Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
29 October 2026
September 2026 Quarterly Activities Report
Highlights:
Final regulatory approvals nearing completion for
commencement of works at Arrowsmith North
Arramall farm purchase completed and
preparatory work underway
Land swap proposal at Muchea implemented with
grant of new Mining Lease substantially
increasing tonnage of high-grade silica sand over
an area with lower environmental impact
Nebari invests A$3.5 million and Delphi group an
additional A$1 million ahead of project financing
for Arrowsmith North
VRX Silica Limited (VRX or Company) is pleased to provide this
activities report for the September 2026 quarter.
Arrowsmith Hub
VRX’s 100%-owned Arrowsmith North Silica Sand Project
(Arrowsmith North), located approximately 270km north of Perth,
hosts a globally significant deposit of high-quality silica sand.
The project is underpinned by a JORC-compliant Proved and
Probable Ore Reserve of 221Mt at 99.5% SiO₂, supporting the
potential for long-term production into the foundry, container glass
and flat-glass manufacturing markets, primarily servicing growing
demand in Asia.
Arrowsmith has the potential to establish a new, long-term silica
sand industry in Western Australia, delivering substantial economic
benefits to the State and the Mid West region. These benefits
include sustained direct and indirect employment, royalties, and
regional economic development.
Arrowsmith has key attributes for the foundry resin coated silica
sand market. The final product has single grains (rather than the
usual quartz crystal cluster) which have a clean surface for the
resin to adhere to and particularly high thermal stability properties,
essential for the foundry market.
The project continues to have strong support from key
stakeholders, including local Traditional Owner groups, local
Shires, the Mid West Development Commission, the Mid West
Chamber of Commerce and Industry, and both State and Federal
Governments.
ASX: VRX
Capital Structure
Shares:
984.3 million
Quoted Options:
111.2 million
Unquoted Options:
68.4 million
Performance Rights:
23 million
Corporate Directory
Peter Pawlowitsch
Interim Non-Executive
Chairman
Tony Swiericzuk
Chief Executive Officer
Bruce Maluish
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
The Company is actively
assessing other silica
sand and downstream
processing projects in
Australia.
2
Arramall farm purchase and updates to final regulatory approvals and timeline
During the quarter, the Company completed the purchase of the Arramall farm site, which sits
on freehold land adjacent to Arrowsmith North. Comprising approximately 2,091 hectares over
two separate lots, Arramall contains tracts of both cleared land and native vegetation,
bordered to the east by the Company’s mining lease at Arrowsmith North and to the west by
Brand Highway. Figure 1 shows a plan of the Arrowsmith North project area including the
adjacent Arramall farm site.
The site forms part of the Company’s broader environmental offset strategy and is ideal for
locating the processing plant and associated infrastructure for Arrowsmith North with easy
access to Brand Highway for transportation of products to Geraldton Port, with suitability for
locating a solar farm and potential future renewable power solution for Arrowsmith North.
Relocating the plant from its originally approved location within the Arrowsmith North MDE to
cleared, freehold land adjacent to Brand Highway at Arramall will reduce the overall
environmental impact of Arrowsmith North as less native vegetation will be disturbed both for
the plant and roads to the highway. However, as a consequence of this change, the Company
is required to apply for amendments to the existing regulatory approvals.
A number of targeted environmental and technical surveys required to support the plant
relocation and environmental offset strategy have been undertaken. The amendment process
requires submissions to the State agencies including Western Australian Department of
Mines, Petroleum and Exploration (DMPE), the Department of Water and Environmental
Regulation (DWER), the Environmental Protection Authority (EPA) and the the National
Environmental Protection Agency (NEPA).
DWER, EPA and DMPE are considering the amendment applications, and NEPA has
accepted a variation to the original referred proposal, confirming that previously flagged
conditions will be maintained and NEPA process will continue under an accredited
assessment.
The Company has continued its close consultation with all relevant regulatory authorities and
had expected the process to have completed in during the quarter. As a result of unanticipated
additional requests for information from regulators the process has taken longer than originally
planned and is now expected to complete in the current quarter.
