Muchea Silica Sand Project
Drilling Results
Highlights:
ASX: VRX
•
Aircore and hand auger results received for Ventnor’s
preliminary due diligence drill program
Capital Structure
•
Results indicate high-grades of silica sand
•
Shares on Issue:
251.3 million
Excellent potential for high tonnage resource
•
Supports decision to secure option over project
Ventnor Resources Limited (Ventnor or Company) (ASX: VRX) is
pleased to announce results from its preliminary due diligence drill
program at the Muchea Silica Sand Project.
As announced to ASX on 26 March 2018, the Company has, subject to
shareholder and regulatory approvals, secured from Australian Silica
Pty Ltd (AS) an option to acquire tenement E70/4886 (Tenement),
which forms the Muchea Silica Sand Project located 50km north of
Perth, Western Australia.
As part of its initial due diligence investigations into the project prior to
grant of the option, Ventnor conducted an aircore (AC) and hand
auger drilling program within the Tenement area to confirm the
potential of the project as indicated by previous work undertaken by
AS.
Ventnor’s drilling included an AC drilling program of 46 holes for 522
metres and 43 hand auger holes for 249 metres with an average
intercept grade of 99.5% SiO2.
Unlisted Options:
21.25 million
Corporate
Directory
Paul Boyatzis
Non-Executive
Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive
Director
John Geary
Company Secretary
Company Projects
A full analysis of all the quality control data has now been assessed.
This analysis validates the drill assay dataset and conforms to the
guidelines for reporting under the JORC-2012 code.
Arrowsmith Silica
Sands Project, 270km
north of Perth, WA.
Ventnor Managing Director, Bruce Maluish said: “The results of our
preliminary due diligence drilling program have confirmed the results
provided by Australian Silica and also that this project has the potential
for a very large high-grade silica sand resource. It supports and
justifies the Company’s decision to secure an option to acquire the
underlying tenement.”
Biranup base metals
and gold Project
adjacent to the
Tropicana Gold Mine,
WA.
He continued, “As part of our due diligence investigations, we have
also commenced a comprehensive testwork program to ascertain what
products could be produced and marketed from the project and later to
support a JORC-2012 compliant Mineral Resource. The testwork
program, which is ongoing, will also produce sufficient quantities of
products to enable samples to be sent to prospective customers.
Warrawanda Nickel
Project south of
Newman, WA.
The Company is
actively assessing
other projects in
Australia.
The Company has already received a number of enquiries from potential Asian customers.”
“As part of its due diligence the Company undertook an environmental desktop study which
will also support a referral to the relevant environmental authorities prior to field studies for a
Mining Proposal,” Mr Maluish said.
Detailed Information
The Muchea Silica Sand Project is located on tenement E70/4886 (refer Figure 1 below),
located in the Muchea area, 50km north of Perth,
Figure 1: Muchea Silica Sand Project Location
The targeted silica sand deposits are the aeolian sand dunes that overlie the Pleistocene
limestones and paleo-coastline, which host the Gingin heavy mineral deposits.
Figure 2 below is a schematic section showing the silica sand dune that is targeted for
exploration. The targeted dune is the area above the surrounding natural surface and well
above the standing water table.
Figure 2: Schematic section of Silica Sand Dune Exploration Target
Drilling
As part of its preliminary due diligence investigations into the Muchea Silica Sand Project,
Ventnor conducted the following drilling activities:
•
An aircore drilling program of 46 holes for 522 metres (Blue outline and dots shown on
Figure 3).
•
43 hand auger holes for 249m (Red outline and stars, shown on Figure 3).
Figure 3: Aircore and auger drilling completed on E70/4886, with exploration targets.
The potential quality and grade of these Exploration Targets are conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource. It is uncertain
if further exploration will result in the estimation of a Mineral Resource.
Aircore
Vertical aircore drilling was completed by Wallis Drilling using a Landcruiser mounted Mantis
82 drill rig to take 1m downhole samples. Drilling encountered only unconsolidated sand and
was terminated either at the water table or extended when an iron rich layer was intersected.
