Half Yearly Report and Accounts
Released
Released
Announcement PDF
VRX SILICA LIMITED
ABN 59 142 014 873
INTERIM FINANCIAL REPORT
FOR HALF-YEAR ENDED
31 DECEMBER 2019
CORPORATE DIRECTORY
DIRECTORS
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
SECRETARY
John Geary
REGISTERED AND PRINCIPAL OFFICE
Level 1, 6 Thelma Street
West Perth WA 6005
Telephone: (08) 9226 3780
Facsimile: (08) 9226 3764
SHARE REGISTRY
Computershare Investor Services Pty Ltd
Level 11, 172 St George's Terrace
Perth WA 6000
Telephone: (08) 9323 2000
Facsimile: (08) 9323 2033
AUDITORS
RSM Australia Partners
Level 32, Exchange Tower
2 The Esplanade
Perth WA 6000
AUSTRALIAN SECURITIES EXCHANGE
VRX Silica Limited shares (VRX) are listed on the
Australian Securities Exchange
VRX Silica Limited
1
DIRECTORS’ REPORT
Your directors submit the financial report of the consolidated entity for the half-year ended 31 December
2019. In order to comply with the provisions of the Corporations Act 2001, the directors report as follows:
DIRECTORS
The names of the Directors who held office during or since the end of the half-year and until the date of
this report are noted below. Directors were in office for this entire period unless otherwise stated:
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
PRINCIPAL ACTIVITIES
The principal continuing activities during the half-year of entities within the consolidated entity was
mineral exploration.
REVIEW OF OPERATIONS
The net loss for the half-year attributable to members of VRX Silica Limited was $1,379,165 (2018: loss
of $2,259,284).
Exploration and Project Development
Highlights of the activities conducted by VRX Silica Ltd during the half year ending 31 December 2019
were:
•
•
•
•
Arrowsmith North Mineral Resource Estimate Upgrade followed by Arrowsmith North BFS and
Maiden Ore Reserve
Arrowsmith Central Mineral Resource Estimate Upgrade followed by Arrowsmith Central BFS
and Maiden Ore Reserve
Executed a Strategic Alliance with China Southern Glass
Muchea BFS and Maiden Ore Reserve
The announcements for mineral resource estimate upgrades at the Arrowsmith North and Arrowsmith
Central Silica Sand Projects were followed by a Bankable Feasibility Study (BFS) and Maiden Ore
Reserve announcements for each of the projects and later in the period by a BFS and maiden Probable
Ore Reserve at the Muchea Silica Sand Project.
VRX Silica Limited
2
DIRECTORS’ REPORT
ARROWSMITH NORTH PROJECT
Arrowsmith North Mineral Resource Estimate Upgrade
The Arrowsmith North Silica Sand Project (Arrowsmith North) is located 270km north of Perth, WA
(see Figure 1). The maiden Mineral Resource Estimate (MRE) 1 previously reported for Arrowsmith
North was based on a shallow hand auger drilling 2 program.
This was followed by an aircore drill program completed during March 2019 and the receipt of the
analytical results from this program enabled the Company to upgrade the MRE on 9 July 2019 to 771
Mt @ 98.0% SiO2 3. This is comprised of an Indicated Resource estimate of 248 Mt @ 97.7% SiO2 and
an Inferred Resource estimate of 523 Mt @ 98.2% SiO2 which was an overall increase of 398% on the
maiden MRE (see Tables 1 and 2 below). All Mineral Resources are reported in accordance with the
2012 edition JORC Code 4.
The MRE included an unpredicted 313 million tonnes of higher grade white sand at 98.7% SiO2. The
resulting model defined two different sand types, “Yellow” and “White” sand (Tables 1 and 2) which
differ with respect to their chemistry and particle size distribution.
The Indicated Resource is predominately within the Mining Lease application area which is within the
100% VRX Silica owned and granted tenements E70/5109 and E70/5027. The majority was
subsequently converted to Probable Ore Reserves (see below) and supports the Company’s continued
assessment of Arrowsmith North being an extremely long-life mining project with world-class potential.
No more drilling is required prior to the Company commencing mining operations.