VRX is targeting first production at Arrowsmith North with early trial shipments in early 2028
and does not expect any further material delays to its overall schedule for the project.
3
Figure 1: Arrowsmith North Project Area
4
Grant of General Purpose Lease for Plant and Infrastructure
During the quarter, DMPE granted to Ventnor Mining Pty Ltd, the Company’s wholly-owned
subsidiary and tenement holder at Arrowsmith North, a general purpose lease (GPL 70/280)
for a term of 21 years over a portion of the Arramall farm area to permit the Company to locate
the processing plant and associated infrastructure on that site.
Specifically, the GPL was granted for the following prescribed purposes:
• for erecting, placing and operating machinery thereon in connection with the mining
operations carried on by the lessee in relation to which the general purpose lease was
granted;
• for depositing or treating thereon minerals or tailings obtained from Arrowsmith North; and
• for using the land for any other specified purpose directly connected with mining operations
being – Camp, Contractor Yard, Mine Access Roads, Process Plant & Administration,
Product Stockpile, Site Access Roads, Slurry Pipeline, Solar Farm and Water Bore &
Process Water Dam,
subject to standard endorsements and conditions.
Project Finance
The financial model summarised in the 2026 Updated BFS released during the previous
quarter sets out the project metrics and provides a basis for the development of the project.
Total capital expenditure at Arrowsmith North (for a 2 million tonnes per annum processing
plant) is estimated at approximately A$74.5 million (the 2026 Updated BFS details capital cost
estimates).
The source of funding the capital investment at Arrowsmith North will be a combination of
equity, debt and/or pre-paid offtake from the project.
The Company continued to engage with potential funding partners during the quarter.
Whilst VRX has not yet secured the required capital, the positive financial metrics of the 2026
Updated BFS and feedback from potential funding partners provides encouragement as to the
likelihood of meeting optimum project and corporate capital requirements.
5
Muchea Hub
Subsequent to the end of the quarter, DMPE completed the formal process and tenure grant
for VRX’s land swap proposal (Proposal) at its Muchea Silica Sand Project (Muchea) located
50km north of Perth, WA, support for which was confirmed by the Western Australian State
Government during the previous quarter.
In October 2026, Mining Lease M70/1414 was granted for a term of 21 years over an agreed
partial area under application, with standard conditions and endorsements.
The process included a partial surrender of M70/1390 and the boundary of FNA 17231
(Proposed Conservation Reserves and Other Lands of Interest Pending Suitability
Assessment for Conservation, Restoration and/or Offsets. Proposals Inconsistent with
Conservation Land Use May Be Subject to Review) being amended to cover the areas of
E70/4886 and the ground surrendered from M70/1390.
The new project area for Muchea comprises both M70/1390 and M70/1414. Figure 2 shows
a plan of the Muchea project area.
The Proposal substantially increases the volume of high-grade silica sand accessible for
mining over an area with lower environmental impact and secures Muchea’s status as an
extensive, long-life, and world-class silica sand project.
The Muchea Project contains a JORC-compliant total Mineral Resource estimated at 208 Mt
of silica sand at a grade of 99.6% SiO2. It is a globally significant, very high-grade resource of
silica sand suitable for the development of high-quality silica sand products, with a focus on
the key raw material to supply ultra-clear glass markets.
The project has been included in Austrade’s Australian Critical Minerals Prospectus since
2022, demonstrating the Federal Government’s recognition of silicon and silica sand as critical
minerals and the importance of the Muchea Project in this regard.
The key features of Muchea are:
• Exploration activities conducted to-date over Muchea have identified a resource with high
prospectivity of a significantly greater tonnage of high-grade silica sand in the new project
area which is necessary to support an industry for the manufacture of ultra-clear glass and
other downstream industries.
• Muchea is the only silica sand deposit within Australia that hosts the required attributes to
support the production of ultra-clear glass with access to two close proximity gas pipelines
and has the capacity to support numerous other downstream manufacturing industries
over the long term. Production of ultra-clear glass has the potential to contribute a
significant strategic economic advantage to Western Australia with a new manufacturing
industry based on the project’s resources, increased employment and utilising domestic
gas reserves.
