Half Yearly Report and Accounts
Released
Released
Announcement PDF
VENTNOR RESOURCES LIMITED
ABN 59 142 014 873
INTERIM FINANCIAL REPORT
FOR HALF-YEAR ENDED
31 DECEMBER 2015
CORPORATE DIRECTORY
DIRECTORS
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
SECRETARY
John Geary
REGISTERED AND PRINCIPAL OFFICE
Level 1, 6 Thelma Street
West Perth WA 6005
Telephone: (08) 9226 3780
Facsimile: (08) 9226 3764
SHARE REGISTRY
Computershare Investor Services Pty Ltd
Level 2
45 St George's Terrace
Perth WA 6000
Telephone: (08) 9323 2000
Facsimile: (08) 9323 2033
AUDITORS
RSM Australia Partners
8 St Georges Terrace
Perth WA 6000
AUSTRALIAN SECURITIES EXCHANGE
Ventnor Resources Limited shares (VRX) are listed
on the Australian Securities Exchange
Ventnor Resources Limited
1
DIRECTORS’ REPORT
Your directors submit the financial report of the consolidated entity for the half-year ended 31
December 2015. In order to comply with the provisions of the Corporations Act 2001, the directors
report as follows:
DIRECTORS
The names of the Directors who held office during or since the end of the half-year and until the date
of this report are noted below. Directors were in office for this entire period unless otherwise stated:
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
REVIEW OF OPERATIONS
The net loss for the half-year attributable to members of Ventnor Resources Limited was $319,455
(2014: loss of $419,052).
EXPLORATION ACTIVITIES SUMMARY
Ventnor Resources Limited (Ventnor or the Company) is pleased to provide the following summary
of exploration activities conducted during the half year ended 31 December 2015.
In doing so Ventnor advises that in keeping with its periodic reporting obligations extensive detail of all
activities conducted have been released to the market in the September Quarterly Activity Statement
(on 29 October 2015) and the December Quarterly Activity Statement (on 29 January 2016).
Accordingly, a number of images have been omitted from the summary, however assay tables have
been included. Parties interested in the full range of images are referred to the quarterly reports
lodged on the Company’s ASX site on the dates mentioned above.
Thaduna/Green Dragon JV – Copper
On 4 December 2013 Ventnor entered a JV agreement with Sandfire Resources NL (Sandfire) on the
historic Thaduna/Green Dragon copper project located 170km north of Meekatharra in Western
Australia. The benefits of the JV for Ventnor shareholders are:
Reducing the previous project capital cost estimate of $70M included in the Scoping Study
(completed February 2013) to only the establishment costs.
Sandfire providing all JV funding through to production from contributions and interest-free
loans;
Ventnor not incurring additional financing costs to develop the project;
Minimising on-going equity dilution for current shareholders; and
Lower processing costs at Sandfire’s DeGrussa plant because of its higher throughput rate
compared to that contemplated in the Ventnor Scoping Study.
Upon execution of the JV document Sandfire acquired a 35% interest in the project and management
of the JV. Sandfire currently has an exploration spend obligation on the tenements in order to satisfy
the second tranche requirements to move to a 51% interest in the JV. The JV agreement required
Sandfire to complete the tranche expenditure by 4 December 2015, however an extension of time was
requested and granted to 4 June 2016.
Ventnor Resources Limited
2
DIRECTORS’ REPORT
As part of Sandfire’s second tranche expenditure an RC drill program was completed at the Thaduna
copper project and results including those below were announced in October 2015.
TDRC001
5m @ 3.19% Cu, 9.62g/t Ag from 251m DH
TDRC004
4m @ 1.53% Cu, 1.90g/t Ag from 193m DH
The RC drill program was planned to target gaps in drill coverage over the main ore body, between
o
known mineralisation intercepts and entailed drilling 5 holes at a dip of 63 to an average depth of
approximately 240 metres down hole. It was also intended to test drill methods to keep RC resource
definition holes and diamond pre-collars at the proposed trajectory. The Thaduna copper project is
susceptible to significant drillhole deviation and TDRC003 did not reach the ore zone. True widths will
be estimated following final downhole survey data.
