AGM Presentation
Released
Released
Announcement PDF
VRXSILICA
Supplying Global Demand
AGM PRESENTATION
November 2020
IMPORTANT INFORMATION
Disclaimer
This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal presentation and should be read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an investment decision In preparing and providing this document, VRX has not considered the objectives,
investment profile, financial position or needs of any particular recipient Mineral exploration is subject to significant risk T here is no guarantee of exploration success, and even if exploration success is achieved, there is no guarantee that development
of any mineral deposit will be economically viable VRX strongly suggests that investors consult a financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation To the maximum extent permitted by law, none of VRX, its
related bodies corporate, or their shareholders, directors, officers, employees, contractors, agents or advisors, nor any other person accepts any liability, including, without limitation, any liability arising out of fault or negligence for any loss arising from
the use of information contained in this document.
This document may include “forward looking statements” within the meaning of securities laws of applicable jurisdictions Forward looking statements can generally be identified by the use of the words “anticipate“, believe”,“ expect”,“ project”,“
forecast”,“ estimate”,“ likely”,“ intend”,“ should”,“ could”,“ may”,“ target”,“ plan”,“ guideline”,“ and other similar expressions Indications of, and guidance on, revenue models, pricing, earnings and financial position and performance are also forward
looking statements.
Such forward looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of VRX, its related bodies corporate, and their
directors, officers, employees, contractors, agents and advisors, that may cause actual results to differ materially from those expressed or implied in such statement Actual results, performance or achievements may vary materially from any projections
and forward looking statements and the assumptions on which those statements are based In particular, potential revenue opportunities and guideline pricing models set out in this document are based on certain assumptions which may in time prove
to be false, inaccurate or incorrect Readers are cautioned not to place undue reliance on forward looking statements and VRX assumes no obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any jurisdiction, and neither this presentation nor anything contained in it forms the basis of any contract or
commitment Without limiting the foregoing, this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States The securities of VRX have not been, and will not be, registered under the U S
Securities Act of 1933 as amended (Securities Act) or the securities laws of any state or other jurisdiction of the United States, and may not be offered or sold in the United States except in compliance with the registration requirements of the Securities
Act and any other applicable securities laws or pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act and any other applicable securities laws.
Competent Persons Statement
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Exploration Results and Muchea Aircore Drilling Area Mineral Resources are based on data collected and complied under the supervision of Mr David
Reid, who is a full-time employee of VRX Silica. Mr Reid, BSc (Geology), is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and the activity being undertaken to qualify as a Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion
of the data in the form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Auger area Mineral Resources is based on information compiled by Mr Grant Louw who is a full-time employee of CSA Global, under the direction and
supervision of Dr Andrew Scogings, who is an Associate of CSA Global. Dr Scogings is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. He is a Registered Professional Geologist
in Industrial Minerals. Dr Scogings has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the
Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Dr Scogings consents to the disclosure of information in this report in the form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Probable Ore Reserves is based on data collected and compiled under the supervision of Mr David Reid, who is a full-time employee of VRX Silica. Mr
Reid, BSc (Geology), is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a
Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the data in the form and context in which it appears.
VRXSILICA
2
“Sand is the main material
that modern cities are made of ”
Vince Beiser
“The World in a Grain” 2018
The story of sand and how it
transformed Civilisation
VRX SILICA – INVESTMENT HIGHLIGHTS
Significant market interest in product as environmental permitting nears completion
1
100% owner of three high value Silica Sand Projects – Muchea, Arrowsmith North and Arrowsmith Central – all located within
close proximity to Perth, Western Australia.
2
Multi-decade scale contiguous sand deposits, with combined 1,056Mt Resource, SiO2 grade 99.6% to 99.9% and low iron
impurities.
3
Leveraging growing demand in the Asia region for high-grade low iron silica sand for glass manufacture and as a component
in foundry casting. Global supply has become constrained due to depletion and environmental restrictions on dredging.