• The area is a topographic high which will enable mining to easily maintain the Department
of Water and Environmental Regulation requirement for mining to be at least 3 metres
above the year 2000 groundwater level. The project will not impact local water resources.
• The conservation value of land to be held by the State will be enhanced by the proposed
land swap by maintaining Black-Cockatoo breeding and roosting habitats outside the
proposed mining lease area, with minimal impact on foraging value, and increasing the
area of land set aside for conservation.
• Previous Aboriginal Cultural Heritage surveys conducted over the project area have not
identified any areas of cultural or heritage significance.
6
Figure 2: Muchea project area (post-land swap)
7
Downstream Processing Opportunities
Western Australia has the highest potential of any Australian jurisdiction to initiate
manufacturing of the required glass used in solar panels as it has numerous economic
advantages compared with other States, including a domestic gas reservation policy, proximity
to transport corridors, significant resources of silica, lime, dolomite, and potential production
of soda ash (all of which are required to manufacture glass) and a skilled workforce.
This underpins potential for establishing a specialist ultra-clear glassmaking industry and other
high value downstream industries in Western Australia. Muchea hosts the required attributes
to support the production of ultra-clear glass for solar panels and has the capacity to support
numerous other downstream manufacturing industries over the long term.
Production of ultra-clear glass has the potential to contribute a significant strategic economic
advantage to Western Australia with a new manufacturing industry based on the project’s
resources, increased employment and utilising domestic gas reserves. Also, a significant
number of jobs and employment opportunities would be created for the Western Australian
economy.
In addition, VRX has extended its silica test work program to determine further downstream
economic production of high value specialised silica flour and silica powder. These are products
that are essential for the manufacturing of LCDs, pharmaceutical glass, epoxy moulding
compound (EMC) encapsulant (for solar panels), high tensile fibreglass yarn (for wind turbine
blade covers), thermal protection blades (for industrial scale batteries), cristobalite (road
marking paint), quartz crucibles (for manufacture of solar panel poly silicon ingots), gorilla glass
(for mobile phone glass), and semi-conductors.
Muchea supports the delivery of economic benefits aligned with the State Government’s
priorities for 2025-2029 and it’s Made in WA plan and, accordingly, potentially may qualify for
State Government priority project status that fast-tracks strategic assessments, streamlines
government approvals, and reduces duplication.
Next Steps
Submission of referrals for environmental, mining and other regulatory approvals for the
project, planned for this and next quarter.
The Company intends to also update the 2019 bankable feasibility study for Muchea in 2027.
Corporate
Capital Raising – Strategic Placement
During the quarter, the Company announced that it has received binding commitments from
Nebari Natural Resources Credit Fund II LP (Nebari) for a strategic equity placement to raise
approx. A$3.5 million and from Delphi group to raise approx. A$1 million, for a total of approx.
A$4.5 million before costs. The placement strengthened the institutional presence on the
Company’s share register, which is an important strategic outcome ahead of the project
financing process for Arrowsmith North.
Nebari Partners LLC is a United States-based investment manager, specialised in privately
offered pooled investment vehicles, including Nebari Natural Resources Credit Fund II, which
is funding this investment.
8
Delphi group is a group of private investment companies located in Heidelberg, Germany,
including Deutsche Balaton and Sparta Invest, whose primary business objective is to invest
its own funds in a portfolio of companies. Delphi group has been active in other Australian
resources investments. Sparta Invest is a subsidiary of Deutsche Balaton, which has over
€500 million in funds under management. Both Deutsche Balaton and Sparta Invest have
been active in numerous Australian resources investments, including as a major shareholder
of VRX.
A total of 200,644,410 securities were issued under the Company’s capacity per ASX listing
rules 7.1 and 7.1A, specifically consisting of 48,808,486 shares and 66,881,470 options issued
under listing rule 7.1 and 84,954,454 shares issued under listing rule 7.1A.
Immediately post-issue Nebari held a 10.46% interest in VRX and Delphi group’s interest was
13.66%, on an undiluted basis.