The detailed results of the drilling are shown in Table 1, and the hole positions, coloured by
grade ranges, shown as dots on Figure 3. The high grade composites shown in Table 1 were
calculated using a 99% SiO2 lower cut-off grade with a maximum of 2m of internal dilution.
Hole ID MGA_Nth MGA_East
MAC001
MAC002
MAC003
MAC004
MAC005
MAC006
MAC007
MAC008
MAC009
MAC010
MAC011
MAC012
MAC013
MAC014
MAC015
MAC016
MAC017
MAC018
MAC019
MAC020
MAC021
MAC022
MAC023
MAC024
MAC025
MAC026
MAC027
MAC028
MAC029
MAC030
MAC031
MAC032
MAC033
MAC034
MAC035
MAC036
MAC037
MAC038
MAC039
MAC040
MAC041
MAC042
MAC043
MAC044
MAC045
MAC046
6515718
6515719
6515735
6515735
6515740
6515745
6515769
6515782
6516076
6516481
6516835
6517032
6517020
6517005
6515156
6514718
6514493
6514062
6513774
6513720
6513201
6512853
6512368
6511706
6511885
6516560
6516998
6517404
6517670
6517937
6517628
6517276
6517038
6517042
6515308
6515267
6515270
6514704
6514227
6514065
6515221
6514592
6514514
6514457
6514363
6516085
396644
396260
395746
395121
394750
394339
393931
393568
393393
393389
393389
393158
392764
392327
396641
396643
396209
395743
395428
396525
396536
396609
396707
397101
396685
394339
394346
394337
394103
393792
393567
393384
393516
393996
395287
395659
396364
397033
397026
397298
394715
394493
394875
395052
395388
394337
SiO2(Calc.)
Drilled Comp.
SiO2(Calc.)
Al2O3 CaO Fe 2O3 K2O MgO Na2O TiO2 LOI1000C
Depth Depth
+LOI1000C
m
6
6
6
9
10
12
15
15
15
15
36
18
15
21
10
9
15
6
9
9
9
12
15
11
9
9
6
9
12
12
12
14
18
9
9
7
10
6
6
12
9
9
15
9
7
9
m
1
6
4
5
6
12
14
3
10
9
21
12
11
15
7
8
6
4
5
4
4
9
12
11
7
7
4
7
9
10
10
12
17
5
6
5
5
4
6
12
6
7
3
5
4
7
%
99.63
99.56
99.43
99.61
99.70
99.71
99.06
99.57
99.34
99.63
99.44
99.68
99.45
99.41
99.25
99.47
99.63
99.30
99.57
99.59
99.60
99.68
99.79
99.18
99.17
99.74
99.47
99.68
99.73
99.76
99.80
99.68
99.45
98.92
99.71
99.56
98.75
98.97
99.59
99.46
99.56
99.55
99.58
99.50
99.69
99.63
%
99.73
99.64
99.63
99.78
99.84
99.82
99.61
99.84
99.71
99.82
99.65
99.82
99.76
99.69
99.64
99.73
99.78
99.66
99.76
99.86
99.83
99.85
99.88
99.69
99.74
99.86
99.84
99.89
99.86
99.87
99.90
99.85
99.72
99.71
99.89
99.84
99.73
99.70
99.78
99.80
99.85
99.80
99.85
99.80
99.86
99.84
7.8
99.51
99.78
ppm ppm ppm ppm ppm ppm
350 203 600
65 63
53
982 X
600 550 61
78
1,128 X
500 476 61
72
553 X
480 135 53
29
303 X
300
25 45
22
329 X
308
26 53
11
2,013
7 315
57 44
18
408 X
300
53 62
15
1,477 X
320
79 49
45
276 X
356
19 30
5
1,574
6 748 160 41
35
464 X
350
91 33
19
521
X
400
43 57
16
1,173 X
547
22 38
3
1,062
44 371 406 77
54
888
25 213 254 55
17
624 X
200 260 46
26
1,588 X
125 201 67
25
688 X
320
83 59
8
381 X
X
37 65 X
436 X
75
48 69 X
345 X
100
62 29 X
296 X
67
74 11 X
1,828 X
145
15 22 X
956
