Arrowsmith North Public Environmental Review Period Commence
Released
Released
Announcement PDF
ASX Announcement
19 June 2023
ARROWSMITH NORTH PUBLIC ENVIRONMENTAL
REVIEW PERIOD COMMENCES
Highlights:
Publication of Environmental Review Document for
Arrowsmith North
Four-week Public Environmental Review period
commences today
VRX Silica Limited (VRX or Company) is pleased to announce
that the Environmental Review Document (ERD) for its
Arrowsmith North Silica Sand Project (Proposal) has been
published and the four-week Public Environmental Review
(PER) period has commenced today.
As announced to ASX on 9 June 2023, the ERD has been
accepted by the Department of Water and Environmental
Regulation (DWER) for publication and release for PER.
Publication of the ERD and commencement of the PER period
is a significant step in Arrowsmith North’s approvals process.
The PER process includes a requirement for VRX to respond
to all comments received in connection with the proposal. This
PER and response process is the final step before the
Environmental Protection Authority of Western Australia (EPA)
prepares an assessment report including recommendations to
the Western Australian Environment Minister on whether the
Proposal should be approved.
A copy of the ERD is available on the VRX website at:
https://vrxsilica.com.au/arrowsmith-north-erd-documents/
Information on the PER is available on the EPA website at:
https://consultation.epa.wa.gov.au/open-forsubmissions/arrowsmith-north-silica-per/
Further information on the proposal is available on the EPA
website at:
https://www.epa.wa.gov.au/proposals/arrowsmith-north-silicasand-project
ASX: VRX
Capital Structure
Shares on Issue:
560.4 million
Unlisted Options:
48.5 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
The Company is actively
assessing other silica
sand projects in
Australia.
This announcement has been authorised for release to ASX by the Managing Director, Bruce
Maluish.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 540
2
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most
advanced pureplay silica sand company listed
on the ASX, developing its 100% owned silica
sand projects at Arrowsmith (North, Brand
and Central), Muchea and Boyatup in
Western Australia.
Silica sand is the most used commodity on
the planet after air and water. It is the main
ingredient in all types of glassmaking,
including specialty solar panel and high-tech
glass, and foundry casting. It is a finite
resource that is running out, with the AsiaPacific region experiencing an ever-growing
supply shortfall that is driving up prices.
Arrowsmith is located 270km north of Perth.
Arrowsmith North boasts a minimum 25-year
mine life capable of producing more than 2Mt
tonnes per year of high-grade (99.7% SiO2)*
silica sand for export to the foundry, container
glass and flat glass markets in Asia, with
permitting well advanced, and will lead
production.
Muchea, located 50km north of Perth, is an
ultra-high-grade (99.9% SiO2)* silica sand
project capable of producing sand required for
ultra-clear glass for solar panels and other
high-tech glass applications.
Boyatup, located 100km east of Esperance, is
under development and capable of producing
sand for the glass market.
*Information relating to grades are extracted from releases to ASX on 28 August 2019 and 11 November 2022 (Arrowsmith
North) and 18 October 2019 (Muchea). The company is not aware of any new information or data that materially affects
this information.
3
Share your feedback
Discover