Sandfire RC Drill Hole program September 2015
Hole Id
Easting
Northing
Az (AMG)
Dip
Hole Depth
From
To
DH m
Cu %
Ag ppm
TDRC001
772517
7176167
52.3
-63
300
251
256
5
3.19
9.62
TDRC002
772600
7176071
61.0
-63
222
NSA
TDRC003
772606
7175988
44.3
-63
220
Hole incomplete
TDRC004
772814
7175794
52.3
-63
227
1.53
1.90
TDRC005
772716
7175974
52.3
-63
245
193
197
4
NSA
Cu tabled assays > 0.5% Cu
A further diamond drilling program of 6 diamond holes was drilled at the Thaduna Copper Project and
assays announced subsequent to the period under review.
Detailed Information
At the time of commencement of the Joint Venture with Sandfire Resources, Ventnor had completed
221 RC holes for 29,041 metres with 79 Diamond Tails for 20,485 metres, totaling 49,526 metres at
the Thaduna Project.
Black Dragon Gold Project
Background Information
The Black Dragon Gold Project is located on E39/1828, 370 kilometres north-east of Kalgoorlie and
22 kilometres north-east of AngloGold Ashanti (70%) and Independence Group’s (30%) Tropicana
Gold mine, a project with in excess of seven million ounces of gold in Resources.
The Black Dragon prospect was initially sampled by AngloGold Ashanti with rock chip and soil
sampling. In a small area of outcrop of approximately 150 metres by 150 metres, 31 rock chip
samples returned better than 1g/t Au with a peak value of 573g/t Au.
Ventnor Resources Limited
3
DIRECTORS’ REPORT
Ventnor Exploration
Upon granting of E39/1828, Ventnor conducted a reconnaissance field trip to confirm the location of
the previously reported surface rock chip results and to undertake multi-element assays.
By the time Ventnor’s initial rock chip gold results were announced on 28 April 2015 and the multielement results on 28 May 2015 it was postulated that the high grade mineralisation at Black Dragon
was potentially epithermal in origin due to the presence of significant silver, tellurium and barium in
the surface rock chips.
During August Ventnor conducted an initial drilling program at the Black Dragon Gold Project
designed to recognise the deposit is visually and structurally different to typical West Australian
archean gold deposits. The on-site drill hole planning was flexible enough to deal with expected
variations in strike, dip and plunge components and, essentially, to test the potential for a new style of
mineralisation in this exciting gold region.
A total of 33 RC drill holes were completed for 2,492 metres of drilling. The average vertical depth per
hole was 50 metres.
During drilling 15 RC samples were selected on the basis of observed geology and hand portable
XRF results. These samples were panned and visible gold and silver were noted in 12 of the samples
and announced on 3 September as well as the expectation that discrete ore intercepts or any
indication of true widths of gold bearing lodes would be subject to final assays expected in early
September 2015.
The observed geology from the RC drilling confimed the Company’s belief that Black Dragon is an
epithermal-style deposit.
By 17 September Ventnor had received and tabulated the assay results from the first 8 holes from the
initial drill program which are summarised below. Initial laboratory analysis were for gold and silver
only and were announced on the ASX platform with the results from multi-element analysis of
selected intersections yet to come. Sample assays from all holes received as at that date had
indicated anomalous gold results.
Significant results include:
BDRC1001 9m @ 7.08g/t Au, 3.88g/t Ag from surface
Inc 2m @ 24.74g/t Au, 14.14g/t Ag from 1m DH
BDRC1006 2m @ 4.47g/t Au, 0.70g/t Ag from 7m DH
BDRC1007 3m @ 3.14g/t Au, 1.17g/t Ag from 7m DH
There is a structural complexity typical of an epithermal system which will require a flexible exploration
approach to determine the geological controls on the higher grade zones.
By 16 November results from all holes had been received and are tabled below but significant results
from the remaining holes include:
BDRC1015 – 5m @ 2.26g/t Au, 1.88g/t Ag from 6m
BDRC1026 – 6m @ 3.02g/t Au, 0.64g/t Ag from 25m
BDRC1026 is particularly significant as it is on the eastern extremity of the drill pattern and adjacent
to an emissivity anomaly which is explained in the discussion below.
Ventnor Resources Limited
4
DIRECTORS’ REPORT
Hole Id
Easting Northing Az
BDRC1001 170677 6289446 330
BDRC1002
BDRC1003
BDRC1004
BDRC1005
BDRC1006
170682 6289437
170659 6289483
170686 6289432
170690 6289423
170665 6289430
330
330
330
330
330
Dip
-60
Incl.