18 143
34 33 X
268 X
71
6
7 X
373
29 100
24 42 X
277 X
57 X
28
12
329 X
244 X
30 X
298 X
70
16 17
4
180 X
80 X
X
X
446
10 142
18 13
9
1,152 X
629
44 27
12
1,321 X
140
10 58
8
250 X
33 X
21 X
507
26
X
46 42
27
825
60 140 264 71
57
1,087
74 225 185 72
41
711 X
200 115 34
50
486
21 233
32 63
40
229
19 167 X
45 X
821
17 129
80 37
14
529 X
X
X
31
13
434
28 440
28 44
10
460
30
50
35 60 X
509
16
43
22 35 X
ppm
1,314
1,261
1,480
944
855
1,004
1,441
740
928
1,095
895
764
1,298
1,275
1,609
1,262
1,073
1,341
1,249
889
1,085
951
693
1,085
1,384
1,006
1,032
716
765
858
759
815
949
1,305
828
938
1,226
1,307
1,116
1,090
1,007
851
961
975
765
999
%
0.10
0.09
0.20
0.17
0.15
0.11
0.54
0.27
0.37
0.19
0.21
0.15
0.31
0.28
0.39
0.26
0.15
0.36
0.18
0.28
0.23
0.17
0.10
0.51
0.57
0.13
0.37
0.21
0.13
0.12
0.10
0.17
0.27
0.79
0.18
0.28
0.98
0.73
0.18
0.35
0.29
0.26
0.27
0.30
0.17
0.21
1,030
0.27
* X = bel ow detecti on l i mi t
Average Composite Depth
774
8
Table 1: Aircore Drill results
277
81
39
17
Hand Auger
Hand auger drilling was completed by Ventnor personnel using a 100mm screw auger to take
1m downhole samples. Drilling encountered unconsolidated sand and was terminated when
the hole collapsed or when an iron rich layer was intersected. The high grade downhole
composites from the drilling are shown in Table 2. Figure 3 shows the hole positions,
coloured by grade ranges, displayed as stars. The high-grade composites in Table 2 were
calculated using either the 1m sample, or a 99% SiO2 lower cut-off grade, with a maximum of
2m of internal dilution. It should be noted that the full depth of high grade sand was not
always tested due to hole collapse during auger drilling.
Hole ID MGA_Nth MGA_East
MA001
MA002
MA003
MA004
MA005
MA007
MA008
MA009
MA010
MA011
MA012
MA013
MA014
MA015
MA016
MA017
MA018
MA019
MA020
MA021
MA022
MA023
MA024
MA025
MA026
MA027
MA028
MA029
MA030
MA031
MA032
MA033
MA034
MA035
MA036
MA037
MA038
MA039
MA040
MA041
MA042
MA044
MA046
SiO2(Calc.)
Drilled Comp.
SiO2(Calc.)
Al2O3
Depth Depth
+LOI1000C
m
6
6
6.2
6
8
4.2
6
4.1
4.5
6
4.1
4.1
5.5
6
7
7
8
2
6
5.8
3.8
6
3.5
3.9
3.95
6
5.95
6
5.5
4.2
4.9
2.5
4
3.8
4.6
6
6
6
1.8
4.5
4.9
9
30
m
6
1
1
6
8
4.2
6
4
2
2
4
4
5.5
6
7
7
8
2
6
5.8
3.8
6
3
1
3.95
6
5.95
6
5.5
4.2
4.9
2.5
4
3.8
4.6
6
6
6
1.8
4.5
4.9
3
6
%
99.63
98.61
98.75
99.40
99.12
99.38
99.22
99.23
99.53
99.27
99.75
99.67
99.59
99.67
99.74
99.56
99.70
99.50
99.69
99.74
99.58
99.68
99.65
97.42
99.57
99.74
99.68
99.64
99.74
99.66
99.64
99.48
99.65
99.60
99.72
99.66
99.73
99.64
99.23
99.76
99.73
99.69
99.67
%
99.82
99.13
99.30
99.71
99.41
99.84
99.63
99.67
99.78
99.79
99.88
99.87
99.81
99.91
99.90
99.90
99.92
99.88
99.91
99.91
99.89
99.84
99.87
98.34
99.87
99.89
99.86
99.91
99.91
