AGM Presentation
Released
Released
Announcement PDF
VRX SILICA
Silica Sand
Essential to World Growth
AGM November 2024
Important Information
Disclaimer
This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal
presentation and should be read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an investment decision In preparing and providing this
document, VRX has not considered the objectives, investment profile, financial position or needs of any particular recipient Mineral exploration is subject to significant risk. There is no guarantee of
exploration success, and even if exploration success is achieved, there is no guarantee that development of any mineral deposit will be economically viable VRX strongly suggests that investors consult a
financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation To the
maximum extent permitted by law, none of VRX, its related bodies corporate, or their shareholders, directors, officers, employees, contractors, agents or advisors, nor any other person accepts any
liability, including, without limitation, any liability arising out of fault or negligence for any loss arising from the use of information contained in this document.
This document may include “forward looking statements” within the meaning of securities laws of applicable jurisdictions Forward looking statements can generally be identified by the use of the words
“anticipate“, believe”,“ expect”,“ project”,“ forecast”,“ estimate”,“ likely”,“ intend”,“ should”,“ could”,“ may”,“ target”,“ plan”,“ guideline”,“ and other similar expressions Indications of, and guidance on,
revenue models, pricing, earnings and financial position and performance are also forward looking statements.
Such forward looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and other factors, many of which are beyond the
control of VRX, its related bodies corporate, and their directors, officers, employees, contractors, agents and advisors, that may cause actual results to differ materially from those expressed or implied in
such statement. Actual results, performance or achievements may vary materially from any projections and forward looking statements and the assumptions on which those statements are based In
particular, potential revenue opportunities and guideline pricing models set out in this document are based on certain assumptions which may in time prove to be false, inaccurate or incorrect Readers
are cautioned not to place undue reliance on forward looking statements and VRX assumes no obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any jurisdiction, and neither this presentation nor anything
contained in it forms the basis of any contract or commitment. Without limiting the foregoing, this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the
United States The securities of VRX have not been, and will not be, registered under the US Securities Act of 1933 as amended (Securities Act) or the securities laws of any state or other jurisdiction of
the United States, and may not be offered or sold in the United States except in compliance with the registration requirements of the Securities Act and any other applicable securities laws or pursuant
to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act and any other applicable securities laws.
Compliance Statement
The information in this document that relates to the estimation and reporting of the Mineral Resources and Ore Reserves for the Company’s silica sand projects and metallurgical testwork is extracted
from releases to ASX on 28 August 2019 and 11 November 2022 (Arrowsmith North) , 17 September 2019 (Arrowsmith Central), 9 May 2023 (Arrowsmith Brand), 18 October 2019 (Muchea) and 18
August 2022 (Boyatup). The Company confirms that it is not aware of any new information or data that materially affects the information included in this document and all material assumptions and
technical parameters underpinning the estimates continue to apply and have not materially changed.
Silica Sand: The Second-most
Consumed Material on Earth
3
The world is facing a global sand supply crisis
4
World Class Silica Sand Projects
Project development pipeline to ensure disciplined, staged development of worldclass assets
❑ Five very large scale, high grade and low impurity silica sand
projects each project capable of independent operation to
supply processed material to diverse markets
❑ Simple, low impact mining and processing
❑ Access to established infrastructure (logistics, power, water
and gas)
– rail lines to port run adjacent to all project tenements
– gas pipelines run adjacent to each of the project areas
❑ Scale of projects provides long-term opportunity for silica
sand export and potential glass manufacturing and
downstream industries in Western Australia