Incl.
-60
-60
-60
-60
-60
Incl.
BDRC1007 170673 6289412 330
-60
BDRC1008 170696 6289457 330
-60
From
0
1
6
6
To
9
3
7
12
31
33
7
8
46
7
33
5
44
34
9
9
48
10
41
7
DH m Au ppm Ag ppm
9
7.08
3.88
2
24.74 14.15
1
10.87
5.60
6
1.15
0.24
NSA
13
0.26
0.10
1
0.51 NSA
2
4.47
0.70
1
8.71
1.30
2
5.57 NSA
3
3.14
1.17
8
0.51
0.19
2
2.98
0.50
The results above are encouraging in that generally they are higher grade than indicated by historic
reconnaissance drilling.
The geology as intersected down-hole is very complex with host lithologies and mineralisation trends
unclear and no estimate of true widths can be made at this early stage.
Generally, the lithology appears to be a package of volcanic sediments, including wackes and shales,
which have been altered and pervasively silicified. Weathering is very shallow with the base of
oxidation being less than 10 metres below the surface. There appears to be an inconsistent fabric or
foliation to the host rocks with further evaluation to be undertaken following receipt of all assays to
ascertain the controls on mineralisation. Drilling was undertaken in multiple directions based initially
on mapping of the local outcrop and field observations of drill samples and identification of alteration.
This is to be expected if Black Dragon is in fact an epithermal system, as postulated. Additional
drilling will be required to follow up on the results from this initial drilling campaign and after optimum
drill direction is determined.
Following the multi element analyses received to date, when considered in conjunction with the
geochronology of the Tropicana Deposit, suggests that previous exploration efforts may have been
testing for an inappropriate genesis for the mineralisation identified at Black Dragon. The
mineralisation at Tropicana, ~30km to the south west, has been aged at 2520 Ma (Doyle et al.),
whereas Black Dragon is part of the Paleoproterozoic Biranup Zone which is aged at ca. 1800 Ma
(GSWA). The high grade mineralisation encountered at Black Dragon therefore may be up to 1 billion
years younger than the mineralising event that formed Tropicana.
The Company has continued to collate data from previous exploration and has been using various
cost effective techniques to evaluate further potential on the tenement. A summary of collated data is
included here. More data is forthcoming and will be included in the database for further review.
Ventnor Resources Limited
5
DIRECTORS’ REPORT
The August 2015 RC drilling program has drilled gold intersections which are significantly better in
width and grade than the previous drilling in the area.
The plan below, shows the locations of the 33 holes drilled by Ventnor in August 2015.
Further analysis of the datasets available from previous exploration, and the addition of the dataset
generated from this recent drilling program has increased the Company’s confidence in the proposed
genetic model that a linear vein system is present at Black Dragon which has two populations of gold;
bonanza telluride with silver and sulphides, and a lower tenor gold and barite halo.
Analysis of the regional aircore bottom of hole multi-element data available from previous exploration,
discussed below, shows there is a strong association between Au and Te, even when considering
that this data has not been domained for the suggested mineralisation styles discussed above.
This new understanding has resulted in the interpretation that the high grade lenses intersected in the
recent drilling has a more east-west orientation. A follow up drill program has been designed to take
account of this. The plan below shows the proposed 6 RC holes to test the postulated orientation.
Ventnor Resources Limited
6
DIRECTORS’ REPORT
RC drill results table
The drill program gold and silver results are tabulated below:
Hole Id
Easting Northing Az
170677 6289446 330
BDRC1002 170682 6289437 330
BDRC1004 170686 6289432 330
BDRC1005 170690 6289423 330
170665 6289430 330
BDRC1006
Dip
-60
Incl.
Incl.
-60
-60
-60
-60
Incl.
170673 6289412 330
-60
BDRC1008 170696 6289457 330
-60
BDRC1001
BDRC1007
From
0
1
6
6
31
33
7
8
46
7
33
5
To
9
3
7
12
44
34
9
9
48*
10
41
7
DH m Au ppm Ag ppm
9
7.08
3.88
2
24.74 14.15
1
10.87
5.60
6
1.15
0.24
13
0.26
0.10
1
0.51 NSA
2
4.47
0.70
1
8.71
1.30
2
5.57 NSA
3
3.14
1.17
8
0.51
0.19
2
2.98
0.50
Cont….