99.85
99.88
99.82
99.88
99.86
99.90
99.87
99.90
99.87
99.60
99.91
99.87
99.84
99.87
Average Composite Depth
4.6
99.58
99.82
6512891
6512861
6512892
6512674
6513041
6512919
6512471
6512993
6513249
6512439
6511292
6511297
6511312
6511166
6511426
6512407
6512102
6512586
6511710
6514496
6514870
6514975
6515093
6513222
6514002
6514873
6515301
6517289
6514665
6514314
6514456
6511707
6516082
6516234
6516392
6516755
6516009
6515507
6513432
6513121
6513480
6512731
6514757
392252
391793
392784
393383
393387
393785
393977
394560
394874
393991
393842
394618
395392
395829
396210
396602
396043
395377
395955
393398
392668
392004
391544
391878
392039
393405
393393
393389
393943
393806
395053
394656
392885
392482
391866
392059
391684
392284
393933
392554
392860
394297
393408
CaO Fe 2O3 K2O MgO Na2O TiO2 LOI1000C
ppm ppm ppm ppm ppm ppm ppm
367
27
350
53
70
63
887
6,505 121
700 350 101
86
846
4,920 114
400 433
95 108
871
1,119
37
533 121
83
79
952
4,122
13
263 788
64
95
513
292 133
100
22
90
69
891
1,881
30
117 324
67
71 1,207
1,294
42
100 253
69
66 1,485
643
55
250 153
69
62
975
706
84
100
88
62
46
993
328 X
X
40
26
32
741
260
36
50
11
53
34
881
269
26
333
22
49
37 1,174
194
22
X
X
57
36
564
192
15
X
6
23
29
706
202
25
X
X
43
39
684
185 X
X
X
7
16
611
269 X
X
X
47
45
824
175
17
X
X
17
28
604
217
24
50
11
16
38
513
244
42
X
19
39
48
662
516
23
233
96
10
41
647
315 X
67
73
31
47
732
13,627 156 1,000 499
96
80 1,086
362
37
100
47
39
46
702
239
25
117
24
10
23
610
209
26
217 X
18
27
930
216
34
X
9
12
43
545
196
23
X
X
26
43
576
526
21
180
86
48
56
569
210
21
40 X
30
46
864
351
66
133
86
57
68 1,022
264 X
50
26
22
54
810
242
33
200
17
36
53
778
214
26
60 X
32
48
646
205
21
200 X
18
36
762
206
26
X
X
41
49
699
212
27
X
X
41
53
930
1,904 X
350 507
53
81 1,056
228 X
40
44
9
48
526
339
28
140
42
11
53
630
383 X
X
42 X
46 1,083
376
41
X
19
19
37
825
%
0.19
0.52
0.55
0.31
0.29
0.45
0.41
0.43
0.25
0.53
0.14
0.20
0.22
0.24
0.16
0.34
0.22
0.38
0.22
0.17
0.32
0.16
0.22
0.92
0.29
0.16
0.18
0.28
0.17
0.19
0.24
0.34
0.23
0.26
0.17
0.21
0.17
0.23
0.38
0.15
0.14
0.15
0.20
* X = bel ow detecti on l i mi t
660
28
117
Table 2: Hand Auger Drill results
81
37
48
770
0.24
Twinned holes
Three Auger holes were twinned by aircore drilling to validate the hand auger as a robust
means of sampling the in situ resource, in the absence of aircore drilling. The comparisons
of the drilling results are shown in Table 3, below. The averages of the twin sampled depth
are considered robust enough to validate the auger sampling method.
From To SiO2 Calc
SiO2 Calc
+LOI 1000C
SiO2 Calc
SiO2 Calc
+LOI 1000C
From To SiO2 Calc
MA017 (Auger) MAC023 (AC)
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10 11
11 12
12 13
Twin Ave.