The MRE allows for a Mining Reserve to be estimated following the completion of a positive feasibility
study. The mining depth in the Arrowsmith North Project area is limited to mining above the water table,
which is 10 metres below the drilled depths and below the Resource. Additionally, the top half metre of
topsoil has been discounted in the MRE as it will be used for rehabilitation.
VRX Silica will undertake a further testwork program on the white sand, however metallurgical testwork
completed to-date confirms this updated silica sand resource is considered readily amenable to
upgrading by conventional washing and screening methods to produce a high-grade silica sand product
with high mass recoveries. The high-grade silica sand product specifications are expected to be suitable
for industries such as the glass making, foundry and ceramics industries.
1ASX announcement of 2 October 2018, “Arrowsmith North Maiden Mineral Resource.”
2ASX announcement of 13 March 2019, “Drilling at Muchea and Arrowsmith Silica Sand Projects.”
3ASX announcement of 9 July 2019, “Arrowsmith North Mineral Resource Estimate Upgrade.”
4 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
VRX Silica Limited
3
DIRECTORS’ REPORT
Figure 1:
VRX Silica Limited
Arrowsmith North Project Location
4
DIRECTORS’ REPORT
Figure 2: Arrowsmith North Project schematic geology map showing MRE with separate drill type, Black
dots = aircore, Blue dots = auger
Figure 2 above shows the drill coverage over the tenements with the underlying sand types shown.
Classification
Indicated
Inferred
Indicated +
Inferred
Domain
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
Million
Tonnes
33
215
248
280
243
523
313
458
771
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
98.7
97.5
97.7
98.7
97.7
98.2
98.7
97.6
98.0
0.50
1.10
1.00
0.50
1.00
0.80
0.54
1.08
0.86
0.20
0.40
0.40
0.10
0.40
0.30
0.15
0.40
0.30
0.20
0.20
0.20
0.20
0.20
0.20
0.18
0.17
0.17
0.20
0.50
0.50
0.20
0.50
0.40
0.24
0.52
0.41
*Note: Interpreted silica sand mineralisation is domained above a basal surface wireframe defined based on drill
logging data. The upper (Topsoil) layer within 0.5 m of surface is depleted from the modelled silica sand unit, being
reserved for rehabilitation purposes. All classified silica sand blocks in the model are reported. Differences may occur
due to rounding.
Table 1:
VRX Silica Limited
Arrowsmith North Silica Sand Mineral Resource Estimate as at July 2019
5
DIRECTORS’ REPORT
Classification
Indicated
Inferred
Indicated +
Inferred
Domain
Maiden
MRE (Mt)
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
44
149
194
44
149
194
Updated
MRE (Mt)
33
215
248
280
243
523
313
458
771
Difference
633%
163%
270%
708%
307%
398%
Table 2: Tonnage Comparison with Prior estimate
Arrowsmith North BFS and Maiden Ore Reserve
On 28 August 2019 VRX Silica announced details of its BFS and maiden Probable Ore Reserve at
Arrowsmith North 5.
Financial model
Based on capital and operating cost estimates a financial model was developed to evaluate the
economics of the Arrowsmith North project. Key outcomes from the BFS and summary financial model
outputs are set out below.
Notes:
Post Tax, ungeared NPV10
Post Tax, ungeared NPV20
Post Tax, ungeared IRR
Payback period (yrs) (post tax) (ramp up
Exchange Rate US$/A$
Life of Mine (yrs) (Scope of BFS)
EBIT
Total Sales (initial 25 years) (no escalation)
Cashflow after finance and tax
Capex (2 mtpa)
Capex contingency (inc)
Life of Mine C1 costs, FOB Geraldton (inc
Tonnes Processed (initial 25 years) (Mt)
Production Target (initial 25 years) (Mt)
Probable Ore Reserves @ 99.7% SiO2 (Mt)
Ore Reserve life (yrs)
JORC Resources (million tonnes)
$242,300,000
$99,800,000
79%
2.4
$0.70
25
$1,144,000,000
$2,773,000,000
$835,000,000
$28,260,000
20%
$30.18
53
47.7
204
102
771
1. The Ore Reserve underpinning the above production target has been prepared by a
Competent Person in accordance with the requirements of the JORC Code.