Ventnor Resources Limited
7
DIRECTORS’ REPORT
Hole Id
Easting Northing Az
170702 6289438 330
Dip
-60
170712 6289422 330
-60
170711 6289463 330
-60
BDRC1013 170720 6289447 330
170670 6289439 330
BDRC1014
-60
-60
BDRC1015 170676 6289427 330
170724 6289482 330
BDRC1017
-60
-60
BDRC1018
BDRC1019
BDRC1021
BDRC1023
BDRC1009
BDRC1010
BDRC1012
6289455
6289493
6289506
6289429
6289491
330
330
330
330
60
-60
-60
-60
-60
-50
170779 6289455
60
-50
Incl.
BDRC1027 170756 6289489 240
170567 6289331 330
BDRC1030
-50
-60
BDRC1025
170737
170743
170761
170755
170762
BDRC1026
170671 6289445
60
-60
170579 6289337
60
-60
Incl.
Incl.
BDRC1031
BDRC1032
From
34
55
25
40
36
41
20
2
8
54
6
11
53
18
51
38
20
40
59
25
26
39
6
60
68
0
6
32
65
65
76
84
To
36
58
29
42
38
48
23
5
9
56
11
13
57
20
54
39
24
42
62
31
31
42
8
63
71
4
9
35
79
67
78
88
DH m Au ppm Ag ppm
2
0.66
0.10
3
0.59
0.07
4
0.58 NSR
2
0.19
0.06
2
0.92
0.25
7
0.50
0.04
3
0.39 NSR
3
0.27
0.13
1
1.50
0.60
2
0.87 NSR
5
2.26
1.88
2
1.37 NSR
4
1.45 NSR
2
0.24 NSR
3
0.21 NSR
1
0.73
0.10
4
0.38 NSR
2
0.75
0.21
3
0.22
0.13
6
3.02
0.54
5
3.57
0.64
3
0.29
0.01
2
0.47
0.06
3
0.27
0.20
3
0.40
0.07
4
0.18 NSR
3
0.83
0.30
3
0.37 NSR
14
0.69
0.82
2
1.15
0.06
2
1.85
3.55
4
0.38
0.48
* intersection includes BOH sample
Tabulated results are for intersections > 0.1 g/t Au
Ventnor Resources Limited
8
DIRECTORS’ REPORT
Regional Targeting October 2015
Available Datasets
A significant number of datasets are available from historic exploration. The datasets consist of Rock
chips (165 samples) and Soil sampling (2,576 samples), as well as tenement wide coverage of Auger
sampling (3,769 samples) and vertical Aircore (AC) drilling. A total of 1,044 AC holes for 43,773m
were completed, and 66 Reverse Circulation (RC) drill holes for 9,600 metres were conducted in
selected areas. 4 Diamond holes for 821.2 metres were drilled for stratigraphy and litho-geochem
analysis.
All Soil and Auger sampling was analysed for a Multi-Element (ME) suite, including ppb gold. RC
drilling was analysed for gold on 1 metre splits and the AC drilling was analysed for gold on 4 metre
composite samples with selected 1 metre splits. Multi-element analysis was undertaken on all bottomof-hole (BOH) AC samples, no RC samples were analysed for multi-element. As a result, only a
limited number of samples containing significant gold grades were accompanied by a multi-element
suite, eg. Out of 1,048 multi-element samples only 5 had grades above 0.2g/t Au, with a peak of
0.98g/t Au. This means that the elemental signature of the high grade gold mineralisation is not well
established at this point.
The spacing of the AC drilling varies greatly but in general it is 200 metre spaced holes on lines
spaced 200 metres apart on the best covered areas with 400 metre spaced lines on the bulk of the
tenement with up to 2 km spaced lines on the periphery. All AC drilling is vertical and drilled to blade
refusal with the shallowest, and deepest, holes being 7 metres and 89 metres respectively. For the
purposes of targeting, the BOH ME sample can be regarded as a spot bedrock sample.
There are two geophysical datasets available over E39/1828, Gravity data was collected on 500 x
1,000 metre stations and aeromag data that was flown on 250 metre line spacing.
Aeromag data flown on a 50m line spacing has been acquired and is being evaluated as has the
Gravity images.
