Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
28 January 2022
ASX ANNOUNCEMENT
December 2021 Quarterly Activity Report
The following is a summary of the activities conducted by
VRX Silica Limited (VRX or Company) during the
December 2021 quarter at its silica sand projects at
Arrowsmith North, Arrowsmith Central (located 270 km
north of Perth) and at Muchea (located 50 km from Perth),
all situated in Western Australia.
ASX: VRX
Capital Structure
Shares on Issue:
558.4 million
Unlisted Options:
35.3 million
VRX Silica Sand Resources
Corporate Directory
VRX is a Western Australian based pure-play silica sand
exploration company with three high-value, advanced,
very long-term silica sand projects in Western Australia, a
Tier 1 mining region.
The Company has multi-decade scale contiguous sand
deposits on granted Mining Leases with secure tenure and
a combined +1bn tonne Mineral Resource of 99.6% to
99.9% SiO2 grade silica sand.
The Company and its management team is WA based as
are its three large scale, high-grade and low impurity silica
sand projects. Each project can be run independently and
supply high grade silica sand to many diverse markets.
Applications of Silica Sand
Paul Boyatzis
Non-Executive
Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north
of Perth, WA.
Silica sand is the most-used commodity on the planet after
air and water. It is the main ingredient in all types of
glassmaking, including specialty solar panel and hightech glass. The glass manufacturing industry demand is
increasing at a rate of 5-6% per year, or about 8-10 million
tonnes pa. Around 47% of the world’s glass is made in
Asia.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Silica sand is also the main ingredient in concrete.
The Company is actively
assessing other silica
sand projects in
Australia.
Silica sand is a finite resource that is rapidly being
exhausted and the Asia-Pacific region is currently
experiencing increasing demand at a time of a global
supply shortfall.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
A Project development pipeline to ensure a disciplined, staged development of
world-class assets
The Arrowsmith North silica sand project will lead a staggered and disciplined
development program with first production expected in 2022, followed by Muchea and
Arrowsmith Central.
VRX has the most-advanced ASX listed company silica sand projects in Australia with
planning, Aboriginal heritage and environmental studies having commenced in 2017.
Mining Leases are granted over all three projects as well as various Miscellaneous
Licences for access with permitting and infrastructure preparations well-advanced.
The scale of the projects provides for a long-term opportunity for silica sand export
and potential for glass manufacturing and downstream industries in Western
Australia.
Arrowsmith North - Near-term development opportunity on a world-class silica
sand project
The mining and processing operation is relatively simple and low impact with longterm production expected to commence initially at Arrowsmith North on the 223Mt Ore
Reserve @ 99.7% SiO2 in 2022, subject to final environmental approvals.
A revised capital estimate is currently underway on a tailored 2Mtpa processing plant
with a unique patented process circuit.
Process circuit design and detailed engineering has been designed following an
extensive metallurgical testing regime. Further bulk testwork programs commenced
during the December 2021 quarter continue to refine the operating parameters and
provide final product samples to an extensive list of potential buyers. Large samples
(50-60kg) are required for glassmaking furnace testing and foundry resin coating
testing. The samples have been requested by potential buyers following previous
successful testwork on smaller (1-5kg) samples.
Geotechnical surveys were completed during the December 2021 quarter for the plant
site.
In addition, a process water bore was successfully drilled to access water from the
Yarragadee North deep aquifer and currently aquifer testing is underway to supply
data for an abstraction licence application for 0.9Gl of water.
Gas pipelines run adjacent to each of the project areas and it is planned for the plant
in the medium to long term to run on a hybrid gas and solar power supply following a
tender process for power supply contractors.
Arrowsmith North has access to established infrastructure such as the unused rail line
(from Eneabba to Geraldton) which runs adjacent to the Arrowsmith project
tenements. A joint co-operation agreement with Mid West Ports Authority (for export
of silica sand product from Geraldton Port) has been signed and collaboration has
commenced with Arc Infrastructure for a dedicated train unloader at the Geraldton
Port. The Company has access to the adjacent Brand Highway and during the quarter
a road intersection plan was submitted to Main Roads to enable road transport of silica
sand product in the short term.
Vegetation Direct Transfer
VRX has developed a unique and progressive mining and rehabilitation method for its
silica sand projects. The Vegetation Direct Transfer (VDT) method provides rapid and
comprehensive regeneration of mined areas based on continuous rehabilitation as
mining progresses. The VDT method is a made-for-purpose mining method which
removes and replaces a 400mm-deep sod with topsoil to the mined area containing
the vast majority of native flora and invertebrate fauna remaining intact.