2. The material assumptions for the BFS are set out below. All such material assumptions
continue to apply and have not materially changed.
3. All figures are presented in Australian dollars, unadjusted for inflation
5 ASX announcement of 28 August 2019, “Arrowsmith North BFS and Maiden Ore Reserve.”
VRX Silica Limited
6
DIRECTORS’ REPORT
Key points and assumptions
The BFS is based on only 25 years production from a considerable potential +100 year mine life. The
project will be a potentially new long-term industry for Western Australia with substantial economic
benefits, including long-term employment and royalties with a significant economic contribution to the
local and Mid West region. The Company has received great support for the project at meetings with
the local Shires, Mid West Development Commission, Mid West Chamber of Commerce & Industry and
various local Members of State and Federal Parliament.
The Company has engaged with the Department of Water and Environmental Regulation following
preliminary environmental studies to identify key issues pertaining to the project environmental
approvals for mining particularly the habitat for potential foraging by Red Tail and Carnaby’s black
cockatoos.
VRX Silica has developed a mining and rehabilitation methodology specific to the environment at
Arrowsmith North which will enable a successful restoration of mined areas.
Key economic assumptions for the Arrowsmith North BFS are as follows:
Currency
Australian dollars
Sales contracts in Asia for silica sand are invariably based $US and a
A$0.70 exchange rate has been applied
Project life
25 years
Total probable Ore Reserve is well in-excess of this time period,
however the model is conservatively restricted to 25 years
Depreciation
15% rate on capital
Corporate tax rate
27% on taxable profit
Production
Steady state of production from Probable Ore Reserves over life of mine,
with the first 3 years at 1 million tonnes per year and thereafter at 2
million tonnes per year
The Company has currently expressions of interest and letters of intent
to purchase 1.5 million tonnes per year of Arrowsmith North products
and expects further interest once these products are made available to
the market
Shares on Issue
404,318,617
NPV estimation discount
rates
Standard financial modelling conducted at both 10% and 20% discount
rates.
The 20% rate is generally above standard reporting rates but
demonstrates that the Project is still financially robust at this higher rate
Capital cost
Based on estimates ±15% from engineering companies with extensive
experience in sand separation
Operating costs
A$30.18 C1 costs, including royalties
Based on first principles and current rates for equipment
Sales revenue
US$35-53 per dry metric tonne dependent on product type, product
quality, contract terms and quantity
Revenue is constant based on current prices and ignores any projected
growth in prices
Maximum debt
A$26 million
Borrowing rates
12%
Accounts receivable
30 days
VRX Silica Limited
7
DIRECTORS’ REPORT
Accounts payable
30 days
Plant maintenance
5% of capital cost per year
Environmental bond
A$500,000
May be substituted by the WA Department of Mines, Industry Regulation
and Safety’s “Mining Rehabilitation Fund”
Capex contingency
20%
Recoveries
N40 (Foundry ASF 40)
40%
N20 (Foundry ASF 20)
24%
NF400 (Glass 400 ppm Fe2O3) 20%
Recoveries are based on CDE testwork at ±5%
Probable Ore Reserve
Table 3 below details the Probable Ore Reserve that will be produced from the mining of the Indicated
Mineral Resource and processing in a purpose built, wet sand processing plant.
The plant will produce four saleable products for different markets with a total Probable Ore Reserve of
223Mt, with 204Mt contained within the mining lease application MLA70/1389.