99.10
99.75
99.32
99.68
99.53
99.70
99.80
99.56
99.89
99.89
99.90
99.88
99.91
99.90
99.92
99.90
99.66
99.68
99.72
99.69
99.84
99.85
99.88
99.92
99.84
99.86
99.82
99.67
98.64
99.76
99.89
99.89
99.89
99.89
99.92
99.92
99.92
99.93
99.89
99.88
99.86
99.74
99.21
99.90
SiO2 Calc
+LOI 1000C
SiO2 Calc
SiO2 Calc
+LOI 1000C
From To SiO2 Calc
MA029 (Auger) MAC032 (AC)
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10 11
11 12
12 13
13 14
Twin Ave.
98.57
99.86
99.85
99.83
99.88
99.83
99.64
99.91
99.93
99.92
99.92
99.91
99.89
99.91
99.28
99.70
99.81
99.80
99.17
99.65
99.88
99.83
99.81
99.77
99.76
99.70
94.88
90.45
99.57
99.87
99.88
99.90
99.90
99.64
99.82
99.91
99.91
99.92
99.83
99.84
99.83
98.09
95.40
99.84
SiO2 Calc
+LOI 1000C
SiO2 Calc
SiO2 Calc
+LOI 1000C
MA032 (Auger) MAC044 (AC)
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
Twin Ave.
99.34
99.60
99.75
99.74
99.74
99.87
99.88
99.87
99.90
99.86
99.64
99.88
98.80
99.68
99.60
99.71
99.74
90.00
91.85
92.74
93.71
99.51
99.61
99.84
99.87
99.87
99.84
95.64
96.81
96.30
96.04
99.81
Table 3: Twinned drilling results
Exploration Target
Based on these results the Company has developed Exploration Targets for the Muchea
Silica Sand Project. These are:
•
Aircore drill area – 70 Million to 125 Million tonnes silica sand with a grade in excess
of 99.5% SiO2.
•
Auger drill area – 100 Million to 150 Million tonnes silica sand with a grade in excess
of 99.5% SiO2.
The potential quality and grade of these Exploration Targets are conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource. It is uncertain
if further exploration will result in the estimation of a Mineral Resource.
The Exploration Targets have been quantified by using the following criteria and assumptions:
Aircore drill area
•
37 drill holes (AC drillholes only)
•
Exploration Target area 835 ha
•
1.66t/m3 in situ bulk density (independently determined)
•
Between 80% and 100% of area contains high grade silica sand
•
Depth of high grade sand between 6 to 9 metres
Auger drill area
•
50 drill holes (includes 10 aircore and 40 hand auger drillholes)
•
Exploration Target area 1,800 ha
•
1.66t/m3 in situ bulk density (independently determined)
•
Between 80% and 100% of area contains high grade silica sand
•
Depth of high grade sand of 4 to 5 metres
•
It should be noted that auger drilling did not test the full depth of high grade sand in all
holes due to hole collapse, and the depth of high grade sand may be deeper in some
areas.
The dry in situ bulk density has been measured by an independent contractor using a nuclear
densometer at 4 sites, with the arithmetic average used in the determination of the
Exploration Target.
A grade of 99.5% SiO2 is a critical grade for glassmaking quality sand. Drill results indicate an
in situ grade in excess of this quality, and it is expected that further processing will increase
this grade to provide high-value sand for speciality glass.
Quality Control Data
The Company has been validating a high-purity silica standard that was created for the
Company by OREAS Pty Ltd. This was required as there is no commercial standard
available for high purity silica sand. The standard was “round robin” assayed at several
laboratories in Perth prior to the commencement of drilling. The standard was then included
in the drill sample submissions to Intertek, in sequence, on a ratio of 1:20. Field duplicate
samples were submitted in a ratio of 1:20. In addition to the duplicates the laboratory
routinely repeated analysis from the pulverised samples in a ratio of 1:25. The number of
QA/QC samples represents ~14% of the total assays.
A full analysis of all the quality control data has now been assessed. This analysis validates
the drill assay dataset and conforms with the guidelines for reporting under the JORC-2012
code.
Reduced Level
The reduced level (RL) of the drilling collars is generated from publicly available SRTM data.
