Arrowsmith Silica Sand Project
Released
Released
Announcement PDF
30 August 2018
ASX ANNOUNCEMENT
Arrowsmith Silica Sand Project
Highlights:
Hand auger program to collect bulk sample completed
Bulk sample testing now underway
Preliminary results indicate glassmaking quality
QA/QC results indicate low assay variability
Maiden Resource estimate underway
ASX: VRX
Capital Structure
Shares on Issue:
306.2 million
Unlisted Options:
21.25 million
Ventnor Resources Limited (Ventnor or Company) (ASX: VRX) is
pleased to announce bulk sampling results from its auger drill
program at the Arrowsmith Silica Sand Project, located 270km
north of Perth, WA.
Corporate Directory
Ventnor’s drilling included a hand-held auger drilling program of 123
holes to obtain adequate sample for bulk testwork.
Bruce Maluish
Managing Director
A full analysis of all the quality control data has now been
assessed. This analysis validates the hand auger sample assay
dataset and conforms with the guidelines for reporting under the
JORC-2012 code.
Peter Pawlowitsch
Non-Executive Director
Ventnor Managing Director, Bruce Maluish said: “The results of the
preliminary testwork are very encouraging as they achieve the
desired glassmaking standard of 99.5% SiO2.
“Initial results have supported the decision to undertake further
iterations of testwork with additional attritioning and magnetic
separation to achieve even higher quality products. Final testwork
products enable marketing and to support a JORC-2012 compliant
Mineral Resource estimation”.
Paul Boyatzis
Non-Executive Chairman
John Geary
Company Secretary
Company Projects
Arrowsmith Silica Sands
Project, 270km north of
Perth, WA.
The testwork program, which is ongoing, will also produce sufficient
quantities of products to enable samples to be sent to prospective
customers.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
The Company has already received a number of enquiries from
potential Asian customers.
Biranup base metals and
gold Project adjacent to
the Tropicana Gold Mine,
WA.
Ventnor has engaged experienced geological consultancy, CSA
Global, to undertake the Maiden Resource estimate at Arrowsmith
North and Arrowsmith Central silica sand project areas. The
estimate is expected during September 2018.
Warrawanda Nickel
Project south of
Newman, WA.
The Company is actively
assessing other projects
in Australia.
Detailed Information
The Arrowsmith Silica Sand Project is located 270 kms north of Perth, 100km south of the
Port of Geraldton in the Mid-West of Western Australia and comprises 4 granted tenements
and 1 application for a total landholding of 379km2, (refer Figure 1 below). The Project is
connected to the Geraldton Port via the underutilised Geraldton to Eneabba Railway line
operated by Arc Infrastructure.
Figure 1: Arrowsmith Silica Sand Project Location
Hand Auger Sampling Program
Ventnor has completed hand auger sampling over the tenements to gain bulk sand samples
for testwork to determine if the in situ sand is able to be upgraded to glassmaking grade for
potential bulk export. Hand auger drilling was completed using a 100mm screw auger to
retrieve 1m downhole samples. Drilling encountered unconsolidated damp sand and was
terminated when dry conditions were encountered downhole. As a result, the full depth of
potential silica sand was not tested due to hole collapse. Full depth will be tested with aircore
drilling in the near future.
Figure 2 below shows the locations of the 123 hand auger holes.
Figure 2: Arrowsmith Auger hole locations
Arrowsmith North Bulk Sampling
Arrowsmith North contains a broad, large scale dune over 10km in length. There are many
existing tracks from years of oil and gas seismic exploration surveys crisscrossing the
tenement, resulting in good access and auger coverage. Figure 3 shows the auger coverage
coloured by grade. As with Figure 4, the grade is a length weighted arithmetic average over
the full depth of the hole sampled.
Figure 3: Arrowsmith North Auger hole locations, coloured by grade, showing 5m topographical
contours and project area in red
Arrowsmith Central Bulk Sampling
Arrowsmith Central is a flatter terrain that slopes moderately from the western Tamala
limestone outcrops, up to the east edge of the tenement, as shown in Figure 4 below.
Existing tracks are limited, reflected by the auger coverage.