Global
Chemical Composition
Product
Recovery
Million
Tonnes
Arrowsmith-N20
24%
Arrowsmith-N40/
NF500
Local Market
Classification
Probable
Within MLA70/
1389
Million Tonnes
SiO2
%
Al2O3
%
Fe2O3
%
TiO2
%
LOI
%
60
54
99.7
0.2
0.05
0.035
0.1
60%
149
136
99.7
0.2
0.05
0.035
0.1
6%
15
14
223
204
140 /
106
200 /
75
Total Reserve
Particle Size
Sieve Opening (Mesh/μm Retained)
Product
10 /
2mm
20 /
850
30 /
600
40 /
425
50 /
300
70 /
212
100 /
150
Arrowsmith-N20
0.10%
3%
87%
8%
1%
0.10%
-
Arrowsmith-N40
-
0%
21%
36%
24%
13%
Arrowsmith-NF500
-
-
0.50%
40%
42%
Local Market
-
-
-
-
-
AFS
No
-
-
5%
1%
0%
36
17%
1%
0%
-
38
-
64%
22%
14%
-
21
Table 3: Arrowsmith North Silica Sand Probable Ore Reserve as at July 2019
VRX Silica Limited
8
DIRECTORS’ REPORT
Metallurgical Factors
As a part of the upgraded MRE, CSA Global reviewed the metallurgical testwork to comply with Clause
49 of the JORC Code. CSA Global has concluded that the available process testwork indicates likely
product qualities for glass, ceramics and foundry sand are considered appropriate for eventual economic
extraction from Arrowsmith North. Favourable logistics and the location of the project support the
classification of Arrowsmith North (in accordance with Clause 49) as an industrial mineral with an
Inferred/Indicated Mineral Resource
The extensive metallurgical testwork which has been completed by CDE Global at their facility in
Cookstown, Northern Ireland, and Nagrom in Kelmscott, Perth, allowed for the creation of a catalogue
of silica sand products that could be produced from Arrowsmith North 6 (see Table 3).
A key challenge for industrial minerals projects is meeting market specifications. The silica sand market
has specifications for parameters such as purity (e.g. SiO2 content) in addition to tight specifications for
trace elements such as Fe, Ti, Al and Cr in the glass industry. The Company is confident that it can
meet these specifications from Arrowsmith North.
Chemical Composition (%)
Product
Industry
SiO2
Al2O3
Fe2O3
TiO2
CaO
MgO
K2O
Arrowsmith-N20
Foundry
99.7
0.20
0.050
0.035
0.010
0.002
0.030
Arrowsmith-N40
Foundry
99.7
0.20
0.050
0.035
0.010
0.002
0.030
Arrowsmith-NF500
Glass
99.7
0.20
0.050
0.035
0.010
0.002
0.030
Particle Size
Product
Arrowsmith-N20
10 /
2mm
0.1%
Arrowsmith-N40
ArrowsmithNF500
20 /
850
3%
Sieve Opening (Mesh/μm Retained)
30 /
40 /
50 /
70 /
100 /
600
425
300
212
150
87%
8%
1%
0.1%
140 /
106
200 /
75
AFS
No
21
0%
21%
36%
24%
13%
5%
1%
0%
36
0.5%
40%
42%
17%
1%
0%
Table 4: Arrowsmith North saleable products from catalogue
Table 5 shows the recovered products which make up the Probable Ore Reserve. The mass balance
of the particle sizes was analysed allowing for the recoveries of these products in a wet processing
plant to be estimated. 7 The recovery of each product is shown in Table 5.
Product
Industry
Recovery
Arrowsmith-N20
Arrowsmith-N40 / NF500
Local Market
Foundry
Foundry / Glass
Fine sand
Total Recovery
24%
60%
6%
90%
Table 5: Arrowsmith North Product Recovery
6ASX announcement of 26 February 2019, “Testwork Update and product Catalogues”.
7ASX announcement of 3 May 2019, “High Recovery from Silica Sand Process Plant Design”.
VRX Silica Limited
9
DIRECTORS’ REPORT
Material Modifying Factors – Mining Factors
The mining method chosen for Arrowsmith North is a rubber wheeled front-end loader, feeding into a 3
mm trommel screen to remove oversize particles and organics. The undersize sand is slurried and
pumped to a sand processing plant located proximal to the Eneabba to Geraldton railway line. After
processing, the silica sand is loaded into railway trucks for bulk export from the Geraldton Port.
Mining of the dune sand will extract to the base of the Indicated Resource/Probable Ore Reserve. This
level is roughly the same as the freehold land boundary on the western side of the mining area and will
leave a slightly undulating surface. On the eastern side of the mining area the sand will slope upward
as a 10% gradient to the top of the adjacent dunes.