At the VRX selected mine areas, the root structures in the loose sand are relatively
shallow at 200-300mm in depth and ideally suited for the VDT system. The method
has been developed to provide the best rehabilitation outcome for the recalcitrant
sedges and grass species.
The VDT methodology can be viewed at:
https://vrxsilica.com.au/miningandrehabilitationmethodology/
QA/QC Metallurgical Testwork
Extensive metallurgical testwork has been undertaken by sand processing specialists
BHM Process Consultants to ensure throughput and quality can be maintained. This
has resulted in the development and successful testing at lab scale of a new and uniqu
process circuit incorporating flotation.
During the December 2021 quarter, an Australian patent for the process, was lodged
by BHM that will protect the unique intellectual property for the benefit of VRX to utilise
and share in future licensing. Flotation will replace spirals and screening by upstream
classifying, which is intended to not only reduce capex and operating costs but also
produce a more consistent high grade marketable product.
The flotation reagents are organic and rapidly oxidise once used, presenting no
environmental issues.
Bulk pilot plant scale testing is currently underway and will supply further large
samples to potential buyers. Testing to date with sample sizes referred to above has
resulted in an Arrowsmith North product of 99.7% SiO2 with Fe2O3 <500ppm after
processing and a preliminary Muchea product of 99.9% SiO2 with Fe2O3 <100ppm
after processing (high-grade).
The Company’s goal is to provide for consistent QA/QC production and extend the
silica sand resources that can be processed consistently for sale.
The Approvals Progress
Arrowsmith North
VRX has received confirmation from the Commonwealth Department of Agriculture,
Water and the Environment (DWER) for accredited approval under the Environment
Protection and Biodiversity Conservation Act 1999 (EPBC Act). Accreditation of the
Environmental Protection Authority’s (EPA) assessment processes means that the
Commonwealth can rely on environmental assessments undertaken by the EPA for
the purpose of its approval decisions under the EPBC Act on proposals that are likely
to have a significant impact on a matter of national environmental significance. If the
EPA assesses a proposal at the level of PER under the agreement, separate
assessment by the Commonwealth is not required.
The Proposal was referred to EPA services on 17 March 2021 for assessment under
Part IV of the Environmental Protection Act 1986 (EP Act).
On 24 May 2021 it was determined that the Proposal should be assessed at a Public
Environmental Review level of assessment and, as a result, an Environmental Scoping
Document (ESD) was to be submitted to the EPA for assessment. A draft ESD was
prepared and submitted to DWER for assessment on 29 June 2021.
During the December 2021 quarter, the EPA’s guidance for the preparation of ESDs
was amended and the Company was requested by DWER to amend and re-submit
the draft ESD in line with the new guidance. VRX prepared and submitted an amended
draft on 13 December 2021.
Subsequent to the end of the quarter, additional comments by the EPA on the
amended draft ESD were received, and on 18 January 2022 these were addressed
by the Company.
The ESD requires the approval of the EPA Board before the approval process
proceeds. The Company understands the Board is scheduled to meet and consider
the ESD in late February 2022.
A significant number of studies have already been completed:
✓ Desktop, recce and detailed flora and vegetation surveys
✓ Desktop, basic, detailed and targeted fauna surveys
✓ Short Range Endemic species desktop and field assessment
✓ Terrestrial Environmental Quality
✓ Dieback field and follow up assessment
✓ Surface Water Drainage assessment
✓ Groundwater Hydrology
✓ Acid Mine Drainage
✓ Social Surrounds and Archaeological and Ethnographic Heritage survey
✓ Cultural Values and Heritage assessment
✓ Greenhouse Gas Emissions estimation
✓ Air Quality assessment
✓ Permit for Construction of Water Bore
Key assessment milestones to be completed
❑ EPA approves ESD
❑ Mining Scope to DMIRS
❑ EPA publishes ESD
❑ Submission of draft ERD
❑ EPA accepts ERD and authorises release of ERD for 4 week public
review (assumes no further revisions required)
❑ EPA provides summary of submissions to proponent
❑ Submit response to submissions to EPA
❑ EPA reviews response to submissions
❑ EPA accepts and publishes proponent’s response to submissions
❑ EPA finalises assessment report (including consultation on draft
conditions) and sends recommendation to Minister
❑ Mining Proposal to DMIRS
There will be no further direction on any future survey requirements or timing until the
ESD is approved by the EPA.
During the December 2021 quarter, the mining proposal for the Department of Mines,
Industry Regulation and Safety (DMIRS) was drafted with formal lodgement subject to
the receipt of EPA approval for the ESD. An initial project scope document has been
prepared and will be discussed with DMIRS prior to the lodgement of the proposal.