Figure 4: Arrowsmith Central Auger hole locations, coloured by grade, showing 5m
topographical contours and project area in red
Assay Results
Auger hole composites were created using the full length that was sampled and length
weighted grades for all elements reported. The full auger hole composite table is available in
the Appendix, and shows the low variability in grade between holes. Figure 5, below, is a
histogram of the average auger hole composites with the Exploration Target grade range and
average grade for each Area.
Exploration Targets
Based on these results the Company has developed Exploration Targets for the Arrowsmith
Silica Sand Project. These are shown in Table 1.
Tonnes (Mt)
Area
Grade SiO2
Low
High
Low
High
Arrowsmith North
100
140
95%
98%
Arrowsmith Central
40
70
95%
98%
Total
140
210
95%
98%
The potential quality and grade of these Exploration Targets are conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource. It is uncertain
if further exploration will result in the estimation of a Mineral Resource.
These estimations are based on:
Arrowsmith North Exploration Target
Exploration Target area 3,600 ha
1.6t/m3 in situ bulk density
Between 40% and 50% of area contains high grade silica sand
Depth of high grade sand 4 to 5 metres
In situ grade ranges from 95% to 98% SiO2.
Arrowsmith Central Exploration Target Area
Exploration Target area 3,000 ha
1.6t/m3 in situ bulk density
Between 40% and 50% of area contains high grade silica sand
Depth of high grade sand 2 to 3 metres
In situ grade ranges from 95% to 98% SiO2.
The dry in situ bulk density has been measured by an independent contractor using a nuclear
densometer at 11 sites, with the results to be used in the JORC compliant Mineral Resource
Estimation.
Auger drilling in the Exploration Target Areas has been completed and is adequate for a
JORC-2012 compliant Maiden Mineral Resource estimate but further Aircore drilling is
planned for mid to late September 2018 to upgrade the level of confidence and increase the
Resource by drilling deeper than the hand-held auger.
Quality Control Data
The Company has been validating a high-purity silica standard that was created for the
Company by OREAS Pty Ltd. This was required as there is no commercial standard
available for high purity silica sand. The standard was “round robin” assayed at several
laboratories in Perth prior to the commencement of drilling. The standard was then included
in the drill sample submissions to Intertek, in sequence, on a ratio of 1:20. Field duplicate
samples were submitted in a ratio of 1:20. In addition to the duplicates the laboratory
routinely repeated analysis from the pulverised samples in a ratio of 1:25. The number of
QA/QC samples represents 14% of the total assays.
A full analysis of all the quality control data has now been assessed. This analysis validates
the drill assay dataset and conforms with the guidelines for reporting under the JORC-2012
code.
Bulk Testwork
The Company has previously reported testwork results for the Arrowsmith Silica Sand Project,
see Announcement 30th January 2018 – “Arrowsmith Silica Sand Project Testwork”. This
testwork reported that a grade of 99.5% SiO2 was achieved on 70% of the feed mass. A
grade of 99.5% SiO2 is believed to be a critical grade for glassmaking quality sand.
In addition to this testwork, the Company is in the process of testing bulk samples to
determine the final product specifications. A total of 1.5 tonnes of Arrowsmith sand is in the
process of bulk testing at the Nagrom Laboratory in Kelmscott and the CDE Global
Laboratory in Northern Ireland. The results of the testwork are expected to be available in
September and will allow for final process circuit and engineering design.
Mineral Resource Estimation
Experienced geological consultancy, CSA Global, have been engaged to estimate a Maiden
Mineral Resource for the Arrowsmith Silica Sand Project. This is expected to be completed in
September 2018.
Appendix 1 – Auger Composite Result Tables
MGA
East
MGA
Nth
Depth
SiO2 Calc. +
LOI1000C
Al2O3
CaO
Calc.