4
Bankable Feasibility Studies have validated exceptional economics with combined post tax NPV10 of $728m, capex of just
$87m, annual EBIT of $137m and IRR of 83%, all based on conservative Silica Sand sales prices.
5
Capex cost of ~$30m for each 2Mtpa project with simple “off the shelf” processing plants and convenient access to existing
under utilised rail to port transport infrastructure supporting high capacity logistics.
6
Mining Leases and Miscellaneous Licences granted for each project and environmental permitting processes well advanced
with no anticipated material issues.
7
Strong interest from potential customers in SE Asia (including Japan, South Korea and Taiwan). Offtake agreements catalyst to
financing, construction & production. Near term share market re-rating likely towards significantly higher underlying fair value.
VRXSILICA
All currencies Australian dollars unless otherwise indicated
4
CORPORATE SUMMARY
CAPITAL STRUCTURE
Share Price
Ordinary Shares on Issue
Options on Issue
Person
Role
Paul Boyatzis
Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Director
78.2 million
$104 million**
Cash
$9.3 million**
Debt
Nil
$94.7 million**
SHAREHOLDERS
Experience
Governance: Over 30 years experience in investment, equity markets and
managing public companies
Technical and Finance: Over 35 years in mining industry including previous roles as
ASX MD and General Manager
Finance and Corporate: Mining and software executive
Steven Papadopoulos
Commercial Manager
Legal and Commercial: Over 20 years experience as corporate lawyer and
commercial advisor in resources and other industries
Yoonil Kim
Marketing Manager
Marketing: 16 years’ experience selling silica sand in the Asian market
VRXSILICA
499 million**
Market Capitalisation
Enterprise Value
BOARD AND MANAGEMENT
21cps*
* Closing share price on 26 November 2020
** Estimated as at 30 November 2020 post issue of shares under placement announced to ASX on 20 November 2020
and exercise of options expiring on 30 November 2020
Board and Management
12.5%
Top 20 Total
34.4%
BROKER COVERAGE
Argonaut
Euroz Hartleys
5
WHAT IS SILICA SAND?
Silica Sand is quartz that over time, through the erosion by water and
wind, has been broken down into tiny granules.
Industrial sand is a term normally applied to high purity silica
sand products with closely controlled sizing. It is a more precise product
than common concrete and asphalt gravels.
Silica (SiO2) is the name given to a mineral composed solely of silicon and
oxygen. Found most commonly in the crystalline state, it also occurs in an
amorphous form resulting from weathering or plankton fossilisation.
Silica is hard and chemically inert and has a high melting point,
attributable to the strength of the bonds between the atoms. These are
prized qualities in applications like foundries and filtration systems.
Industrial sand’s strength, silicon dioxide (SiO2) contribution, and nonreactive properties make it an indispensable ingredient in the production
of thousands of everyday products.
VRXSILICA
6
SILICA SAND HAS VARIOUS APPLICATIONS
Glassmaking and the foundry industry is the target application for VRX’s silica product
GLASSMAKING
Flat, containers, architectural, thin film
METAL CASTING/FOUNDRY
Automobile Parts
HYDRAULIC FRACTURING
Fracking sand/proppant
CONSTRUCTION SAND
Concrete
FILTRATION
Water production
METALLURGICAL
Ferrous and Non-ferrous Alloys
CHEMICAL PRODUCTION
Sodium silicate, silicon gels
RECREATIONAL
Inert growing media, golf bunkers
CERAMICS AND REFRACTORIES
High temp resistance
VRXSILICA
Glassmaking and Foundry are VRX’s
high-value target markets
▪ Asian glass making production
increasing 5-6% p.a. (~8-10 Mtpa
Growth)
▪ Flat Glass growth in Asia 5-6% p.a.