The gravity images indicate dominant features and separation between gravity highs and lows. The
indicated trends show gravity lows orientated NE-SW which some support from the gravity highs,
however there is a stronger, perpendicular, NW-SE component to the gravity highs, possibly
associated with intrusives. Areas of known mineralisation, eg. Black Dragon Outcrop is in a gravity
low.
The TMI images that have been acquired show the predominant SW-NE trend of the regional geology
in this area. Areas of known mineralisation, eg. Black Dragon Outcrop, are associated with flexures
along the regional trend. There are areas of high magnetic intensity which may be due to mafic
intrusive with associated magnetite alteration.
Ventnor has recently received a set of emissivity targets that were generated by Mineral Spectra
Mapping. The emissivity intensity is calculated from the satellite sensor thermal infrared bands, where
the wavelength is >9,000nm; the image data is acquired at night. The emissivity is not mapping the
spectral signature of minerals but rather variations in the heat flow from the earth's surface. As it is not
reflected light, it is less affected by vegetation and other surface features than conventional remotely
sensed imagery. Variations in emissivity intensity may be related to bulk differences in the
temperature of different rock units related to their density and mineral composition. These emissivity
targets (EMS), are used here to compare with the drilling and auger multi-element data sets, in
conjunction with the geophysical data to generate the target areas below.
Instead of focusing on individual EMS anomalies, it is logical to group them in a way that reflects the
underlying geological target style and/or geographical proximity.
Accordingly the sub-project areas going forward are now denoted as follows;
North Dragon
Black Dragon, includes the Black Dragon Outcrop
Red Dragon
Ventnor Resources Limited
9
DIRECTORS’ REPORT
Ice Dragon
Fire Dragon
Data Analysis
The various geochemistry and drilling datasets have been analysed individually using each elements’
statistical variation to generate grid and thematic interpolations to guide targeting. Typically the BOH
AC dataset is preferred as it represents a bedrock sample, however in some areas the AC coverage
is sparse and for certain elements the auger data has also been considered, eg. For Au and Te.
In conjunction with the individual analysis of the multi-element suite an additional ratio has been
generated and analysed. This is known as a Heath-Campbell Ratio (HCN), and is based on the theory
that alkali element mobility is effective in vectoring into gold mineralisation. The ratio uses Cs, Rb, and
Th sampling results and the BOH AC samples are ideal for this type of analysis.
Target Areas
Black Dragon Project Area
The Black Dragon sub-area contains within it the area of high grade outcrop that was the initial area
of interest with Ventnor following up confirmation rock chips with a successful RC drilling program of
33 holes for 2,492 metres. Drilling of this outcrop area is dealt with in the preceding section, however,
in addition to the drilling the outcrop has a coincident moderate EMS anomaly with a strong Au and
Te association in both auger and BOH AC results.
This sub-area contains EMS 1, 2 and 3, which are moderate, very strong, and moderate, respectively,
in strength. The area is associated with a strong Au and Te association with regional NE trending
structures on the magnetics with troughs and breaks. The gravity shows localised gravity highs and
discrete lows which suggest an ENE – WSW trend.
EMS 1 is slightly west of the high grade outcrop that returned values up to 20ozt Au. This area has
AC coverage and 9 prior and 33 VRX RC holes.
EMS 2 to the north has AC results of up to 1m @ 1g/t Au in 2 holes in the middle of the anomaly and
then 400m north there is 1m @ 0.3g/t and 2m @ 0.15g/t Au at BOH associated with elevated Ag
results. There are 4 RC holes drilled at EMS 2, 2 were only 15m deep, the other 2 are 400m apart
and intersected 5m @ 0.14g/t Au and 1m @ 0.1g/t Au.
EMS 8 is to the west against the tenement boundary and is associated with anomalous Au and As in
BOH AC.
Red Dragon Project Area
The Red Dragon area contains 4 small weak EMS anomalies trending NE – SW. The area is
associated with very strong Au in auger and AC results as well as Ba, Te and W, there is a strong Ag
anomaly at EMS 5. The magnetics show a simple peak and trough in a NNE direction with a strong
feature to the west. This area was the main focus of the prior work.
North Dragon Project Area
North Dragon has 1 large strong emissivity anomaly, EMS F. This area has only had wide spaced
auger and AC drilling, 1-2km spacing on AC. There are some strong Te, Ag and Sb results associated
with good areas of HCN ratio. The gravity is quite spotty and the magnetics are quite muted. There
are three AC holes in a line to the north that have 1g/t Ag at BOH. An AC hole in the northwest has
1m @ 0.5g/t Au. Whilst the magnetics appear muted, they do indicate some structural complexities.