❑ Grant of geothermal permit in the Mid West and JV with
Steam Resources provides alternative energy solution 5
Market Outlook
Asian glass making production increasing 5-6% per year (~8 - 10Mtpa Growth)
VRX Target Market - Float, Container, Solar Panel, and;
Metal Casting/Foundry for Automobile Parts
Glassmaking silica sand demand by region*
Use
4%
Spec
5%
Float (Plate)
Glass
8%
47%
16%
VRX’s
Target
Market
Market in Growth in
Asia
Asia
99.5% SiO2
60 - 65Mt
5% - 6%
Container Glass 99.5% SiO2
70 - 75Mt
5% - 6%
Cover Glass
(Solar Panels)
99.95% SiO2 &
Low Fe
10 - 12Mt
+30%
Smart Glass
(Ultra Clear)
99.97% SiO2 &
Low Fe
1 - 2Mt
5% - 6%
Specialist Glass
(Thin Screen)
99.97% SiO2
500 - 600kt
+10%
20%
Asia Pacific
Western Europe
Africa/Middle East
North America
Eastern Europe
Central and South America
*Source: Freedonia estimate
6
WA Leading Silica Sand Projects
Arrowsmith North (100%)
• High-grade with exceptional financial metrics
• Close proximity to port and rail infrastructure
• Glass making and foundry products
• Potential +100 year mine life:
- JORC Proved and Probable Reserve of
- 221Mt @ 99.5% SiO2
• Updated BFS completed March 2024
• Environmental and mining approvals expected Q1 2025
• Final offtakes and financing to follow
Muchea (100%)
• Very high-grade product with outstanding financial metrics
Kwinana
Port
• Well located to key port and rail infrastructure
• Specialist solar panel glass products
• Potential +100 year mine life:
- JORC Indicated and Inferred Resource
- 208Mt @ 99.6% SiO2
• BFS completed Oct 2019
7
Exploration
Arrowsmith North Silica Sand Project
Project Site
Vegetation Kwongan Heath
Loose sand/shallow root systems suitable for VDT
8
Arrowsmith North
Near-term development opportunity for a world-class silica sand project
❑ Production expected to commence 8-12 months following final environmental approvals
❑ 221Mt Ore Reserve @99.5% SiO2 (100-year production) (See Reserve Table)
❑ Grade controlled Proved Ore Reserve 9.2Mt for first 6 years of production
❑ Tailored 2Mtpa processing plant with patented process circuit, revised capital estimate
and DFS completed
❑ Access to established infrastructure –
❑ Unused rail line (from Eneabba to Geraldton) runs adjacent to project tenements
❑ Water from Yarragadee North deep aquifer
❑ Access by adjacent Brand Highway
❑ Hybrid gas and solar power supply
9
Updated BFS (March 2024)
Arrowsmith North Updated BFS Results
❑ Demonstrates robust financial metrics for a World-class silica sand project
❑ 221Mt Ore Reserve @99.5% SiO2 (100-year production)
❑ Ungeared NPV10 of $167m based on 25 years mining of a +100 year Resource
❑ Proved and Probable Ore Reserve of 221Mt @ 99.5% SiO2
❑ Four products for international foundry and glassmaking industries
10
Environmental and Mining Approvals
❑ Confirmation by Commonwealth Department of Agriculture, Water and the Environment of
accredited State assessment under the EPBC Act
❑ State Department of Water and Environmental Regulation and Environmental Protection
Authority (EPA) require a PER assessment
❑ Environmental Review Document (ERD) lodged in April 2022 and amended June 2022 and
again February 2023 and published June 2023
❑ ERD Public Environmental Review period ended July 2023 and EPA provided Summary of
Submissions September 2023
❑ VRX lodged initial Response to Submissions (RtS) October 2023 for assessment by EPA
published November 2024 following year-long consultation process with EPA
❑ Mining Proposal and Works Approval assessed and approval subject to EPA
❑ Final environmental and other approvals expected Q1 2025
11
Responsible Mining – the VRX Way
A made-for-purpose mining method designed around continuous rehabilitation
❑ VRX has developed a unique and progressive
mining method for its silica sand projects
❑ The Vegetation Direct Transfer (VDT) method
provides a rapid and comprehensive
regeneration of mined areas based on
continuous rehabilitation as mining progresses
❑ Removes a 400mm-deep sod with topsoil
containing the vast majority of native flora and
invertebrate fauna remaining intact
❑ Root structures in the loose sand are relatively
shallow at 200-300mm in depth
❑ Approval granted for VDT trials at Muchea to test
the practicalities of method in various vegetation
types
❑ Modified loader bucket required for VDT
fabricated and ready for use
12
Environmental Approvals: Changes to Proposal
Original
Revised
❑ Approved amendments since
referral
❑ Mine development envelopes
reduced from >1,000ha to
353ha
❑ Clearing reduced from 412.2ha
to 299.1ha
❑ Relocation of infrastructure to
within the mine area
❑ Redesign of access route and
haulage method (rail to road)
❑ Reduction in onsite power
generation
13
Environmental Approvals: Terrestrial Fauna
Carnaby’s Cockatoo (Endangered)
❑ Clearing 299.1 ha of foraging habitat.