The net proceeds provided funding towards the purchase of Arramall farm and will enable the
Company to undertake early works and finalise detailed engineering at Arrowsmith North,
works at Muchea, and provide additional working capital.
Board and Management Changes
On 1 July 2026 Tony Swiericzuk formally commenced in the role of VRX chief executive officer
on a full time basis. This followed the Company implementing a succession plan to allow for
an orderly transition to new leadership following Bruce Maluish indicating in late 2025 his
intention to retire from the managing director role in the medium term.
Mr Swiericzuk is a seasoned mining executive with over 30 years of leadership experience
and a distinguished career including in large scale mines and bulk ports. He brings strong
expertise in mining operations, exploration, project development, contractor management,
sales and marketing, and financing, along with a strong track record of engaging with Federal,
State, Local, and First Nation authorities. His deep industry knowledge spans exploration,
construction, mining, bulk ports, and manufacturing, providing him with a comprehensive, end-
to-end supply chain perspective. As general manager of the Christmas Creek Mine for FMG,
he oversaw the construction, commissioning and ramp-up of this project from 15Mtpa to
60Mtpa, then proceeded to optimise the operation and help drive FMG to become the world’s
lowest cost iron ore producer.
Mr Swiericzuk commenced in the CEO role on a part-time basis on 1 February 2026, allowing
him to transition into the role and wind down from other engagements in that interim period.
Given his significant experience in mining, and deep industry knowledge and contacts in silica
sand markets, particularly in Asia, Mr Maluish agreed to remain with the Company and moved
to a non-executive director role as from 1 July 2026.
In addition, long-standing VRX Chairman Paul Boyatzis retired from the role with effect from
the end of the previous quarter, to coincide with the end of the financial year and as part of a
broader wind-down of his ASX-listed company roles over recent years. Non-executive
director, Peter Pawlowitsch, stepped into the role of Interim Chairman at the start of the quarter
pending the appointment of a permanent replacement for Mr Boyatzis.
9
ASX Listing Rule 5.3 Disclosures
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $24,000 related mainly to
tenement rents and rates.
Payments for exploration & evaluation under investing activities of $152,000 consists mainly
of environmental approvals and mine engineering studies.
There were no substantive mining production and development activities during the quarter.
Details of tenement activities:
General Purpose Lease G70/280 was granted during the quarter.
Details of related party payments:
The aggregate amount of payments to related parties and their associates of $156,000
represents directors’ fees and salaries paid during the quarter.
This quarterly activities report has been approved for release by VRX Chief Executive Officer,
Tony Swiericzuk
Further information:
Tony Swiericzuk Ian Hobson
Chief Executive Officer Company Secretary
E: info@vrxsilica.com.au ianh@vrxsilica.com.au
T: 08 9226 3780
10
Table 1 Mineral Resource Statement (as at 30 September 2026)
Project Classification Mt
SiO₂
%
Al₂O₃
%
Fe₂O₃
%
TiO₂
%
LOI
%
Muchea
Indicated 29 99.6 0.1 0.03 0.1 0.2
Inferred 179 99.6 0.1 0.02 0.1 0.2
Total 208 99.6 0.1 0.02 0.1 0.2
Arrowsmith
North
Measured 10 95.9 1.9 0.7 0.3 0.7
Indicated 237 97.7 1.0 0.4 0.2 0.5
Inferred 266 98.4 0.7 0.3 0.2 0.4
Total 513 98.0 0.9 0.3 0.2 0.4
Arrowsmith
Brand
Inferred 523 97.3 1.4 0.4 0.2 0.6
Total 523 97.3 1.4 0.4 0.2 0.6
Arrowsmith
Central
Indicated 28.2 96.6 1.7 0.4 0.2 0.7
Inferred 48.3 96.9 1.5 0.4 0.2 0.7
Total 76.5 96.8 1.5 0.4 0.2 0.7
Boyatup
Inferred 60 97.8 0.8 0.2 0.1 0.9
Total 60 97.8 0.8 0.2 0.1 0.9
Total Mineral Resource 1,381 Million Tonnes
Table 2 Ore Reserve Statement (as at 30 September 2026)