100% of the material in the Mining Lease application area is considered to be sand that can be
beneficiated to a saleable silica sand project. The top 500mm has been excluded from the MRE as it
will be reserved for rehabilitation purposes. As there is no waste material, the recovery factor is
considered to be 100% and ore loss therefore is considered to be 0%.
Material Modifying Factors – Environmental Studies
Development location:
•
South of the Yardongo Nature Reserve
•
Approximately 10 km inland of the coast
•
North of the Arrowsmith River (Registered Aboriginal Heritage Site)
•
Outside of World Heritage Areas, National Heritage Places, Ramsar Wetlands, Conservation
Reserves or Commonwealth Marine Reserves
The Probable Ore Reserve is located within an area of deep sands, leached of nutrients. The vegetation
is coastal low scrub heath (known as Kwongan heath). There are relict dune structures which are
represented as low rolling hills.
Assessment Process:
•
Referral submission to the Federal Department of the Environment and Energy (DotEE);
•
Submission of Section 38 referral to State Environmental Protection Authority (EPA)
•
Seek an Accredited Environment Protection and Biodiversity Conservation Act 1999 (Cth)
Assessment under the State Environmental Protection Act 1986 (WA) via an Environmental Review
Document with public comment
•
Undertake any further studies required
•
Submission of Environmental Review Document
Mitigation Strategies
•
Proposed Action lies within a large Development Envelope, allowing for the flexibility to target areas
of lower significance to matters of national environmental significance (MNES)
•
Disturbance will be kept to a minimum, up to 35 ha per year and 14 ha at any one time
•
Progressive rehabilitation using topsoil re-location to ensure topsoil and plants are translocated
intact to previously mined areas
•
Conduct further surveys to identify MNES
•
Use findings to steer the project and avoid MNES where possible
There are no mine tailings storage requirements, there are no waste dumps and processing requires
no chemicals.
VRX Silica Limited
10
DIRECTORS’ REPORT
Material Modifying Factors – Infrastructure
The project is located on unallocated crown land which is east of freehold land and bounded to the
north by a Nature Reserve and South by a proposed Nature Reserve. The west boundary of the project
area is the limit of tenure. The Brand Highway is proximal to the area and access is via the Mount
Adams Road from the north or Brand Highway to the south. The Eneabba/Geraldton rail line lies to the
south west of the project and will be used to transport the processed silica sand to the Geraldton Port
for bulk export.
The project will require its own installed power and water infrastructure and labour will be sourced from
the nearest towns Dongara and Eneabba (approximately 30km from the mine site) and there will be no
accommodation installed at the mine site.
Costs
Operating costs
Operating costs have been determined from first principles and are estimated to include all costs to
mine, process, transport and load product on to ships. They are estimated on 1 million tonnes per year
throughput, with expected unit cost savings if throughput is increased as anticipated to potentially 2
million tonnes per year.
Royalties
The prevailing rate of royalty due to the State is used in the Company’s economic assessments. The
State Royalty rate is A$1.17 per dry metric tonne and reviewed every 5 years with the next review due
in 2020. There are no other royalties payable (including private) though a royalty may be negotiated
with Native Title claimants.
Revenue
Product Quality
Multiple products will be differentiated during processing subject to required particle size distribution by
screening. Recovery of products has been independently assessed by CDE Global, a world leading
silica sand testing laboratory.
Commodity Prices
Commodity prices for silica sand products have been determined by independent industry source
Stratum Resources. The industry standard is that sales contracts are in US dollars. The exchange rate
to convert to Australian dollars will be the prevailing rate at the time of payment.
Subject to final quality produced, the prices for the commodity will range from US$38 to US$58 per dry
metric tonne Free on Board (FOB). There will be no other treatment, smelting or refining charges. There
are no shipping cost estimates with all contracts to be based on FOB rates.
Revenue will be based on a negotiated per shipment basis per dry metric tonne FOB with payment by
demand on an accredited bank letter of credit.