Arrowsmith Central
VRX has referred a proposal for the Arrowsmith Central silica sand project to DAWE
for assessment under the EPBC Act. During the December 2021 quarter, VRX was
advised by DAWE it has determined that the Proposal is a Controlled Action and the
statutory assessment approach timeframe will await a decision by the WA Government
to determine whether an accredited assessment is an appropriate method.
The Arrowsmith Central Proposal was referred to the EPA under s. 38 of the EP Act
on 10 September 2021. A notice for further information under s. 38F (1) and (2) of the
EP Act was then received on 8 December 2021.
VRX has requested and had approved an extension of time to the end of February
2022 to supply the information requested to incorporate the additional material from
the September 2021 detailed flora and vegetation study at Arrowsmith Central. The
study results are expected early February 2022.
Offtake
During the December 2021 quarter, the Company entered into an initial offtake term
sheet for the supply of Arrowsmith North foundry sand products to the South Korean
foundry industry, with strong interest from other potential customers in SE Asia at a
time of diminishing global supply and increasing demand. This was announced to
ASX on 10 November 2021.
The customers, prominent South Korean foundry sand suppliers and users, Dong A
Heung Eop Mining Co. Ltd (Dong A) and Dong Nam Corporation (Dong Nam) supply
casting and silica sand to Kia, Hyundai, Daewoo and Samsung Renault. This is a first
for VRX and Australia as it is the first and only supply contract for foundry sand from
Australia to South Korea.
The term sheet, which is non-binding and conditional on project approvals, sets out
the terms and conditions for a FOB silica sand supply contract from Geraldton Port,
as well as product specifications, quality control and variation limits, term and quantity
determination, sampling and analysis procedures, dispute resolution, FOB (INCO
2020) terms and required documentation and Letter of Credit payment terms.
The final purchase price is to be determined once the delivery date can be committed.
Muchea - Large scale, world class high-grade silica sand project
Development of the Muchea silica sand project will follow once production has
commenced at Arrowsmith North.
Muchea will have access to established infrastructure such as grid power, adjacent to
the Brand Highway and the underutilised railway which connects to the Kwinana Port
(approx. 100km).
Gas pipelines run adjacent to the Muchea silica sand project and water will be
accessed from the Yaragadee deep aquifer.
As the plant will be identical to that at Arrowsmith North, it will also utilise the patent
pending process with the flotation process and upstream classifying.
This is intended to not only reduce capex and operating costs but also produce a more
consistently high-grade marketable product. Testing to-date at lab scale 20-40kg
samples, has resulted in 99.9% SiO2 with Fe2O3 <100ppm after processing (highgrade).
The Company has had regular overseas enquiries for Muchea silica sand and believes
that the consistent production of such high-grade silica sand with a low iron content
will be in high demand as raw material for the manufacture of premium ultra-clear
cover glass production, particularly for the burgeoning solar panel manufacturing
industry. This interest continued throughout the December 2021 quarter.
The Solar Panel Industry
To meet 2050 greenhouse gas targets the world requires +400GW of solar installation
per year. A record 140GW was installed in 2020. The majority of solar panels are
manufactured in China and the top 10 producers of “cover glass” for solar panels are
all Chinese companies.
Australian Solar Panel Installation
Solar panel installation in Australia is a fast-growing industry. As of September 2021,
Australia’s 2.96 million solar PV installations had a combined capacity of 23.46GW. In
the preceding 12 months 4.12GW were installed in Australia.
Australia has the highest per capita solar capacity at 600W per capita and solar power
accounted for 9.9% of Australia’s total energy production in 2020.
The installed solar capacity quadrupled between 2011 and 2016 and the price of
photovoltaic power is steadily decreasing.
Potential for manufacturing cover glass from adjacent gas/hydrogen pipeline
VRX believes it is the right time and Muchea is the right place for WA to maximise its
economic advantages of a very long-life high-grade silica sand supply and WA
domestic gas reserves, together with rapidly developing hydrogen projects in the MidWest, for a high-tech ultra-clear glass production capability at Muchea.
During the December 2021 quarter, VRX continued its consultation with the WA State
Government to attract foreign and local investment into the development of world-class
glass manufacturing and downstream processing industries in Western Australia.
Environmental, Social and Governance - ESG
VRX is delivering on its ESG responsibilities aligned to the UN’s Sustainable
Development Goals and published its maiden report in the 2021 Annual Report.
Corporate
During the quarter 5.5 million unlisted options were exercised for a total of $617,000
and 11,250,000 unlisted options expired unexercised.
ASX Listing Rule 5.3 disclosures
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $142,000 related
mainly to tenement rents and rates.
Payments for exploration & evaluation under investing activities of $807,000 consists
mainly of processing plant engineering design and related metallurgical test work and
environmental surveys and approvals costs.