with current market size 60-65 Mt
▪ Container Glass growth in Asia 5-6%
p.a. with current market size 65-75
Mt
▪ Cover Glass (solar panels) growth
in Asia +30% p.a. with current
market size ~8Mt
▪ Smart Glass growth in Asia 5-6%
p.a. with current market size ~2 Mt
▪ Specialist Glass growth in Asia
+10% p.a. with current market size
500-600 kt
▪ Demand for casting products for
automobiles, auto components and
construction equipment is rising
substantially
7
SILICA SAND APPLICATIONS DRIVING
GROWTH IN DEMAND
Glass and Foundry Industry growth is set to drive the demand for silica sand in the APAC Region
▪ Developing countries in the APAC region
are anticipated to experience substantial
Infrastructural spending, driving glass
demand
▪ The foundry industry in Asia has grown
as countries have gained manufacturing
specialisation and automotive demand
has risen. This industry represents a key
growth market for silica sand over the
coming years
Silica Market Demand by End Use (APAC Countries)
Silica (millions of tonnes)
2014
2019
2025F
70
High Value
VRX Target
60
50
40
30
20
10
0
Glass Industry
Foundry
Hydraulic Fracturing
Filtration
Abrasives
Others
▪ Collectively, the foundry and glass
industries represent 65% of the APAC
silica sand market and are high-value
targets for VRX’s products
VRXSILICA
Source: IMARC Group
8
ARROWSMITH NORTH & CENTRAL AND
MUCHEA SILICA SAND PROJECTS
Each project may be developed and operated separately and profitably
GERALDTON
▪
100% ownership
▪
Large scale, high-grade and low impurity silica sands projects
▪
BFSs completed Aug-Oct 2019 with following combined highlights:
▪
25-year mine life (potential for 100+ years)
Arrowsmith North Project
▪
Aggregate capital expenditure of $87 million (3 projects)
Arrowsmith Central Project
▪
Initial financing requirement c.$28.3 million (Arrowsmith North)
▪
Avg. annual EBITDA1 of $140 million
▪
Post-tax Project NPV10 of $728 million
▪
Post-tax IRR of 83%
Muchea Project
▪
Simple and conventional mining process
▪
Access to established infrastructure (logistics, power, water) – rail lines
run adjacent to project tenements
▪
Each project may be developed and operated profitably and also
separately
▪
Quality product with binding offtake discussions ongoing
▪
Environmental approvals well advanced – expected Q1 CY2021
PERTH
VRXSILICA
1. Source: VRX Bankable Feasibility Studies
9
SILICA SAND PRICE AND DEMAND DYNAMICS
Silica Sand is forecast to increase in price across Asia-Pacific countries in line with rising demand
and supply constraints due to depletion and environmental restrictions on dredging
Historic and Forecast Silica Sand Pricing
Asia Pacific Silica Sand Consumption
Flat & Container Glass, Average Price, $US/ tonne FOB
Flat & Container Glass Silica (millions of tonnes)
180
50
160
45
140
120
40
100
35
80
60
30
40
25
20
0
20
2016
2017
2018
2019
2020F
Actual
VRXSILICA
2021F
2022F
Forecast
Source: IMARC Group
2023F
2024F
2025F
2016
2017
2018
2019
2020F
Actual
2021F
2022F
2023F
2024F
2025F
Forecast
10
DEMAND NOT MET BY EXISTING PRODUCTION