Market Assessment
Industry leader Stratum Resources was commissioned by the Company to prepare an independent
assessment of the current market prices for proposed products. The assessment includes projections
for future demand and supply of silica sand and concludes there is a future tightening of supply of
suitable glassmaking silica sand with a commensurate future increase in price.
VRX Silica Limited
11
DIRECTORS’ REPORT
Sales volumes have been estimated as a result of received letters of intent and expressions of interest
to purchase products.
Economic Factors
The Company’s economic analysis has calculated a 10% and 20% discounted ungeared post tax net
present value (NPV). A 20% discounted NPV has also been calculated to demonstrate the strength of
the economic analysis.
The analysis is based on a 25-year production profile despite the Probable Ore Reserve far exceeding
that project life and has not considered any escalated future product prices nor any inflation to operating
costs. The analysis has used a US$/A$ exchange rate of US$0.70/A$1.00.
The analysis is most sensitive to the exchange rate and sales prices. The analysis indicates the
financials of the project are very robust and there is a high confidence that a viable long-term mining
operation can be justified. Capital requirements are based on independent estimates.
Social Factors
The Company made an application for a mining lease (M70/1389) on 21 December 2018. The
application lies within the Southern Yamatji Native Title claim boundaries (WC2017/002), which
replaced a pre-combination claim (WC2004/002) by the Amangu People. The Company is currently in
negotiations with the claimant group regarding the mining lease application and the Company expects
an agreement will be reached between the parties allowing for the grant of the mining lease. The project
is wholly on unallocated crown land and there is little negative impact on local communities.
Project Funding
The financial model summarised in the BFS sets out the project metrics and provides a basis for the
potential capital structure of the Company for the development of the project. Total capital expenditure
at Arrowsmith North (for a 2 million tonnes per annum processing plant) is estimated at approximately
A$28 million (the BFS details capital cost estimates).
The Company anticipates that the source of funding the capital investment at Arrowsmith North will be
any one, or a combination of, equity, debt and pre-paid offtake from the project. Whilst no final decision
has been made in that regard, the financial model assumes a maximum A$26 million in debt.
The Company has received a number of enquiries and expressions of interest from debt financiers for
the project. The financial model provides for debt capacity and is designed to meet the expectations of
any providers of potential debt funding for their due diligence and other internal requirements.
In addition, VRX Silica has also received enquiries and expressions of interest from organisations
across Asia for silica sand products from the project and holds signed letters of intent for substantial
tonnages. A number of these organisations have expressed interest in becoming a funding partner of
the Company for development of a mine by way of pre-paid offtake arrangements. The balance of the
Company’s capital requirements will be funded from equity capital.
Whilst the envisaged project development requires a low capital intensity relative to a greenfields hard
rock mining project, and any one of, or a combination of equity, debt and pre-paid offtake is planned,
VRX Silica has not as yet secured the required capital. The positive financial metrics of the BFS and
feedback from potential funding partners provides encouragement as to the likelihood of meeting
optimum project and corporate capital requirements.
VRX Silica Limited
12
DIRECTORS’ REPORT
ARROWSMITH CENTRAL PROJECT
Arrowsmith Central Mineral Resource Estimate Upgrade
The Arrowsmith Central Silica Sand Project (Arrowsmith Central) is located 270km north of Perth, WA
(see Figure 3).
Figure 3: Arrowsmith Central Project Location
The air core drill program conducted at Arrowsmith North during March 2019 (see above) also included
Arrowsmith Central.
VRX Silica Limited
13
DIRECTORS’ REPORT
The previously reported maiden MRE for Arrowsmith Central 8 was based on shallow hand auger drilling 9
and the receipt of the air core analytical results enabled the MRE to be upgraded to an Indicated Mineral
Resource of 28.2 Mt @ 96.6% SiO2 in addition to an Inferred Mineral Resource of 48.3 Mt @ 96.9%
SiO2 for a total MRE of 76.5 Mt @ 96.8% SiO2. This was announced to ASX in August 2019. 10 All
Mineral Resources are reported in accordance with the JORC Code (see Tables 5 and 6).