Ventnor Resources Limited
10
DIRECTORS’ REPORT
Ice Dragon
Ice Dragon runs down the western side of the tenement over 10km of strike, there are 4 small weak
EMS anomalies along the strike trending NE. Previously only 4 lines of 200m spaced holes have been
drilled over the strike extent, however they did intersect some very significant ppb Au anomalism
along a possible NE strike, being, 3m@100ppb, 1m@125ppb, 4m@38ppb, 8m@120ppb and
2m@42ppb. There are also strong BOH Te, As, Bi and W anomalism and a very strong trend on the
HCN ratio. The gravity is quite spotty and the magnetics are nondescript.
Fire Dragon
Fire Dragon is a cluster of moderate EMS anomalies at the very southern end of the tenement, this is
one of the last areas that was previously explored. There are consistent BOH Ag results with a high of
28.68g/t Ag (this sample also returned 0.32% Co) with some discreet Au results in AC, 1m@128ppb
and 1m@220ppb, plus very strong Te in auger and strong Ba and W in BOH AC. The area is also
associated with a strong HCN Ratio anomaly. The gravity is moderate, but spotty, and the magnetics
encouraging with two parallel NE trending structures 2km apart with complex structures in between
indicating a possible dilation zone.
Warrawanda Nickel Project
During the period, the Company conducted a Fixed Loop EM Survey over the Tempest target
identified at the Warrawanda Nickel Project. No significant anomalies were highlighted and the data
is being further evaluated with respect to the data that has been accumulated to date.
Events Subsequent to the Period
On 21 January Ventnor and its JV partner, Sandfire announced the results from the diamond drill
program aimed at resource definition at the Thaduna/Green Dragon Copper Project. The drill program
at Thaduna comprised six diamond drill holes and two preliminary RC pre-collars with best results of:
TDDD010 11.0 metres @ 4.7% Cu and 19.3 g/t Ag
TDDD013
6.3 metres @ 6.0% Cu and 28.2 g/t Ag
The program had been planned and selected to target gaps in drill coverage over the main ore body,
between known mineralisation intercepts and all holes have intersected the target zone with results
below.
In making the announcement Ventnor Managing Director Bruce Maluish commented that these
diamond holes had intersected the main orebody at Thaduna with results that met our expectations
and confirmed the predictability and consistency that was indicated by the previous Resource drilling.
o
o
The drill program comprised six holes drilled at dips of 60 – 63 , and to a depth of up to 462m
downhole. The drill program targeted the Thaduna Fault mineralisation and was designed as an initial
step towards the resource definition of the middle portion of mineralisation. Each drill hole was
designed to improve geological certainty over the areas of known mineralisation, and to extend
mineralisation where possible.
Ventnor Resources Limited
11
DIRECTORS’ REPORT
Hole Locations
Hole ID
TDDD009
TDDD010
TDDD011
TDDD012
TDDD013
TDDD013A
TDDD014
TDDD015
Depth
66.0
314.3
371.9
462.4
438.3
96.0
300.7
399.6
Dip
-63.0
-61.0
-62.0
-63.0
-63.0
-60.0
-61.0
-61.0
Azimuth
53.4
52.1
60.0
52.0
52.8
51.0
55.0
55.0
Grid ID
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
MGA94_50
East
772519
772688
772597
772566
772527
772527
772544
772456
North
7176211
7175878
7175944
7175982
7176029
7176029
7176115
7176146
RL
561.2
560.6
561.8
560.3
560.4
560.5
560.9
560.5
Hole Status
RC Precollar
Complete
Complete
Complete
Complete
RC Precollar
Complete
Complete
Hole Assays
Hole ID
Interval
From (m)
To (m)
TDDD010
1
2
1
2
3
4
1
2
3
1
2
1
2
1
2
245.0
272.0
223.9
245.0
297.6
352.3
279.0
288.0
383.0
355.7
381.0
247.0
255.8
225.2
321.2
247.0
283.0
224.2
245.9
299.0
353.9
280.0
289.0
386.0
357.0
387.3
251.0
257.0
225.7
323.3
TDDD011
TDDD012
TDDD013
TDDD014
TDDD015
Downhole
Width (m)
2.0
11.0
0.3
0.9
1.4
1.6
1.0
1.0
3.0
1.3
6.3
4.0
1.2
0.6
2.1
Est. True
Width (m)
1.4
7.5
0.2
0.6
0.9
1.0
0.9
0.9
2.3
0.9
4.4
2.8
0.8
0.4
1.6
Intersection
Cu (%)
Ag (g/t)
1.1
3.0
4.7
19.3
1.0
2.4
4.1
1.8
2.1
0.3
7.8
38.5
2.2
0.3
4.9
1.1
2.5
9.9
2.2
5.1
6.0
28.2
3.6
9.2
1.2
3.0
1.2
0.3
3.3
7.1
Competent Person’s Statement
The information in this report that relates to Exploration Results regarding the Black Dragon Project is based on,
and fairly represents, information compiled by Mr David Reid who is a Member of the Australasian Institute of
Mining and Metallurgy (MAusIMM). The information in this report that relates to Exploration Results regarding the
Thaduna Copper Project is from information supplied by Sandfire Resources and compiled by Mr Reid. Mr Reid
is a contractor to Ventnor Resources Limited. Mr Reid has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the “2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Reid consents to the inclusion in this report of the matters based on
information provided by him and in the form and context in which it appears.