Key countries in the Asia Pacific region have unmet demand from local production only
Largest Net Importers of Silica Sand in Asia Pacific
Region
Asia Pacific Silica Sand Market
Silica sand (millions of tonnes)
Consumption
Production 1
Silica (thousands of tonnes)
Import
150
Export
2500
Structural
Deficit
120
2000
90
1500
60
1000
30
500
0
0
2014
VRXSILICA
2015
2016
2017
2018
2019
China
Source: IMARC Group
1. Production aggregated from China, India, Malaysia, South Korea, Japan and Australia
Taiwan
Japan
Singapore
South Korea
11
INDICATIVE PROJECT TIMELINE
Approvals, offtakes and funding progressing, with development commencing early 2021
Production
Commences
Commence
Construction
MUCHEA
Dec
2020
June
2021
▪ Mining Leases granted for each
project
VRXSILICA
June
2022
Dec
2021
Commence
Construction
Approvals / Permitting
▪ Bankable feasibility studies for
the Muchea, Arrowsmith North
and Arrowsmith Central projects
completed
Production
Construction
ARROWSMITH
Approvals / Permitting
▪ Construction for Arrowsmith
North Project to commence
early-mid 2021 once permitting,
offtake and financing secured
▪ Construction for Muchea Project
expected to commence mid-late
2021
Production
Commences
Construction
▪ Environmental permitting
processes well advanced with
no material issues anticipated
Production
12
EXCEPTIONAL PROJECT ECONOMICS
All three projects have exceptional standalone economics over 25 years
MUCHEA
ARROWSMITH
CENTRAL
ARROWSMITH
NORTH
$338 M
$242 M
$148 M
$32.8 M
NPV
Capex
IRR 83%
VRXSILICA
$28.3 M
NPV
Capex
IRR 79%
$25.9 M
NPV
Capex
IRR 60%
Source: VRX Bankable Feasibility Studies announced on the ASX 18/10/19, 17/09/19 and 28/08/19
13
SIGNIFICANT COMPARATIVE ADVANTAGE
VRX’s projects have significantly lower operating costs than domestic and international
peers due to competitive logistics solutions
Estimated operating costs per tonne of product
$A/t
Muchea
Arrowsmith North
$A/t
$A/t
Arrowsmith Central
$A/t
60
60.0
60
60
50
50.0
50
50
40
40.0
40
40
30
30.0
30
30
20
20.0
20
20
10
10.0
10
10
0
0
0
0
Royalties & Marketing
Administration
Ship & Port Handling
Train Transport
Processing
Mining
VRXSILICA
Royalties & Marketing
Administration
Ship & Port Handling
Train Transport
Processing
Mining
Royalties & Marketing
Administration
Ship & Port Handling
Train Transport
Processing
Mining
ASX Listed Peer
Overheads, royalties & contingency
Ship & Port Handling
Truck & Barge Transport
Processing
Mining
Source: VRX Bankable Feasibility Studies announced on the ASX 18/10/19, 17/09/19 and 28/08/19 and company reports. Note that operating costs for VRX projects are quoted ‘per tonne of processed
ore’ as per the published bankable feasibility studies.
14
INFRASTRUCTURE READY
Connecting VRX’s projects to Asian Silica Sand customers
MUCHEA
ARROWSMITH
▪ Adjacent to Brand
Highway
▪ Granted Mining
Lease
▪ Underutilised
railway adjacent to
project connects
to Kwinana (100km)
▪ Grid power
available from
adjacent lines
▪ Supplementary
solar power
▪ Water from
Yaragadee deep
aquifer
VRXSILICA
▪ Established rail
