Acquisition of Boyatup Project
Released
Released
Announcement PDF
4 February 2019
ASX ANNOUNCEMENT
Acquisition of Boyatup Silica Sand Project
Highlights:
ASX: VRX
Capital Structure
Company acquires 100% ownership of Boyatup Silica
Sand Project
Shares on Issue:
365 million
Boyatup complements the Company’s substantial holdings
at Muchea and the Arrowsmith Silica Sand Project
Unlisted Options:
63 million
Boyatup will provide an addition to potential products and
buyers
VRX Silica Limited (VRX Silica or Company) (ASX: VRX) is
pleased to announce the Company has completed an agreement
with Silatec Pty Ltd (the vendors) for the acquisition of the Boyatup
Silica Sand Project (Boyatup) located on E69/3560 which has a total
area of 105.7 km².
VRX Silica will issue two million of the Company’s ordinary fully paid
shares plus $10,000 in full consideration for the acquisition of
Boyatup which consists of a single tenement, E69/3560.
The project is located 100km east of the port town of Esperance,
(Figure 1. below) and is connected to the Esperance Bulk Port via a
sealed road which by-passes the city of Esperance.
“The Boyatup deposit is subtlety different to the Company’s
Arrowsmith and Muchea Silica Sand Projects and can provide yet
another option in the product range that the Company can market in
Asia”, said Managing Director Bruce Maluish.
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
John Geary
Company Secretary
Company Projects
Arrowsmith Silica Sands
Project, 270km north of
Perth, WA.
Muchea Silica Sand Project,
50km north of Perth, WA.
The Company will conduct a first pass drill program following an
Aboriginal Heritage study on the granted PoW drill sites. The drill
program will also provide adequate sample for a preliminary
testwork program to determine the final sand quality, a preferred
process circuit design and supply potential product samples to be
forwarded to interested buyers.
Biranup base metals and
gold Project adjacent to the
Tropicana Gold Mine, WA,
(subject to option with
MCT).
The Company, and its International Marketing Manager have now
compiled a significant number of potential buyers for glass making
and foundry industry raw materials.
The Company is actively
assessing other silica sand
projects in Australia.
Warrawanda Nickel Project
south of Newman, WA.
Figure 1. Boyatup Location
The tenement is almost totally covered by vacant crown land (VCL), only a very small
section is over farming freehold land which is of no interest.
The Esperance Deep Water Bulk Port has been the exit port for bulk nickel and iron ore
commodities and can load ships of up to 200,000 tonnes.
During a Due Diligence site visit in September 2018 VRX Silica personnel noted the similarity
to the Company’s Arrowsmith and Muchea experience in that the vegetation is low banksia
heath, (Figure 2. below), and shows pervasive sand coverage over a possible laterite layer.
Figure 2. Project Vegetation
Currently access is limited however a 4.5m hand auger hole was sampled each metre down
hole which showed the sand to be fine and pale yellow, with some laterite layers and ended in
a stronger laterite layer (see Figure 3. below).
Figure 3. Hand Auger Sand
The vendor sampled about 1.4km south of the VRX Silica. The two samples returned very
different results, (see Table below) in both grade and particle size. The vendor sample was a
cleaner sand, white in appearance and very fine, and 6.2% was sized between 0.100 mm to
0.300mm and evenly distributed. This sample demonstrates the variability of the sand
distribution in the project area.
The Company has only a preliminary understanding of the geology at Boyatup from historic
data but earlier work indicates the origins of the sand as being distinctly aeolian in certain
parts of the tenement and sub-marine in other parts.
VRX Sample
East
North
ELEMENTS
MGA Z51
511839
MGA Z51
6269765
UNITS
0-1
1-2
2-3
3-4
4 - 4.5
ELEMENTS
Sieve Size
+1180um
+850um
+600um
+425um
+300um
+212um
+150um
+106um
+75um
+53um
-53um
Al2O3
CaO
Fe2O3 K2O MgO Na2O
TiO2
LOI1000 SiO2 Calc.
ppm ppm
8,705
114
5,069
X
3,034
X
4,340
X
41,048 196
ppm ppm ppm
2,652 373 207
1,678 309 156
1,287 252 116
1,517 296 158
7,458 1,184 940
ppm
142
119
105
113
460
ppm
1,306
1,213
1,238
1,258
2,663
%
0.51
0.38
0.16
0.23
1.89
Size
Al2O3
Fe2O3 K2O MgO Na2O
TiO2
LOI1000 SiO2 Calc.
