Testwork Update and Product Catalogues
Released
Released
Announcement PDF
26 February 2019
ASX ANNOUNCEMENT
Latest Testwork and Product Catalogues
from
Arrowsmith and Muchea
Capital Structure
Highlights:
•
•
ASX: VRX
Improved results from all projects with grades reaching:
Shares on Issue:
366 million
o
Muchea: +99.9% SiO2 (<80ppm Fe2O3)
Unlisted Options:
63 million
o
Arrowsmith North: 99.7% SiO2
Corporate Directory
o
Arrowsmith Central: 99.6% SiO2.
Paul Boyatzis
Non-Executive Chairman
Expanded product catalogue including:
o
High-Grade products used for ultra-clear glass
from Muchea;
o
Glassmaking products from Arrowsmith and
Muchea;
o
Foundry sand products from Arrowsmith.
•
Preferred circuit design established.
•
Process plant engineering to be completed March 2019.
•
In-fill drilling planned for March 2019.
VRX Silica Limited (VRX Silica or Company) (ASX: VRX) is pleased
to announce the results from its testwork program to produce silica
sand products from its Arrowsmith Silica Sand Project, located 270km
north of Perth, WA, and its Muchea Silica Sand Project, 50km north
of Perth.
The Company has completed its third iteration of testwork on each of
its projects: Arrowsmith North, Arrowsmith Central and Muchea Silica
Sand Projects.
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
John Geary
Company Secretary
Company Projects
Arrowsmith Silica Sand
Project, 270km north of
Perth, WA.
Muchea Silica Sand Project,
50km north of Perth, WA.
Boyatup Silica Sand Project,
100km east of Esperance,
WA.
VRX Silica Managing Director Bruce Maluish said: “The results from
this testwork are a culmination of three iterations during the past year
to both determine the optimum products from each of the projects and
to contribute to the final circuit design.”
Biranup base metals and
gold Project adjacent to the
Tropicana Gold Mine, WA,
(subject to option with
MCT).
“There are two products from each of Arrowsmith and Muchea for the
glassmaking industry, and four products from Arrowsmith for the
foundry industry,” said Maluish.
Warrawanda Nickel Project
south of Newman, WA.
A catalogue has now been produced and forwarded to our potential
customers.
Based on this testwork, the circuit design for the processing plant has
been finalised, while the engineering work by CDE Global (CDE) is
nearing completion.
The Company is actively
assessing other silica sand
projects in Australia.
The engineering works include:
-
Concept flow sheets (mass and water balance);
-
Equipment list (containing power demand);
-
Site Drawings;
-
Capex Estimate +/- 15%;
-
Concept Construction and Installation schedules.
Test Work Program
Composite samples from all projects were sent to world leading sand testing laboratory CDE
(www.cdeglobal.com), in Cookstown, Northern Ireland, for testing. An initial testwork program
was completed and the results announced on 20 September 2018 (Silica Sand Bulk Testwork
Results). The results demonstrated that glass-quality silica sand could be produced from
Muchea, Arrowsmith North and Arrowsmith Central Projects. This outcome enabled the
estimation of Mineral Resources for the three projects (announced 20 November 2018, 2
October 2018, and 13 December 2018 respectively).
The table below summarises the Company’s current silica sand resources:
Table 1: Summary of Silica Sand Mineral Resources
Indicated
Project Name
Mt
SiO2%
Inferred
Total
Mt
SiO2%
Mt
SiO2%
Arrowsmith North
193.6
98.0%
193.6
98.0%
Arrowsmith Central
28
97.7%
28
97.7%
Muchea
19
99.7%
172
99.6%
191
99.6%
Total
19
99.7%
393.6
98.8%
412.6
98.7%
A refined testwork flow sheet was developed after reviewing the results of the initial program
(see Figure 1). The major changes in this program have been the increase in attritioning
(twice), and the inclusion of a range of magnetic intensities in the magnetic separator, HI Filter.