network direct to
Geraldton Port
(100km) runs
through project
area
▪ Adjacent to Brand
Highway
▪ Granted Mining
Leases
▪ Dedicated gas and
solar power supply
▪ Water from
Yaragadee North
deep aquifer
15
SILICA SANDS PRODUCT AND
REVENUE BREAKDOWN
Life of mine breakdown and steady state contributions to revenue
Steady-state revenue contribution by product
Production breakdown by product
Estimated revenue per annum ($A m) (bars)
Tonnes (millions)
Forecast product price ($US/t) (dots)
80.0
80.0
70.0
70.0
60.0
60.0
50.0
50.0
6.0
C50 (Foundry AFS 50)
C20 (Foundry AFS 20)
CF400 (Glass 400 ppm
Fe2O3)
N20 (Foundry ASF 20)
5.0
NF400
NF
500 (Glass 400
500 ppm
Fe2O3)
N40 (Foundry ASF 40)
4.0
40.0
40.0
30.0
30.0
20.0
20.0
10.0
10.0
0.0
0.0
Muchea F150
3.0
Muchea F80
Muchea F80C
2.0
Continues for LOM
1.0
0
2021
VRXSILICA
Source: VRX Financial Model
2022
2023
2024
2025
2026
16
ROBUST PROJECT ECONOMICS
Post-tax NPV10 of $727.8 million driven by low cost, long-life, high-margin operations
Post Tax, ungeared NPV10
$727.8m
Post Tax, ungeared IRR
83%
Payback Period
2.4 yrs
Exchange Rate
$0.70
Life of Mine (BFS Scope)
25 yrs1
EBIT
$3,421m
Total Sales (25yrs)
$8,285m
Cashflow after finance & tax
$2,497m
Capex
$87m
Capex contingency (inc)
20%
LOM C1 Costs, FOB2
$30.24
Tonnes Processed (BFS)
158m
VRXSILICA
Free Cash Flow Profile LOM3
$400m
Sustaining Capex
Development Capex
Tax Paid (Geared)
$300m
Δ in Working Capital
Operating Costs
Revenue
$200m
FCF (Post-tax)
99
$100m
$0m
47
52
2022
2023
101
97
101
99
Continues for LOM
-20
-42
-$100m
-$200m
2020
2021
Source: VRX Bankable Feasibility Studies
1. Resource has potential to extend 100+ years
2. Includes Royalties, expressed per tonne of processed ore as in BFS
3. VRX Financial Model
2024
2025
2026
2027
2028
17
HIGH MARGIN OPERATION
LOM operating margin of A$20/t underpins robust project economics
Operating Cost
$A/t
Mining
4.86
Processing
6.57
Product Handling
17.89
Administration
0.46
Price and Cost Profile LOM1
A$/t
Royalties and Marketing
60.0
Administration
50
52
53
52
52
52
52
52
Mining
Processing
50.0
Product Handling
Revenue
Steady State
Operating Margin
A$20/t
40.0
32
32
33
31
31
31
31
Operating Costs
31
30.0
Royalties & Marketing
1.50
20.0
Total
31.28
Revenue
51.52
Average Operating Margin
20.24
VRXSILICA
1.
Continues for LOM
10.0
0.0
2021
2022
2023
2024
2025
2026
2027
VRX Financial Model and VRX Bankable Feasibility Studies announced on the ASX 18/10/19, 17/09/19 and 28/08/19
2028
18
ATTRACTIVE CAPEX SIZING
The three projects require low capex relative to their earnings potential
Muchea Capex
Process Local
Plant Infrast.
Feed
bin
Arrowsmith North Capex
Overland Trommel, Ancil. Contin. Total
conveyor pump
equip.
Capex $32.7m
25 Year EBIT $1,540m (av. $62m/yr)
VRXSILICA
Process
Plant
Local
Infra.
Feed
bin
Trommel, Contin.
pump
Arrowsmith Central Capex
Total
Capex $28.3m
25 Year EBIT $1,144m (av. $46m/yr)
Source: VRX Bankable Feasibility Studies announced on the ASX 18/10/19, 17/09/19 and 28/08/19
Process
Plant
Local
Infra.
Feed
bin
Trommel, Contin.