The Indicated MRE is predominately within the Mining Lease application area for Arrowsmith Central
and the Company expects that the majority of the Indicated Mineral Resource will convert to Probable
Reserves and a long-life mining project. The estimation of an Indicated Mineral Resource will allow for
an Ore Reserve to be estimated once a feasibility study is completed.
This Arrowsmith Central MRE complements Arrowsmith North and adds not only to VRX Silica’s total
inventory but will also produce alternative products for the glassmaking and foundry industries in Asia.
Classification
Million
Tonnes
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
Indicated
28.2
96.6
1.7
0.4
0.2
0.7
Inferred
48.3
96.9
1.5
0.4
0.2
0.7
Indicated + Inferred
76.5
96.8
1.5
0.4
0.2
0.7
* Note: Interpreted silica sand layer is domained above a basal surface wireframe defined based
on the drill sampling depths. A depletion zone, consisting of the upper 0.5 m, is reserved for
rehabilitation purposes and is not estimated or reported. Differences may occur due to rounding
Table 5: Arrowsmith Central Silica Sand Mineral Resource Estimate as at July 2019
Classification
Maiden
MRE (Mt)
Indicated
Updated
MRE (Mt)
Difference
28.2
Inferred
28.0
48.3
173%
Indicated + Inferred
28.0
76.5
273%
Table 6: Tonnage Comparison with Prior estimate
The MRE is wholly within granted tenement E70/4987 which is 100% owned by the Company. This
MRE update is based on the results of the most recent drilling, with the initial hand auger drilling being
used to assist in the model estimation. The modelled extents are further limited to within the VRX Silica
nominated Arrowsmith Central target area and based on the geologically logged drill data and with
reference to the publicly available soil mapping data (see Figure 5).
8ASX announcement of 13 December 2019, “Arrowsmith Central Maiden Mineral Resource.”
9ASX announcement of 13 March 2019, “Drilling at Muchea and Arrowsmith Silica Sand Projects.”
10ASX announcement of 15 August 2019, “Arrowsmith Central Mineral Resource Estimate Upgrade.”
VRX Silica Limited
14
DIRECTORS’ REPORT
Based on the soil mapping data the entire Arrowsmith Central target area is underlain by a single mixed
silica sand material unit, which consists of dominant pale deep sands with interspersed yellow sands.
The MRE has been estimated to the bottom of the potentially mineable sand layer with the top half
metre of topsoil having been discounted in the MRE as it will be used for rehabilitation. Figure 4 below
is a representative section through the MRE showing the modelled layer and Figure 5 shows the drill
coverage over the tenements with the underlying sand types shown.
Figure 4: Representative schematic section A – B (See Figure 5), Looking north; 10 times Vertical
exaggeration.
Metallurgical testwork completed to-date confirms this updated silica sand model is considered readily
amenable to upgrading by conventional washing and screening methods to produce a high-grade silica
sand product with high mass recoveries. The high-grade silica sand product specifications are expected
to be suitable for the glass making, foundry and ceramics industries.
Figure 5: Simplified geology of the Arrowsmith Central Area. Figure 15 section line A – B shown.
Tenements as in Figure 1. Auger and AC drill collar locations shown as blue and red points respectively.
VRX Silica Limited
15
DIRECTORS’ REPORT
Arrowsmith Central BFS and Maiden Ore Reserve
VRX Silica announced details of the BFS and maiden Probable Ore Reserve for Arrowsmith Central on
17 September 2019 11.
The Probable Ore Reserve for Arrowsmith Central totals 18.9Mt @ 99.6% SiO2 as reported in
accordance with the JORC Code, with 18.7Mt @ 99.6% SiO2 contained within the area of the Company’s
Mining Lease application (M70/1392) for Arrowsmith Central. Arrowsmith Central is a smaller Resource
than Arrowsmith North but still has the potential to be a very long-life project with additional drilling of
the Inferred Resource expected to be sufficient to realise the production target.
It will produce alternative products to Arrowsmith North and will add to VRX Silica’s available catalogue
of products to be produced.
Financial model
Based on capital and operating cost estimates a financial model was developed to evaluate the
economics of the Arrowsmith Centr
Share your feedback