralisation does not exist. It is
envisaged that a site visit would be required by a Competent Person,
or their representative when further drilling is undertaken that may
result in a higher classification than Inferred under the guidelines of the
JORC Code.
Silica sand mineralisation at Arrowsmith North occurs within the
coastal regions of the Perth Basin, and the targeted silica sand
deposits are the aeolian sand dunes that overlie the Pleistocene
limestones and paleo-coastline.
Within the project area, data obtained from the Department of
Agriculture soil mapping shows there are pale (logged by Ventnor as
white sands) and yellow deep sands predominating, with lesser
swampy areas and occasional ironstone ridges.
The geological modelling was completed based on this soil mapping
data in conjunction with the auger drill logging data. The Mineral
Resource is estimated above 3-d wireframe basal surfaces for the
white and yellow sands. These basal surfaces are nominally limited to
the auger drill hole depths, and it should be noted that the full depth of
silica sand was not tested due to the sampling methodology. The
modelled extents of the yellow and white sands are further limited to
within the Ventnor nominated Arrowsmith North target area.
The surface humus layer is typically about 300 mm thick. In
consultation with Ventnor, CSA Global decided that the upper 500 mm
(overburden) is likely to be reserved for rehabilitation purposes. This
overburden surface forms the upper boundary of the estimated Mineral
Resource and is depleted from the reported Mineral Resources. The
comparatively minor areas that are mapped as ironstone ridges,
swamp or sandy swamp are also depleted from the Mineral
Resources.
Despite both white and yellow sands being readily amenable to
beneficiation, they have been separately modelled, based on the drill
logging data and mapped soil type boundaries, as they are separately
estimated due to differences in grades of the various mineral
components.
Site visits
Geological
interpretation
Criteria
Dimensions
Commentary
Assumptions have been made on the horizontal extents of the
mineralisation based on the soil mapping data and the spacing and
extents of the drilling information. A nominal maximum horizontal
extrapolation limit of 200 m past known drill data points has been
applied with the material types additionally constrained within the
Ventnor nominated target area and by the mapped material type
boundaries. Although it is understood that the thickness of the sand
layers is likely to be much more than current auger drilling depths over
significant areas of the modelled area, the vertical extents have been
nominally limited to the current auger drilling depths. Approximately
15% of the modelled mineralisation zones can be considered to be
extrapolated.
Alternative interpretations based on the currently av