pump
Total
Capex $25.9m
25 Year EBIT $737m (av. $30m/yr)
19
PROCESSING FLOWSHEET
Simple processing, no chemicals and no dust, 2mtpa processing plant at each site
Processing Plant Design
Loader Feeder Trommel Screening
Stockpiles
VRXSILICA
Product Drying
Attritioning Cells
Size
Screening
Magnetic
Separation
Classifier
Spiral
Separation
▪
Muchea, Arrowsmith North
and Arrowsmith Central to
each have 2 Mtpa
processing capacity
▪
No chemicals required
20
+99.5% SiO2 WITH SIMPLE SCREEN
Arrowsmith North Silica Sand Project “Cream Sand” Size by Analysis Data
▪ Applying a simple
0.212mm – 1.0mm
screen removes the
majority of the
impurities in the Silica
sand
▪ This delivers a spec
suitable for flat and
container glass and
foundry sand
Deleterious Elements by Size Fraction
Simple screen upgrades to
+99.5% SiO2 product
6%
100%
5%
90%
4%
80%
3%
70%
2%
60%
1%
50%
0%
40%
-0.038
Fe2O3
+0.038
Al2O3
TiO2
(Left axis)
VRXSILICA
+0.045
K2O
ZrO2
+0.075
SiO2+LOI
+0.106
+0.212
+0.355
+0.5
+0.1
Size Fraction (mm)
(Right axis)
21
ENVIRONMENTAL, SOCIAL AND
GOVERNANCE (ESG)
VRX is delivering on its ESG responsibilities aligned to the UN’s Sustainable Development Goals
CLEAN ENERGY
Utilising reliable,
renewable
modern energy
VRXSILICA
ECONOMIC
GROWTH
INDUSTRY
INNOVATION
SUSTAINABLE
COMMUNITIES
RESPONSIBLE
PRODUCTION
CLIMATE
ACTION
REHABILITATION
PLAN
Enhancing
economic and
productive
employment
Building
resilient
infrastructure
and fostering
innovation
Respecting
heritage values
Employing
sustainable
mining
methods
Reducing
emissions from
production
Employing direct
vegetation
transfer as a
unique
rehabilitation
method
22
INVESTMENT HIGHLIGHTS
Well placed to capitalise
Outstanding
on robust market
project economics
outlook and demand
Emerging Australian
Tenure secured
strategic silica sand
with rapid pathway
producer
to financing and
production
VRXSILICA
23
RESOURCES AND RESERVES
Mineral Resources
Project
Muchea
Arrowsmith
North
Arrowsmith
Central
Ore Reserves
Classification
Mt
SiO₂ % Al₂O₃ % Fe₂O₃ % TiO₂ % LOI %
Indicated
29
99.6
0.09
0.03
0.07
0.22
Inferred
172
99.6
0.05
0.02
0.10
0.23
Total
208
99.6
0.06
0.02
0.10
0.23
Indicated
248
97.7
1.00
0.40
0.20
0.50
Inferred
523
98.2
0.80
0.30
0.20
0.40
Total
771
98.0
0.86
0.30
0.17
0.41
Indicated
28.2
96.6
1.70
0.40
0.20
0.70
Inferred
48.3
96.9
1.50
0.40
0.20
0.70
Total
76.5
96.8
1.50
0.40
0.20
0.70
Total Mineral Resource
1,056 Million Tonnes
Project
Muchea
Classification
Probable
Product
Recovery
Mt
F80
48%
10.2
F80C
20%
4.25
F150
20%
Muchea Ore Reserve
Arrowsmith
North
Probable
Arrowsmith
Central
0.02
0.008
0.03
0.1
4.25
99.8
0.07
0.015
0.035
0.1
18.7
Million Tonnes
0.05
0.035
0.1
0.04
0.03
0.1
<1%
2%
24%
60
N40 / NF500
60%
149
Local Market
6%
15
223
CF400
17%
4.2
C20
34%
8.4
C40
17%
4.2
High TiO 2
9%
2.2
Arrowsmith Central Ore Reserve
18.9
Probable
Total Ore Reserve
VRXSILICA
99.9
N20
Arrowsmith North Ore Reserve
SiO2 % Al 2 O 3 % Fe2 O3 % TiO2 % LOI %
99.7
0.2
Million Tonnes
99.6
0.25
Million Tonnes
261 Million Tonnes
*Note: Interpreted mineralisation is domained into different sand types based on drill logging data and publicly available soil mapping information, above a
basal surface wireframe defined on the current drill sampling depths. Depletion zones include the upper 0.5 m for rehabilitation purposes, and minor swamp
zones in the east and south of the modelled area. Differences may occur due to rounding. Details of the Arrowsmith North, Arrowsmith Central and Muchea
Resources can be found in the announcements dated 9 July 2019, 15 August 2019 and 17 June 2019 respectively.
24
Thank you
Bruce Maluish
Managing Director
Level 1, 6 Thelma Street
West Perth WA 6005
Phone: 08 9226 3780
Email: brucem@vrxsilica.com.au
Share your feedback
Discover