SRTM topography is known to have localised precision issues, which preclude it from being
used for a volume measurement as part of a mineral resource estimation. The Company
intends to acquire high accuracy Light Imaging, Detection And Ranging data (LiDAR), which
has the necessary precision and accuracy for a Mineral Resource estimation.
Further Work Required
Metallurgical testwork will determine the best quality products available from the project with
low deleterious minerals and highest SiO2 grade that can be produced from the bulk resource.
This will determine if the bulk resource can be declared as a Mineral Resource under the
JORC-2012 guidelines.
The drilling results reported in this announcement demonstrate the major impurities are TiO2,
Al2O3 and Fe2O3. Given Ventnor’s experience with testwork completed at its Arrowsmith Silica
Sand Project, it is expected that a significant amount of these impurities may be removed
using conventional sand processing techniques such as gravity separation by spirals,
attritioning, sizing and magnetic separation. It is believed that the in situ resource could be
processed to achieve a product grade higher than 99.9% SiO2 + LOI1000C.
Further information:
Bruce Maluish
Managing Director
Ventnor Resources
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
Competent Person’s Statement
The information in this release that relates to exploration results and exploration targets is based on,
and fairly represents, information compiled by Mr David Reid who is a Member of the Australian
Institute of Geoscientists (MAIG). Mr Reid is a contractor to Ventnor Resources Limited. Mr Reid has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the “2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves.”
Mr Reid consents to the inclusion in this release of the matters based on information provided by him
and in the form and context in which they appear.
APPENDIX A – JORC 2012 Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
techniques
JORC Code explanation
•
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
Aspects of the determination of mineralisation that are
Material to the Public Report.
•
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
•
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, face-
Commentary
•
AC drilling samples are 1m down hole intervals with sand
collected from a cyclone mounted rotary cone splitter, ~2-3kg
(representing 50% of the drilled sand) was collected. Two subsamples, A and B, of ~200g were taken from the drill samples.
The remainder was retained for metallurgical testwork.
•
Auger drilling samples are 1m down hole intervals with sand
collected from a plastic tub which received the full sample,
~8kg, from the hole. The sand was homogenised prior to sub
sampling, two sub-samples, A and B, of ~200g were taken
from the drill samples. A bulk sample of ~5kg was retained for
each 1m interval for metallurgical testwork.
•
The “A” sample was submitted to the Intertek Laboratory in
Maddington, Perth for drying, splitting (if required),
pulverisation in a zircon bowl and a specialised silica sand 4
Acid digest and ICP analysis.
•
All auger samples were weighed to determine if down hole
collapse was occurring, if the samples weights increased
significantly the hole was terminated to avoid up hole
contamination.
•
The targeted mineralisation is unconsolidated silica sand
dunes, the sampling techniques are considered to be “industry
standard”.
•
Due to the visual nature of the material, geological logging of
the drill material is the primary method of identifying
mineralisation.
•
Vertical NQ sized aircore drilling was completed by Wallis
Drilling using a Landcruiser mounted Mantis 82 drill rig.
Criteria
Drill sample
recovery
JORC Code explanation
Commentary
sampling bit or other type, whether core is oriented and if so,
by what method, etc).
•
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
Aircore
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
A 100mm diameter hand screw auger was used to drill until
hole collapse.
•
Visual assessment and logging of sample recovery and
sample quality
•
Reaming of hole and clearance of drill string after every 3m
drill rod
•
Sample splitter and cyclone cleaned regularly to prevent
sample contamination
•
No relationship is evident between sample recovery and grade
Hand Auger
Logging
Sub-sampling
techniques
and sample
preparation
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
•
Whether logging is qualitative of quantitative in nature. Core
(or costean, channel, etc) photography.
•
The total length and percentage of the relevant intersections
logged.
•
If core, whether cut or sawn and whether quarter, half of all
core taken.
•
If non-core, whether fiffled, tube-sampled wet or dry.
•
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
•
All material recovered from the hole is collected in a plastic
drum and weighed, the weights are used to determine when
the hole is collapsing, and drilling is terminated.
•
No relationship is evident between sample recovery and grade
•
Geological logging of drill samples is done by the field
geologist with samples retained in chip trays for later
interpretation.