Ventnor Resources Limited
12
DIRECTORS’ REPORT
CHANGES IN STATE OF AFFAIRS
During the half-year ended 31 December 2015 there was no significant change in the entity’s state of
affairs other than that referred to in the half-year financial statements or notes thereto.
EVENTS SUBSEQUENT TO THE PERIOD
There are no other matter or circumstances which have arisen since the end of the half-year which
significantly affected or may significantly affect the operations of the consolidated entity, the results of
those operations, or the state of affairs of the consolidated entity in subsequent financial periods,
other than as disclosed in Note 7 to the financial statement.
AUDITOR’S DECLARATION OF INDEPENDENCE
A copy of the auditor’s independence declaration as required under section 307C of the Corporations
Act 2001 in relation to the review for the half-year ended 31 December 2015 is included within this
financial report.
Signed in accordance with a resolution of the directors.
Paul Boyatzis
Chairman
Perth, 10 March 2016
Ventnor Resources Limited
13
STATEMENT OF COMPREHENSIVE INCOME
For the half-year ended 31 December 2015
Consolidated
31 December
31 December
2015
2014
$
$
Continuing operations
Revenue
37,332
38,174
Exploration and evaluation expenditure
Depreciation
Directors fees and benefits expense
Share based payments
Finance costs
Corporate and administration expenses
(51,128)
(17,064)
(79,750)
(208,845)
(68,646)
(21,192)
(79,750)
(83,890)
(203,748)
Loss before income tax expense
(319,455)
(419,052)
-
-
(319,455)
(419,052)
Other comprehensive income
-
-
Other comprehensive income for the period, net of tax
-
-
(319,455)
(419,052)
(0.23)
(0.35)
Income tax expense
Net loss for the period
Total comprehensive loss attributable to members of
Ventnor Resources Limited
Basic and diluted loss per share (cents per share)
The accompanying notes form part of these financial statements
Ventnor Resources Limited
14
STATEMENT OF FINANCIAL POSITION
As at 31 December 2015
Consolidated
31 December
30 June
2015
2015
$
$
Note
ASSETS
Current Assets
Cash and cash equivalents
Trade and other receivables
408,228
20,494
1,027,759
39,318
Total Current Assets
428,722
1,067,077
42,000
27,950
12,445,827
42,000
45,014
12,126,374
Total Non-Current Assets
12,515,777
12,213,388
Total Assets
12,944,499
13,280,465
LIABILITIES
Current Liabilities
Trade and other payables
Provisions
40,889
54,835
61,611
50,624
Total Current Liabilities
95,724
112,235
Total Liabilities
95,724
112,235
12,848,775
13,168,230
19,343,243
1,551,256
(8,045,724)
19,343,243
1,551,256
(7,726,269)
12,848,775
13,168,230
Non-Current Assets
Trade and other receivables
Plant and equipment
Deferred exploration expenditure
2
Net Assets
EQUITY
Issued capital
Reserves
Accumulated losses
Total Equity
3
The accompanying notes form part of these financial statements
Ventn
Share your feedback
Discover