Fe2O3
K2O
Na2O
TiO2
LOI1000C
North
319594
6730807
5
98.1%
98.5%
9,134
-
3,700
27
46
1,636
0.45
North
319173
North
318763
6730800
6
98.1%
98.6%
8,852
-
3,683
205
21
1,311
0.45
6730793
6
97.5%
98.1%
12,807
17
4,533
301
50
1,499
0.59
North
318344
6730785
3.7
97.0%
97.6%
15,418
129
5,225
960
84
1,602
0.69
North
317953
6730784
2.5
98.3%
98.6%
8,074
-
1,633
2,083
129
2,235
0.30
North
317537
6730775
2.8
98.5%
98.7%
5,875
-
1,833
1,865
119
2,967
0.20
North
318665
6729100
3
98.5%
98.9%
North
318486
6729972
3
97.6%
98.1%
6,342
12,522
98
37
1,400
2,967
1,063
1,345
80
96
1,488
1,859
0.40
0.51
North
318216
6731584
4.5
97.3%
97.9%
13,799
27
4,740
395
66
1,624
0.62
North
317295
6731574
4.5
97.1%
97.8%
14,367
43
4,900
858
94
1,813
0.68
North
319099
6731598
4.8
98.2%
98.6%
8,352
-
3,560
214
52
1,535
0.43
North
318226
6733688
2
98.4%
98.9%
6,680
79
2,800
197
55
1,445
0.49
North
318079
6732471
3.8
97.7%
98.2%
11,218
-
4,175
370
62
1,546
0.51
North
317399
6733683
3.8
97.6%
98.1%
11,699
25
4,650
363
67
1,748
0.55
North
316563
6733679
4.3
97.4%
98.0%
12,729
-
4,840
722
79
1,463
0.56
North
316776
6732460
3.8
96.7%
97.4%
16,193
112
5,775
1,613
137
1,932
0.65
North
319921
6730081
3.5
98.0%
98.4%
8,849
29
4,450
430
66
1,801
0.45
North
320029
6729362
3.5
98.1%
98.6%
8,187
25
4,325
331
59
1,152
0.46
North
317229
6729829
1.5
97.6%
98.1%
11,014
51
2,350
2,822
164
2,645
0.43
North
317762
6734273
3
98.4%
98.9%
6,746
33
2,833
265
54
1,318
0.47
North
317339
6734270
5
97.9%
98.4%
10,768
-
2,520
517
70
2,023
0.49
North
316933
6734269
4
97.9%
98.5%
9,663
-
3,825
302
60
1,431
0.53
North
316540
6734266
4.8
97.5%
98.1%
11,989
23
4,760
570
193
1,563
0.61
North
316145
6734266
3.3
97.3%
97.8%
12,799
114
5,150
1,164
113
2,104
0.58
North
315764
6734268
1.2
96.4%
97.1%
17,833
141
6,100
2,401
172
1,803
0.78
North
315354
6734267
1.7
98.0%
98.7%
7,938
69
2,800
758
55
864
0.74
North
317739
6735389
4
98.3%
98.7%
7,527
-
3,250
298
50
1,779
0.39
North
316957
6735368
3
97.8%
98.3%
10,708
68
3,533
551
72
1,983
0.52
North
316107
6735344
2.6
97.6%
98.2%
11,486
73
4,300
858
90
1,204
0.55
North
315568
6735330
3.9
97.4%
98.0%
12,384
88
4,675
1,251
110
1,616
0.56
North
317699
6736324
7
99.4%
99.5%
1,925
-
914
585
59
1,554
0.11
North
316909
6736308
6
99.0%
99.2%
3,660
-
883
1,807
115
1,661
0.14
North
316565
6736302
4.8
97.4%
98.0%
11,920
133
3,780
2,071
145
2,017
0.54
North
316125
6736294
5.8
97.8%
98.3%
10,664
-
3,983
825
80
1,616
0.44
North
315716
6736284
2.5
97.1%
97.6%
14,147
73
5,267
2,348
157
1,481
0.56
North
315310
6736276
2.8
97.6%
98.1%
11,840
-
4,800
1,081
95
1,387
0.49
North
314900
6736268
2.4
97.6%
98.1%
11,002
158
4,600
1,069
96
1,720
0.54
North
314518
6736261
2.5
97.7%
98.2%
10,739
40
4,633
712
76
1,361
0.54
North
314250
6737169
2.5
98.5%
98.9%
6,548
-
2,367
891
79
1,348
0.36
North
314880
6737172
1.5
98.8%
99.1%
5,389
-
1,850
548
66
963
0.35
North
315691
6737177
4.4
97.2%
97.8%
13,161
45
4,960
1,902
139
1,326
0.59
North
316496
6737190
1.8
99.0%
99.3%
3,484
-
600
1,797
123
1,351
0.24
Area
SiO2
MGA
East
MGA
Nth
Depth
SiO2 Calc. +
LOI1000C
Al2O3
CaO
Calc.