There were no substantive mining production and development activities during the
quarter.
Details of tenement activities:
During the quarter, the following tenements were granted:
None
During the quarter, the following tenements were applied for:
General Purpose Lease G70/264
General Purpose Lease G70/265
General Purpose Lease G70/266
Details of related party payments:
The aggregate amount of payments to related parties and their associates of
$121,000 shown at paragraph 6.1 of the attached Appendix 5B represents directors’
fees and salaries paid during the quarter.
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $142,000 related
mainly to tenement rents and rates.
Payments for exploration & evaluation under investing activities of $807,000 consists
mainly of processing plant engineering design and related metallurgical test work and
environmental surveys and approvals costs.
There were no substantive mining production and development activities during the
quarter.
Details of tenement activities:
During the quarter, the following tenements were granted:
None
During the quarter, the following tenements were applied for:
General Purpose Lease G70/264
General Purpose Lease G70/265
General Purpose Lease G70/266
Details of related party payments:
The aggregate amount of payments to related parties and their associates of $121,000
shown at paragraph 6.1 of the attached Appendix 5B represents directors’ fees and
salaries paid during the quarter.
----------------------The information in this document that relates to the estimation and reporting of the
Mineral Resource and Ore Reserves for the Arrowsmith North, Arrowsmith Central and
Muchea Silica Sand Projects is extracted from releases to ASX on 28 August 2019,
17 September 2019 and 18 October 2019, respectively. The Company confirms that it
is not aware of any new information or data that materially affects the information
included in this document and all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed.
This report has been authorised for release to ASX by the Board of Directors.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 540
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica Sand
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
E70/5817
M/1389
M/1392
L70/198
L70/199
L70/202
L70/203
L70/208
L70/230
L70/229
G70/264
G70/265
G70/266
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Application
Application
Application
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
100%
100%
100%
100%
100%
-
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
100%
100%100%-
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
Muchea Project – Silica Sand
Tenement
Status
E70/4886
E70/5157
E70/5548
E70/5651
M/1390
L70/200
L70/204
L70/205
L70/206
Granted
Granted
Granted
Application
Granted
Granted
Granted
Application
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
Boyatup Project – Silica Sand
Tenement
Status
E69/3560
E69/3668
Granted
Granted
Interest at
beginning of
quarter
100%
100%
About VRX Silica
VRX Silica Ltd (ASX: VRX) is developing world-class, high-grade silica sand projects in Western Australia.
The Arrowsmith North and Arrowsmith Central Silica Sand Projects, 270km north of Perth, comprise five granted
exploration licences and two granted mining leases. Bankable feasibility studies for both projects have demonstrated
exceptional financial metrics.
The Muchea Silica Sand Project, 50km north of Perth, comprises two granted and one under-application exploration
licences as well as one granted mining lease. Muchea is a world-class project with high-purity silica sand in situ. A
bankable feasibility study has demonstrated outstanding financial metrics.
The Boyatup Silica Sand Project, 100km east of Esperance, comprises two adjacent granted exploration licences.
Initial indications are that this project can complement the Arrowsmith and Muchea projects and add to the range of
silica products VRX Silica may be capable of producing.
Proven Management
VRX Silica’s Board and Leadership Team have extensive experience in mineral exploration and mine developmentto-production and in the management of publicly listed mining and exploration companies.
Silica Sand Projects Locations
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VRX SILICA LTD
Quarter ended (“current quarter”)
ABN
59 142 014 873
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 December 2021
Year to date
(6 months)
$A’000
Current quarter
$A’000
-
-
(142)
(160)
(b) development
-
-
(c) production
-
-
(d) staff costs
(170)
(350)
(e) administration and corporate costs
(563)
(954)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
4
9
1.5
Interest and other costs of finance paid (on
lease liability)
(2)
(5)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(873)
(1,460)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(81)
(103)
(d) exploration & evaluation
(807)
(1,468)
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Year to date
(6 months)
$A’000
Current quarter
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(888)
(1,571)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
-
-
617
4,438
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liability)
(17)
(33)
3.10
Net cash from / (used in) financing
activities
600
4,405
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
12,977
10,442
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(873)
(1,460)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(888)
(1,571)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
600
4,405
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Year to date
(6 months)
$A’000
Current quarter
$A’000
-
-
11,816
11,816
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
6,805
7,970
5.2
Call deposits
5,011
5,007
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
11,816
12,977
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
121
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(873)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(807)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,680)
8.4
Cash and cash equivalents at quarter end (item 4.6)
11,816
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
11,816
7
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Not applicable
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Not applicable
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Not applicable
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
........27 January 2022................................................................
Authorised by: ..........The Board....................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this r
Share your feedback
Discover