Attritioning is a high energy interaction of grains rubbing on grains which liberates
attached fine particles and reduces particle size by breakage on corners and grain
boundaries. This reduces contaminants and improves particle shape.
Figure 1: Testwork Flow Sheet
The CDE attrition cells are a high-energy paddle cell (see Figure 2), which works at a highdensity slurry of 75% solids.
Figure 2: Attrition cells
High Density Slurry
The latest program introduced a second stage of attritioning which showed positive results,
see Figure 3.
Figure 3: Results of attritioning
The other major change was a range of magnetic intensities using a HI Filter magnetic
separator to determine the effectiveness in reducing iron levels. The HI Filter process,
illustrated in Figure 4, uses a magnetised mesh to separate feed material into three distinct
fractions: magnetics, middlings, and non-magnetics. The material which passes freely through
the magnetised filter is “non-magnetic” since the magnetic field has little or no effect on the
material. The HI Filter is then flushed, which releases lightly magnetic particles to a separate
stream labelled “middlings.” Finally, the Hi Filter is de-energised and a combination of water
and compressed air is used to discharge the magnetic particles which have collected in the
matrix; this material is collected and labelled “magnetics.”
Figure 4: Schematic of Hi Filter process
The testwork program also incorporated a significant increase in sizing and sample analysis
to better understand the physical and chemical properties of the sand at all stages of the
testwork program. This detailed information has allowed for a refinement of the process flow
design and the creation of a catalogue of products that are possible to be produced from the
three projects.
Based on this testwork, the circuit design for the processing plant has been finalised and the
engineering work by CDE is nearing completion. An image of a conceptual processing plant is
shown in Figure 5.
Figure 5: Conceptual sand processing plant
The Company is now able to generate a catalogue of products that can be produced from the
three projects. These products are designed to supply the Glass-Making Industry and Foundry
Industry with the products presented below. The individual Technical Data Sheets for each
product are available on the Company’s website www.vrxsilica.com.au.
Representative samples of these products can be sent to potential customers upon request.
Silica Sand Catalogue – Glass Sand
Chemical Composition (%)
Product
SiO2
Al2O3
Fe2O3
TiO2
CaO
MgO
K2O
Muchea-F80
Muchea-F150
Arrowsmith-NF500
Arrowsmith-CF400
+99.9
99.8
99.7
99.6
0.02
0.07
0.20
0.25
0.008
0.015
0.050
0.040
0.030
0.035
0.035
0.030
0.005
0.020
0.010
0.005
0.001
0.001
0.002
0.001
0.004
0.004
0.030
0.050
Particle Size
Sieve Opening / µm Retained
Product
850
Muchea-F80
Muchea-F150
Arrowsmith-NF500
Arrowsmith-CF400
600
425
300
212
150
106
0.5%
49%
0.5%
0.5%
40%
44%
50%
0.5%
42%
39%
0.5%
88%
17%
16%
11%
1%
0.5%
0.5%
0%
75
53
Glass Sand Products
Retained %
100%
80%
60%
40%
20%
0%
850
600
425
300
212
150
106
75
53
Particle size distribution (µm)
Muchea-F80
Muchea-F150
Arrowsmith - NF500
Arrowsmith -CF400
Physical Properties
Product
Muchea-F80
Muchea-F150
Arrowsmith-NF500
Arrowsmith-CF400
Density
Hardness
2.65
7
Colour
White
White
Cream
Cream
Ph
Moisture
LOI
7
<5%
0.1
Silica Sand Catalogue – Foundry Sand
Chemical Composition (%)
Product
SiO2
Al2O3
Fe2O3
TiO2
CaO
MgO
K2O
Arrowsmith-N20
Arrowsmith-N40
Arrowsmith-C20
Arrowsmith-C50
99.7
99.7
99.6
99.6
0.20
0.20
0.25
0.25
0.05
0.05
0.04
0.04
0.035
0.035
0.030
0.030
0.010
0.010
0.005
0.005
0.002
0.002
0.001
0.001
0.03
0.03
0.05
0.05
Particle Size
Sieve Opening / Mesh Retained
Product
10
20
30
40
50
70
100
140
200
Arrowsmith-N20
Arrowsmith-N40
Arrowsmith-C20
Arrowsmith-C50
0.1%
3%
0%
22%
0%
87%
21%