Fe2O3
K2O
Na2O
TiO2
LOI1000C
North
317358
6737198
1.8
99.1%
99.5%
2,385
-
1,050
566
62
1,019
0.35
North
318121
6737216
1.5
99.0%
99.3%
2,850
64
1,150
811
168
1,848
0.30
North
318080
6738166
1.8
99.2%
99.4%
2,206
-
650
1,312
101
1,720
0.19
North
317282
6738144
2.8
99.4%
99.6%
1,636
-
433
670
68
1,325
0.14
North
316440
6738144
5
99.3%
99.4%
2,137
28
740
633
67
1,803
0.18
North
316007
6738140
4.8
98.1%
98.5%
9,049
-
3,780
477
75
1,737
0.42
North
315634
6738121
4.5
98.1%
98.5%
8,973
-
3,420
694
78
1,295
0.41
North
315289
6738115
5.4
97.1%
97.6%
13,903
35
4,300
2,893
196
2,032
0.51
North
314864
6738111
4
97.9%
98.4%
9,474
121
3,875
733
81
1,440
0.56
North
314477
6738108
4.3
98.1%
98.5%
9,046
52
3,360
694
64
1,325
0.44
North
314802
6738857
5
98.2%
98.6%
8,322
20
3,000
637
45
1,474
0.41
North
315621
6738853
4
97.8%
98.2%
10,761
85
3,625
1,423
94
1,429
0.48
North
316427
6738856
6.8
99.1%
99.3%
2,692
15
914
962
55
1,985
0.19
North
317242
6738844
5.7
99.2%
99.4%
3,400
38
967
586
42
1,225
0.21
North
318123
6738844
2.2
98.9%
99.1%
4,280
136
700
2,044
130
1,297
0.27
North
315493
6739567
4.9
98.0%
98.4%
9,779
68
3,360
930
71
1,555
0.45
North
314700
6739562
4
98.1%
98.6%
9,009
60
3,275
487
50
1,453
0.46
North
318366
6736337
5.8
99.3%
99.4%
2,598
22
1,100
341
-
1,975
0.14
North
317664
6738162
3.5
98.8%
99.0%
4,736
60
1,025
1,759
113
1,775
0.20
North
317927
6737209
5.3
99.1%
99.3%
3,789
25
1,317
535
41
1,515
0.20
Central
326157
6718810
3.3
98.1%
98.4%
8,810
-
3,450
1,559
123
1,952
0.34
Central
325403
6718806
3.4
97.2%
97.7%
14,180
60
2,975
2,651
166
3,032
0.50
Central
324589
6718807
3.2
96.9%
97.5%
15,915
69
4,400
1,669
109
2,530
0.62
Central
323714
6718801
3.3
98.5%
98.7%
7,060
-
1,275
1,990
114
2,689
0.20
Central
322846
6718798
2.5
97.5%
97.9%
11,968
-
2,133
3,838
233
2,845
0.37
Central
322039
6718796
2.6
94.9%
95.9%
26,846
150
6,400
3,863
224
3,678
0.96
Central
321130
6718788
2.5
97.8%
98.2%
10,158
39
2,167
3,045
171
2,560
0.33
Central
321568
6717779
2.6
97.4%
97.8%
12,295
158
2,367
3,671
267
2,790
0.44
Central
322193
6717752
2.5
97.8%
98.1%
11,416
118
1,767
3,112
236
2,138
0.34
Central
322397
6717622
1.5
98.4%
98.8%
7,835
113
1,050
1,504
143
1,684
0.36
Central
322052
6717186
2
98.1%
98.4%
8,998
115
1,750
2,413
186
2,103
0.34
Central
322559
6716544
3.5
99.1%
99.3%
3,292
30
525
887
73
1,852
0.19
Central
323068
6715908
1
97.0%
97.6%
13,423
213
3,100
3,519
301
2,764
0.65
Central
323573
6715291
2
98.1%
98.5%
8,256
175
1,800
2,232
177
2,181
0.36
Central
324066
6714668
2.8
97.6%
97.9%
11,262
159
2,433
3,414
424
2,715
0.36
Central
324567
6714039
1
97.0%
97.5%
13,527
165
3,400
4,571
316
3,273
0.49
Central
325085
6713406
1.8
97.9%
98.2%
9,557
186
2,750
2,478
395
2,138
0.34
Central
327054
6716735
3.2
98.1%
98.5%
7,544
108
3,300
1,751
220
2,035
0.38
Central
327247
6715910
2.2
98.0%
98.3%
9,072
78
2,333
2,216
170
2,564
0.38
Central
327430
6715126
2.4
98.5%
98.8%
6,044
41
1,233
1,998
180
2,145
0.34
Central
323804
6712148
0.9
96.4%
97.0%
17,820
159
3,700
4,446
318
3,062
0.63
Central
322973
6712124
1
93.7%
94.9%
26,904
267
10,200
6,089
549
4,587
1.19
Central
322207
6712090
2
98.3%
98.7%
6,305
114
2,750
2,289
213
1,601
0.38
Area
SiO2
Further information:
Bruce Maluish
Managing Director
Ventnor Resources
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
Competent Person’s Statement
The information in this release that relates to exploration results and exploration targets is based on,
and fairly represents, information compiled by Mr David Reid who is a Member of the Australian