%
4%
1%
2%
2%
5%
54%
3%
6%
3%
2%
19%
ppm ppm
38,569 309
11,334 346
10,911 185
3,119
139
1,804
X
3,786
106
2,776
114
3,050
105
3,525
142
7,593
282
11,132 267
ppm ppm ppm
15,706 883 664
6,168 318 471
4,275 323 305
1,295 173 166
704
104
90
1,325 178
99
1,154 119 139
1,180 140
86
1,590 222 174
2,830 981 313
4,062 696 262
ppm
416
394
246
192
133
103
141
130
194
536
224
ppm
2,316
1,245
1,135
718
586
1,037
815
1,059
2,833
5,739
1,709
%
2.94
1.3
0.83
0.31
0.23
0.26
0.27
0.18
0.39
0.52
0.78
Size
Al2O3
CaO
Fe2O3 K2O MgO Na2O
TiO2
LOI1000 SiO2 Calc.
%
ppm
1,478
668
928
1,115
2,185
ppm
<100
<100
<100
<100
136
ppm
339
150
180
209
398
ppm
886
457
567
657
1,660
ppm
0.20
0.13
0.12
0.15
0.35
CaO
%
98.13
98.76
99.23
99.00
92.70
%
91.15
96.66
97.43
99.11
99.43
99.07
99.20
99.24
98.74
97.64
97.38
SiO2 Calc.
+LOI
%
98.64
99.14
99.39
99.23
94.59
SiO2 Calc.
+LOI
%
94.09
97.96
98.26
99.42
99.66
99.33
99.47
99.42
99.13
98.16
98.16
Vendor Sample
East
North
MGA Z51
510768
MGA Z51
6268804
Sizing
RAW
300 to 210um
+150um
+100um
+75um
13.6
28.6
34.0
12,2
ppm ppm
247
55
<40
55
46
45
74
65
331 113
ppm
103
<40
<40
46
126
%
99.49
99.74
99.70
99.63
99.15
SiO2 Calc.
+LOI
99.69
99.87
99.82
99.78
99.50
A PoW has been approved for a drill program. The program will test 4,900Ha area in the
centre of the tenement using 113 x 10m deep aircore holes on a 1km x 400m pattern. It is
designed to ascertain a view of the sand coverage, and gain sample for bulk testwork. Initial
spacing will be 1km x 800m which will be adequate for an Inferred Resource and get enough
sample for testwork.
Native Title
The Project comes under the Esperance Nyungar Government ILUA W12014/006 which is
represented by the Goldfields Land and Sea Council. The tenement holders Silatec have
signed a standard heritage agreement with the Claimant Group. Conditions are similar to
other Company agreements.
Competent Persons Statements
The information in this Report that relates to Arrowsmith Exploration Results is based on
data collected under the supervision of Mr David Reid, in his capacity as Exploration
Manager. Mr Reid, BSc (Geology), is a registered member of the Australian Institute of
Geoscientists and has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and the activity being undertaken to qualify as a
Competent Person under the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Reid consents to the
inclusion of the data in the form and context in which it appears.
For silica sand enquiries contact Mr Yoonil Kim:
Manager International Sales
yoonilk@vrxsilica.com.au
+60 17 687 8238
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
About VRX Silica
VRX Silica Ltd (VRX Silica) (ASX: VRX) has significant silica sand projects with four granted
exploration licences and one application pending over the Arrowsmith Silica Sand Project, located
270km north of Perth, Western Australia, and one granted exploration licence and one application
pending over the Muchea Silica Sand Project, 50km north of Perth, which complements Arrowsmith
with additional significant silica sand resources. Initial testwork has confirmed that the silica sand at
both Projects can be upgraded to glassmaking quality. Further work is underway on both projects to
enable feasibility studies to be completed.
The Boyatup Silica Sand Project will add to the silica products the Company will produce.
VRX Silica also has granted tenements at its Biranup Project, adjacent to the Tropicana Gold Mine in
Western Australia’s Goldfields that are prospective for gold and base metals, which are currently under
option for partial sale and farm-in joint venture.