30%
0.3%
8%
36%
38%
32%
1%
24%
3%
28%
0.1%
13%
0.3%
17%
5%
0.1%
14%
1%
0%
8%
0%
6%
AFS No
21
36
22
49
1%
Foundry Sand Products
Retained %
100%
80%
60%
40%
20%
0%
10
20
30
40
50
70
100
140
200
Particle size distribution (Mesh)
Arrowsmith-N20
Arrowsmith-N40
Arrowsmith-C20
Arrowsmith-C50
Physical Properties
Product
Density
Hardness
Arrowsmith-N20
Arrowsmith-N40
Arrowsmith-C20
Arrowsmith-C50
2.65
7
Colour
Cream
Cream
Cream
Cream
Ph
Moisture
LOI
7
<5%
0.1
Future Work
Aircore drilling of all three projects is planned to commence March 2019 to infill, extend and
upgrade the JORC status for each of the existing Resources. As results become available the
Mineral Resource Estimates for each project will be updated.
Competent Persons Statements
The information in this document that relates to Arrowsmith Exploration Results is based on
data collected under the supervision of Mr David Reid, in his capacity as Exploration Manager.
Mr Reid, BSc (Geology), is a registered member of the Australian Institute of Geoscientists
and has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and the activity being undertaken to qualify as a Competent Person under
the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources, and Ore Reserves.” Mr Reid consents to the inclusion of the data in the form and
context in which it appears.
The information in this document that relates to Mineral Resources is based on information
compiled by Mr Grant Louw who is a full-time employee of CSA Global, under the direction
and supervision of Dr Andrew Scogings who is an Associate of CSA Global. Dr Scogings is a
Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian
Institute of Geoscientists. He is a Registered Professional Geologist in Industrial Minerals. Dr
Scogings has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for the Reporting of Exploration
Results, Mineral Resources, and Ore Reserves (JORC Code). Dr Scogings consents to the
disclosure of information in the form and context in which it appears.
For silica sand enquiries contact Mr Yoonil Kim:
Manager International Sales
yoonilk@vrxsilica.com.au
+60 17 687 8238
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
About VRX Silica
VRX Silica Ltd (VRX Silica) (ASX: VRX) has significant silica sand projects in Western Australia.
The Arrowsmith Silica Sand Project, located 270km north of Perth, comprises four granted exploration licences
with one exploration licence and two mining lease applications pending. The Muchea Silica Sand Project,
located 50km north of Perth, comprises one granted exploration licence, with one exploration licence and one
mining lease applications pending. Testwork has confirmed a range of silica sand products which are capable
of production at both projects. Further work is underway to enable feasibility studies to be completed.
The recently purchased Boyatup Silica Sand Project, located 100kms east of Esperance, comprises one
granted exploration licence. Since acquisition the Company has applied for an extension exploration license.
Initial indications are that this project will complement both Arrowsmith and Muchea while adding to the silica
products VRX Silica will look to produce.
VRX Silica also has granted tenements at its Biranup Project, adjacent to the Tropicana Gold Mine in Western
Australia’s Goldfields that are prospective for gold and base metals, which are currently under option for partial
sale and farm-in joint venture.
Also in Western Australia, 40km south of Newman, is VRX Silica’s Warrawanda Nickel Project, which is
prospective for nickel sulphides.
Proven Management
The VRX Silica Board and management team have extensive experience in mineral exploration and mine
development into production and in the management of publicly listed mining and exploration companies.
Project Locations
Share your feedback
Discover