Institute of Geoscientists (MAIG). Mr Reid is a contractor to Ventnor Resources Limited. Mr Reid has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the “2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves.”
Mr Reid consents to the inclusion in this release of the matters based on information provided by him
and in the form and context in which they appear.
APPENDIX A – JORC 2012 Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
Commentary
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
Auger drilling samples are 1m down hole intervals with sand
collected in a plastic tub which received the full sample, ~8kg,
from the hole. The sand was homogenised prior to sub
sampling, two sub-samples, A and B, of ~200g were taken
from the drill samples. A bulk sample of ~5kg was retained for
each 1m interval for metallurgical testwork.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
The “A” sample was submitted to the Intertek Laboratory in
Maddington, Perth for drying, splitting (if required),
pulverisation in a zircon bowl and a specialised silica sand 4
Acid digest and ICP analysis.
All auger samples were weighed to determine if down hole
collapse was occurring, if the samples weights increased
significantly the hole was terminated to avoid up hole
contamination.
The targeted mineralisation is unconsolidated silica sand
dunes, the sampling techniques are considered to be “industry
standard”.
Due to the visual nature of the material, geological logging of
the drill material is the primary method of identifying
mineralisation.
A 100mm diameter hand screw auger was used to drill until
hole collapse.
All material recovered from the hole is collected in a plastic
tub and weighed, the weights are used to determine when the
hole is collapsing, and drilling is terminated.
Drilling
techniques
Drill sample
recovery
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so,
by what method, etc).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
Criteria
Logging
Sub-sampling
techniques
and sample
preparation
Quality of
assay data and
laboratory
tests
JORC Code explanation
Commentary
representative nature of the samples.
No relationship is evident between sample recovery and grade
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Geological logging of drill samples is done by the field
geologist with samples retained in chip trays for later
interpretation.
Whether logging is qualitative of quantitative in nature. Core
(or costean, channel, etc) photography.
Logging is captured in an excel spreadsheet, validated and
uploaded into an Access database
The total length and percentage of the relevant intersections
logged.
If core, whether cut or sawn and whether quarter, half of all
core taken.
If non-core, whether fiffled, tube-sampled wet or dry.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
Auger drill material, ~8kg, is collected in a plastic tub and
homogenised, 2 x 200g sub-samples, A and B, are taken from
the drill material. The A sample is submitted to the laboratory
and the B sample is retained for repeat analysis and QAQC
purposes. A 5kg bulk sample is retained for later metallurgical
testwork.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
The sample size is considered appropriate for the material
sampled.
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicates/second-half sampling.
The 200g samples are submitted to the Intertek Laboratory in
Maddington, Intertek use a zircon bowl pulveriser to reduce
the particle size to -75um.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their deviations, etc.