Also, in Western Australia, 40km south of Newman, is VRX Silica’s Warrawanda Nickel Project, which
is prospective for nickel sulphides.
Proven Management
The VRX Silica Board and management team have extensive experience in mineral exploration and
mine development into production and in the management of publicly listed mining and exploration
companies.
Project Locations
APPENDIX 1 – JORC 2012 Table 1
Section 1: Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
VRX Silica - Auger drill samples are 1m down hole intervals with sand
collected in a calico bag with a ~200g sub-sample submitted to the Intertek
Laboratory in Maddington, Perth for drying, splitting (if required),
pulverisation in a zircon bowl and a specialised silica sand 4 Acid digest
and ICP analysis. A composite was generated for particle size distribution
analysis.
Silatec – The Vendor took a single sample of ~3kg taken with a post hole
auger and submitted to the Intertek Laboratory in Maddington, Perth for
drying, splitting (if required), pulverisation in a zircon bowl and a
specialised silica sand 4 Acid digest and ICP analysis. A particle size
distribution analysis was also completed.
The targeted mineralisation is unconsolidated silica sand dunes, the
sampling techniques are “industry standard”.
Due to the visual nature of the material, geological logging of the drill
material is the primary method of identifying mineralisation.
A 100mm diameter screw auger was used.
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Quality of
analytical
data and
laboratory
tests
Verification of
sampling and
analyses
Location of
data points
Data spacing
and
All material recovered from the hole is collected.
No relationship is evident between sample recovery and grade.
Geological logging of drill samples is done by the field geologist.
VRX Silica - Auger drill material is collected in calico bag with a ~200g
sub-sample submitted to the laboratory.
The sample size is considered appropriate for the material sampled.
The 200g samples are submitted to the Intertek Laboratory in Maddington,
Intertek use a zircon bowl pulveriser to reduce the particle size to -75µm.
Silatec – Subsampling techniques are unknown.
Samples were submitted for analysis to the Intertek Laboratory in
Maddington in Perth WA. The assay methods used by Intertek are as
follows: multi-elements are determined by a specialised four-acid digest
including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids in Teflon
tubes. Analysed by Inductively Coupled Plasma Mass Spectrometry, silica
is reported by difference.
The assay results have also undergone internal laboratory QAQC, which
includes the analysis of standards, blanks, and repeat measurements.
Samples are from reconnaissance single holes and are therefore taken on
face value.
Drill hole locations were measured by hand-held GPS with the expected
relative accuracy; GDA94 MGA Zone 51 grid coordinate system is used.
The reduced level (RL) of the drilling collars is generated from publicly
available SRTM data. The SRTM data is compared to the available
Landgate Geodetic Survey Marks to validate the data that it is appropriate
for use.
The Auger holes were completed along an existing track.
Criteria
distribution
Orientation of
data in
relation to
geological
structure
Sample
security
Audits or
reviews
Commentary
No sample compositing (down hole) has been done.
Sampling is being done on aeolian sand dunes the auger orientation is
therefore considered appropriate.
VRX Silica - All samples are selected onsite under the supervision of VRX
Silica Geological staff.
Samples are delivered to the Intertek laboratory in Maddington. Intertek
receipt received samples against the sample dispatch documents and
issued a reconciliation report for every sample batch.
Silatec – Unknown.
There has been no audit or review of sampling techniques and data yet.
Section 2: Reporting of Exploration Results
Criteria
Commentary
Mineral tenement
and land tenure
status
Auger drilling was done on Tenement E69/3560 which is held by Silatec
Pty Ltd, VRX Silica has agreed to purchase 100% of the tenement.
The tenement was granted on 17/04/2018, and all drilling was
conducted on Vacant Crown Land.
Minor exploration for bauxite and heavy minerals has been completed
by various Companies.
No exploration for silica sand has been done.
The targeted silica sand deposits are aeolian sand dunes and marine
deposits.
Sample and drillhole coordinates are provided in the body of this report.
Exploration done
by other parties
Geology
Drillhole
information
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
Balanced
reporting
Other substantive
exploration data
Further work
Not relevant
Not relevant. The auger holes are single reconnaissance holes only.
Refer to figures within the main body of this report.
This is considered a balance report.
Geological observations are consistent with aeolian dune
mineralisation.
The mineralisation is unconsolidated sand.
An Aircore drilling program is required to determine the sand coverage
and depth.