Project Classification Product Mt
SiO2
%
Al2O3
%
Fe2O3
%
TiO2
%
LOI
%
Muchea Probable
F80 10.2
99.9 0.02 0.008 0.03 0.1
F80C 4.25
F150 4.25 99.8 0.07 0.015 0.035 0.1
Muchea Ore Reserve 18.7 Million Tonnes
Arrowsmith
North
Proved
AFS20 0.8 99.5 0.25 0.07 0.05 0.1
AFS35 3.9 99.5 0.5 0.06 0.05 0.1
AFS55 2.7 99.2 0.5 0.1 0.05 0.1
Local 1.8
Proved Ore Reserve 9.2 Million Tonnes
Probable
AFS20 24.2 99.5 0.25 0.07 0.05 0.1
AFS35 102.5 99.5 0.5 0.06 0.05 0.1
AFS55 51.1 99.2 0.5 0.1 0.05 0.1
Local 34.1
Probable Ore Reserve 212 Million Tonnes
Arrowsmith North Ore Reserve 221 Million Tonnes
Arrowsmith
Central
Probable
CF400 4.2
99.6 0.25 0.04 0.03 0.1
C20 8.4
C40 4.2
High TiO2 2.2 <1% 2%
Arrowsmith Central Ore Reserve 18.9 Million Tonnes
Total Ore Reserve 259 Million Tonnes
11
Compliance Statement
The information in this document that relates to the estimation and reporting of the Mineral
Resource and Ore Reserves for the Company’s silica sand projects is extracted from releases
to ASX on 27 May 2026 (Arrowsmith North), 17 September 2019 (Arrowsmith Central), 9 May
2023 (Arrowsmith Brand), 18 October 2019 (Muchea) and Boyatup (18 August 2022). The
Company confirms that it is not aware of any new information or data that materially affects the
information included in this document and all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed.
The information in this document that relates to the Company’s production target for the
Arrowsmith North silica sand project is extracted from releases to ASX on 6 March 2024 and
27 May 2026. The Company confirms that it is not aware of any new information or data that
materially affects the information included in this document and all material assumptions
underpinning the production target continue to apply and have not materially changed.
The information in this announcement that relates to the previous exploration results have
been cross referenced to the original announcement. The Company is not aware of any new
information or data that materially affects the previous exploration results.
The Company confirms that the form and context in which the Competent Persons’ findings
are presented have not been materially modified.
12
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica Sand
Tenement Status
Interest at
beginning of
quarter
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
E70/5027 Granted 100% - - 100%
E70/6765 Granted 100% - - 100%
M70/1389 Granted 100% - - 100%
R70/64 Granted 100% - - 100%
R70/65 Granted 100% - - 100%
L70/202 Granted 100% - - 100%
L70/203 Granted 100% - - 100%
L70/208 Granted 100% - - 100%
L70/229 Application - - - -
L70/230 Granted 100% - - 100%
G70/264 Granted 100% - - 100%
G70/265 Granted 100% - - 100%
G70/280 Granted - - 100% 100%
Muchea Project – Silica Sand
Tenement Status
Interest at
beginning of
quarter
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
E70/4886 Granted 100% - - 100%
E70/5651 Application - - - -
M70/1390 Granted 100% - - 100%
M70/1414 Application - - - -
L70/204 Granted 100% - - 100%
L70/205 Application - - - -
L70/206 Granted 100% - - 100%
Boyatup Project – Silica Sand
Tenement Status
Interest at
beginning of
quarter
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
E69/3560 Retention 100% - - 100%
13
About VRX’s target silica sand markets
Foundry
Silica sand is an essential part of both the ferrous and non-ferrous foundry industries. Metal
parts ranging from engine blocks to sink faucets are cast in a sand-and-clay mould to produce
their external shape, often using a resin coat to create the desired internal shape. Silica’s high
fusion point (1,760°C) and low rate of thermal expansion produce stable cores and moulds
compatible with all pouring temperatures. Its chemical purity also helps prevent interaction
with catalysts or affecting the curing rate of chemical binders, for that reason, customers are
looking for high quality silica sand that meets their specifications for size and shape.