•
Logging is captured in an excel spreadsheet, validated and
uploaded into an Access database
•
AC drill samples are rotary split 50:50 into a calico bag
resulting in 2-3kg of dry sample, 2 x 200g sub-samples, A and
B, are taken from the drill sample. The A sample is submitted
to the laboratory and the B sample is retained for repeat
analysis and QAQC purposes. The bulk sample is retained for
later metallurgical testwork.
Criteria
Quality of
assay data and
laboratory
tests
JORC Code explanation
•
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
•
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicates/second-half sampling.
•
Whether sample sizes are appropriate to the grain size of the
material being sampled.
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their deviations, etc.
•
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Commentary
•
Auger drill material, ~8kg, is collected in a plastic tub and
homogenised, 2 x 200g sub-samples, A and B, are taken from
the drill material. The A sample is submitted to the laboratory
and the B sample is retained for repeat analysis and QAQC
purposes. A 5kg bulk sample is retained for later metallurgical
testwork.
•
The sample size is considered appropriate for the material
sampled.
•
The 200g samples are submitted to the Intertek Laboratory in
Maddington, Intertek use a zircon bowl pulveriser to reduce
the particle size to -75um.
•
Samples were submitted for analysis to the Intertek
Laboratory in Maddington in Perth WA. The assay methods
used by Intertek are as follows: multi-elements are determined
by a specialised four-acid digest including Hydrofluoric, Nitric,
Perchloric and Hydrochloric acids in Teflon tubes. Analysed
by Inductively Coupled Plasma Mass Spectrometry, silica is
reported by difference.
•
The assay results have also undergone internal laboratory
QAQC, which includes the analysis of standards, blanks and
repeat measurements.
•
The Company has been validating a high-purity silica standard
that was created for the Company by OREAS Pty Ltd. This
was required as there is no commercial standard available for
high purity silica sand. The standard was “round robin”
assayed at several laboratories in Perth prior to the
commencement of drilling.
•
The standard was then included in the drill sample
submissions to Intertek, in sequence, on a ratio of 1:20. Field
duplicate samples were submitted in a ratio of 1:20 and in
addition to this Intertek routinely duplicated analysis from the
pulverised samples in a ratio of 1:25. The number of QAQC
samples therefore represents ~14% of the total assays.
Criteria
Verification of
sampling and
assaying
Location of
data points
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
JORC Code explanation
Commentary
•
A full analysis of all the quality control data has been
undertaken. This analysis validates the drill assay dataset and
conforms with the guidelines for reporting under the JORC
2012 code.
•
Significant intersections validated against geological logging
•
Twinned holes AC Vs Auger were completed validate the
robustness of hand auger as an appropriate method of testing
the in-situ sand. Assay comparisons shown an acceptable
correlation between the 2 drilling methods.
•
Drill hole locations were measured by hand-held GPS with the
expected relative accuracy; GDA94 MGA Zone 51 grid
coordinate system is used. The reduced level (RL) of the
drilling collars is generated from publicly available SRTM data.
•
SRTM topography is known to have localised precision issues
which preclude it from being used for a volume measurement
as part of a mineral resource estimation. The Company
intends to acquire high accuracy light imaging, detection, and
ranging data (LiDAR), which has the necessary precision and
accuracy for Mineral Resource estimation.
•
The verification of significant intersections
independent of alternative company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other location used in Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
•
Drill holes were spaced 400-800m apart along existing tracks.
•
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied
•
It is believed that due to the relatively low variability of assays
between drill holes that the current spacing maybe sufficient
for the estimation of a Mineral Resource.
•
•
No sample compositing (down hole) has been done.
Whether sample compositing has been applied.
•
Whether the orientation is sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
•
Sampling is being done on aeolian sand dunes the auger
orientation is therefore considered appropriate.
•
If the relationship between the drilling orientation and the
by
either
Criteria
JORC Code explanation
Commentary
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample
security
Audits or
reviews
•
•
The measures taken to ensure sample security.
The results of any audits or reviews of sampling techniques
and data.
•
All sample
Share your feedback
Discover