Avoided roosts or breeding sites
❑ Extent of clearing reduced significantly
from original Proposal
❑ Impact is 0.5% of foraging habitat
within 12 km, Cumulative <3%
❑ Access track designed to minimise
vehicle strike risk (speed limited and
shortest, safest route)
14
Environmental Approvals: Social Surroundings
❑ Entire site has been surveyed for
Aboriginal Heritage – no sites found within
current Development Envelope
❑ One registered Aboriginal Heritage site
near the Proposal – Development
Envelope amended to avoid boundary
❑ Arrowsmith Lake avoided – not a
registered Aboriginal Heritage site
❑ VRX to consult with YSRC regarding
monitors during clearing and undertaking
rehabilitation at the Project site and offset
site
❑ Develop a Cultural Heritage Management
Plan in consultation with YSRC
15
Environmental Approvals: Offset Sites
❑ Offsets proposed to counterbalance the
medium-term loss of 299.1 ha of
Carnaby’s Cockatoo (CC) foraging habitat
❑ Two vegetated lots proposed
❑ Contain 958.2 ha of Excellent quality CC
foraging habitat
❑ Area to be revegetated within previously
cleared portion
❑ Provides connectivity to conservation
estate and native vegetation
16
Environmental Approvals:
Avoidance and Minimisation of Impacts
❑ Reduce Development Envelopes from to avoid
Priority Flora and Aboriginal Heritage site
❑ Reduced impact to Carnaby’s Cockatoo foraging
habitat
❑ “Gold Standard” VDT rehabilitation method
proposed – slow, progressive clearing and direct
replacement of topsoil sods
❑ Area fully surveyed (10 m spacing) for Sandplain
Duck-orchid – no records found
❑ Weed and dieback hygiene controls
❑ All mining above water table
❑ No chemical processing
17
Environmental Approvals:
Priority Flora
❑ 7 species recorded within Development Envelope, of
which 5 will have >5% local records disturbed
❑ Development Envelope revised to keep impacts to
local records <21%
❑ Proposal impacts to regional records all <6.1%
❑ Cumulative losses of all species <8% other than
Comesperma rhadinocarpum (P3) – 17.6%
❑ Only 10 Comesperma rhadinocarpum individuals to
be disturbed
❑ 16 other recorded populations – no counts available
therefore percentage loss is conservative (assumed 1
individual per record)
18
Muchea Silica Sand Project Site
Vegetation: Banksia Woodland
Low grasses and sedges suitable for VDT
VRX Silica
19
Muchea
Large scale, world class high-grade and low impurity silica sand project
❑Production to follow Arrowsmith North subject to EPA approval
❑Utilise VDT and duplicate plant
❑Access to established infrastructure
❑Underutilised railway connects to Kwinana (100km)
❑Grid power
❑Water from Yaragadee deep aquifer
❑Adjacent to Brand Highway
❑Granted Mining Lease and Miscellaneous Licences for access
❑Significant metallurgical testwork +99.9% SiO2 - <100ppm Fe2O3 after processing (highgrade, low impurity)
20
Muchea
Downstream processing capabilities
❑Critical Minerals Prospectus – VRX Muchea project is included in the 2024 Critical
Minerals Prospectus published by Austrade (now online)
❑Raw material for premium ultra-clear cover glass production for solar panels
❑Potential for production of solar panels in Western Australia
❑Potential for production of silica flour for LCDs and other applications
❑IAF Grant - VRX has received a grant from the Western Australian Innovation Attraction
Fund to investigate the production of silica flour:
❑1 tonne sample successfully tested by specialist laboratory in Germany
❑Samples despatched to potential buyers
❑Significant interest in products capable of production
21
Processing Flowsheet
Simplified wet processing, multiple products, no dust, 2mtpa processing plant at each site
Processing Plant Design
▪ Arrowsmith North, Arrowsmith
Central and Muchea to each have
2 Mtpa processing capacity
▪ No toxic reagents required
22
Processing Plant Design
No dust
No toxic chemicals
Sustainability, Environment,
Social and Governance (ESG)
VRX is delivering on its ESG responsibilities aligned to the UN’s Sustainable Development Goals
CLEAN ENERGY
ECONOMIC
GROWTH
INDUSTRY
INNOVATION
SUSTAINABLE
COMMUNITIES
RESPONSIBLE
PRODUCTION
CLIMATE
ACTION
REHABILITATION
PLAN
Utilising reliable,
renewable