Another critical specification is the hardness of silica grains to deliver the required crush
resistance to high pressure from molten metals.
Arrowsmith North is capable of producing multiple high quality sand products for the foundry
industry as confirmed by potential offtake partners in Asia following extensive testwork.
Glassmaking
Silica sand is the primary component of all types of standard and specialty glass. It provides
the essential SiO2 component of glass formulation and its chemical purity is the primary
determinant of colour, clarity and strength in glass. Silica sand is used to produce flat glass
for building and automotive use, container glass for foods and beverages, and tableware. In
its pulverised form, ground silica is required in the production of fibreglass insulation and for
reinforcing glass fibres. Specialty glass applications include test tubes and other scientific
tools, incandescent and fluorescent lamps, television and computer LCD/LED monitors.
Glassmaking physical specifications focus on particle size, as it significantly impacts melting
efficiency. Uniform grain size is preferred to reduce energy use and ensure complete melting.
In fibreglass production, over 99.5% of raw material grains are smaller than 0.045 mm (45μm),
and tighter limits are being considered. Coarse particles are hardest to melt and can cause
defects. Grain shape also matters—if too many grains are coarser than specified, incomplete
melting and poor product quality can result.
Refractory heavy minerals (RHM)—such as iron, zircon, corundum, chrome spinels, rutile, and
staurolite—should generally be avoided in glassmaking because they do not melt at standard
glass-making temperatures. This leads to solid inclusions or defects ("stones") in the final
glass. Limits on RHM are typically based on their size and amount, with particles larger than
0.25 mm (10 mesh) being the most problematic. These may be restricted by weight
percentage or particle count.
14
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most advanced pureplay silica sand company listed on the
ASX, developing its 100% owned silica sand projects at Arrowsmith (North, Brand and Central),
Muchea and Boyatup in Western Australia.
Silica sand is the most used commodity on the planet after air and water. It is the main ingredient in
foundry casting and in all types of glassmaking, including specialty solar panel and high-tech glass. It
is a finite resource that is running out, with the Asia-Pacific region experiencing an ever-growing
supply shortfall that will drive up prices in the long term.
VRX has significant Resources to underpin very long-life silica sand projects.
Arrowsmith is located 270km north
of Perth. Arrowsmith North boasts
a minimum 25-year mine life
capable of producing more than
2Mt tonnes per year of high-grade
(99.7% SiO2)* silica sand for export
to the foundry, container glass and
flat glass markets in Asia, with first
production planned for late 2027.
Muchea, located 50km north of
Perth, is an ultra-high-grade
(99.9% SiO2)* silica sand project
capable of producing sand required
for ultra-clear glass for solar panels
and other high-tech glass
applications.
Boyatup, located 100km east of
Esperance, is under development
and capable of producing sand for
the glass market.
*Information relating to grades are extracted from releases to ASX on 27 May 2026 (Arrowsmith North) and 18 October 2019
(Muchea). The company is not aware of any new information or data that materially affects this information.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VRX SILICA LTD
ABN Quarter ended (“current quarter”)
59 142 014 873 30 September 2026
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(24) (24)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (391) (391)
(e) administration and corporate costs (799) (799)
1.3 Dividends received (see note 3) - -
1.4 Interest received 11 11
1.5 Interest and other costs of finance paid (on
lease liability)
(2) (2)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(1,205) (1,205)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (4,857) (4,857)
(d) exploration & evaluation (152) (152)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (bonds deposit) - -
2.6 Net cash from / (used in) investing
activities
(5,009) (5,009)
3. Cash flows from financing activities
4,548 4,548
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(107) (107)
3.5 Proceeds from borrowings 2,041 2,041
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (repayment of lease liability) (26) (26)
3.10 Net cash from / (used in) financing
activities
6,456 6,456
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
4,122 4,122
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(1,205) (1,205)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(5,009) (5,009)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
6,456 6,456
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
4,364 4,364
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flow