Samples were submitted for analysis to the Intertek
Laboratory in Maddington in Perth WA. The assay methods
used by Intertek are as follows: multi-elements are determined
by a specialised four-acid digest including Hydrofluoric, Nitric,
Perchloric and Hydrochloric acids in Teflon tubes. Analysed
by Inductively Coupled Plasma Mass Spectrometry, silica is
reported by difference.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
The assay results have also undergone internal laboratory
QAQC, which includes the analysis of standards, blanks and
Criteria
JORC Code explanation
Commentary
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Verification of
sampling and
assaying
Location of
data points
The verification of significant intersections
independent of alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other location used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
by
either
repeat measurements.
The Company has been validating a high-purity silica standard
that was created for the Company by OREAS Pty Ltd. This
was required as there is no commercial standard available for
high purity silica sand. The standard was “round robin”
assayed at several laboratory’s in Perth prior to the
commencement of drilling.
The standard was then included in the drill sample
submissions to Intertek, in sequence, on a ratio of 1:20. Field
duplicate samples were submitted in a ratio of 1:20 and in
addition to this Intertek routinely duplicated analysis from the
pulverised samples in a ratio of 1:25. The number of QAQC
samples therefore represents ~14% of the total assays.
A full analysis of all the quality control data has been
undertaken. This analysis validates the drill assay dataset and
conforms with the guidelines for reporting under the JORC
2012 code.
Significant intersections validated against geological logging
No twinned holes have been completed.
Drill hole locations were measured by hand-held GPS with the
expected relative accuracy; GDA94 MGA Zone 50 grid
coordinate system is used. The reduced level (RL) of the
drilling collars is generated from publicly available SRTM data.
The SRTM data is compared to the available Landgate
Geodectic Survey Marks to validate the data that it is
appropriate for use.
SRTM topography is known to have localised precision
issues. The Company is investigating cost effective methods
Criteria
JORC Code explanation
Commentary
of acquiring a high-quality topographical data set.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied
Auger holes were spaced 400-1,000m apart along existing
tracks.
Due to the relatively low variability of assays between drill
holes the current spacing is sufficient for the estimation of a
Mineral Resource.
Whether sample compositing has been applied.
No sample compositing (down hole) has been done.
Orientation of
data in relation
to geological
structure
Whether the orientation is sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
Sampling is being done on aeolian sand dunes the auger
orientation is therefore considered appropriate.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample
security
The measures taken to ensure sample security.
All samples are selected onsite under the supervision of
Ventnor Geological staff.
Samples are delivered to the Intertek laboratory in
Maddington. Intertek receipt received samples against the
sample dispatch documents and issued a reconciliation report
for every sample batch.
There has been no audit or review of sampling techniques and
data at this time.
Audits or
reviews
The results of any audits or reviews of sampling techniques
and data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
Type, reference name/number, location and ownership
including agreements of material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
intersects, historical sites, wilderness or national park and
environmental settings.
Commentary
Auger drilling was done on Tenement E70/4987 and E70/5027
which are 100% held by a wholly owned subsidiary of Ventnor
Resources Limited.
The tenements were granted on 06/04/2018 and 13/06/2018
respectively, all drilling was conducted on VCL.
Minor exploration for mineral sands has been completed by
various Companies.
No exploration for silica sand has been done.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
Exploration
done by other
parties
Acknowledgement and appraisal of exploration by other
parties.
Geology
Deposit type, geological setting and style of mineralisation.
The targeted silica sand deposits are the aeolian sand dunes
that overlie the Pleistocene limestones and paleo-coastline
which host the Gingin heavy mineral deposits.
Drill hole
Information
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
A tabulation of the material drill holes is presented in the main
body of this report.
o
Easting and northing of the drill hole collar.
o
Elevation of RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar.
o
Dip and azimuth of the hole.
o
Down hole length and interception depth.
If the exclusion of the information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
Criteria
JORC Code explanation
In reporting exploration results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
The assay data presented for the silica sand is an arithmetic
average of the 1m individual sample results.
Down hole averages have been calculated for the full depth
drilled for all material downhole.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
The grade distribution shows a very low variability with no
anomalous high-grade results, therefore the most appropriate
method of aggregating intercepts is the use a simple arithmetic
average.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
No metal equivalents are used.
Relationship
between
mineralisation
widths and
intercept
len