modern energy
Enhancing
economic and
productive
employment
Building
resilient
infrastructure
and fostering
innovation
Respecting
heritage values
Employing
sustainable
mining
methods
Reducing
emissions from
production
Employing direct
vegetation
transfer as
a unique
rehabilitation
method
24
Corporate Summary
Capital Structure
Share Price
A$0.054*
Ordinary Shares on Issue
628 million
Options on Issue
92 million
Market Capitalisation
A$34 million*
Cash
A$1.8 million**
Debt
Nil
Enterprise Value
A$32.2 million
Shareholders
Board and Management
12%
Top 20 Total
33%
* Closing share price on ASX on 28 November 2024
** Cash at 31 September 2024
25
Our Team
Executive
Board
Person
Role
Experience
Chairman
Governance: over 30 years’
experience in investment, equity
markets and managing public
companies
Bruce
Maluish
Managing
Director
Technical and finance: over 40 years’
experience in mining industry
including previous roles as ASX MD
and General Manager
Peter
Pawlowitsch
NonExecutive
Director
Senior executive: finance and
corporate roles
David Welch
NonExecutive
Director
Senior executive: responsible for
strategy, business transformation and
performance, commercial
negotiations
Paul
Boyatzis
Person
Role
Experience
Ryan Baxter
General
Manager
Production: 15 years’ experience
in mining and construction with
10 years exporting silica sand
David Reid
Exploration
Manager
Technical: responsible for
exploration and mineral
processing
Steven
Papadopoulos
Commercial
Manager
Legal and commercial: over 25
years’ experience as corporate
lawyer and commercial advisor
in resources and other industries
Yoonil Kim
Marketing
Manager
Marketing: 19 years’ experience
selling silica sand in the Asian
market
26
Right Time, Right Place
Opportunity for WA to capture its economic advantages of abundant silica sand
and domestic gas reserves to build world-class glass manufacturing and
downstream processing industries
❑ Very long life, high-grade silica sand supply with combined 1.4 billion tonne
Resource, 96% to 99.6% SiO2 grade
❑ Arrowsmith North environmental and other approvals expected Q1 2025
❑ WA domestic gas reserves and burgeoning hydrogen projects in mid-west, with
exposure to geothermal energy solutions
❑ Long term supply of essential raw materials and potential green energy for glass
manufacturing (LNG gas/wind/solar/hydrogen)
❑ High-tech ultra-clear glass and HPQ production capability from Muchea
❑ Manufacturing of solar panels in WA for a huge and growing market in Australasia
27
Thank you
Bruce Maluish
Managing Director
Ground Floor, 52 Kings Park Road
West Perth WA 6005
Phone: 08 9226 3780
Email: info@vrxsilica.com.au
Silica Sand Resources and Reserves
Mineral Resources - as at 30/06/2024
Project
Classification
Indicated
Muchea
Inferred
Total
Measured
Arrowsmith
Indicated
North
Inferred
Total
Arrowsmith
Inferred
Brand
Total
Indicated
Arrowsmith
Inferred
Central
Total
Inferred
Boyatup
Total
Total Mineral Resource
Mt
SiO₂
%
Al₂O₃
%
29
99.6
0.1
179
99.6
0.1
208
99.6
0.1
10
95.9
1.9
237
97.7
1.0
266
98.4
0.7
513
98.0
0.9
523
97.3
1.4
523
97.3
1.4
28.2
96.6
1.7
48.3
96.9
1.5
76.5
96.8
1.5
60
97.8
0.8
60
97.8
0.8
1,381 Million Tonnes
Ore Reserves - as at 30/06/2024
Fe₂O₃ %
TiO₂
%
LOI
%
0.03
0.02
0.02
0.7
0.4
0.3
0.3
0.4
0.4
0.4
0.4
0.4
0.2
0.2
0.1
0.1
0.1
0.3
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.2
0.2
0.2
0.7
0.5
0.4
0.4
0.6
0.6
0.7
0.7
0.7
0.9
0.9
Project
Classification
Product
Mt
SiO2
%
Al2O3 Fe2O3
%
%
F80
10.2
99.9
0.02 0.008
Muchea
Probable
F80C
4.25
F150
4.25
99.8
0.07 0.015
Muchea Ore Reserve
18.7 Million Tonnes
AFS20
0.8
99.5
0.25
0.07
AFS35
3.9
99.5
0.5
0.06
Proved
AFS55
2.7
99.2
0.5
0.1
Local
1.8
Arrowsmith
Proved Ore Reserve
9.2 Million Tonnes
North
AFS20
24.2
99.5
0.25
0.07
AFS35
102.5 99.5
0.5
0.06
Probable
AFS55
51.1
99.2
0.5
0.1
Local
34.1
Probable Ore Reserve
212 Million Tonnes
Arrowsmith North Ore Reserve
221 Million Tonnes
CF400
4.2
99.6
0.25
0.04
C20
8.4
Arrowsmith
Probable
C40
4.2
Central
High TiO2
2.2
<1%
Arrowsmith Central Ore Reserve
18.9 Million Tonnes
Total Ore Reserve 259 Million Tonnes
TiO2
%
LOI
%
0.03
0.1
0.035
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.03
0.1
2%
29