Company Presentation
Released
Released
Announcement PDF
Silica Sand
Essential to world growth
Market Update
January 2020
Disclaimer
This document has been prepared by VRX Silica Limited (VRX). The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal presentation and should
be read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. In preparing and providing this document, VRX has not
considered the objectives, investment profile, financial position or needs of any particular recipient. Mineral exploration is subject to significant risk. There is no guarantee of exploration success, and even if exploration
success is achieved, there is no guarantee that development of any mineral deposit will be economically viable. VRX strongly suggests that investors consult a financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. To the maximum extent
permitted by law, none of VRX, its related bodies corporate, or their shareholders, directors, officers, employees, contractors, agents or advisors, nor any other person accepts any liability, including, without limitation, any
liability arising out of fault or negligence for any loss arising from the use of information contained in this document.
This document may include “forward-looking statements” within the meaning of securities laws of applicable jurisdictions. Forward looking statements can generally be identified by the use of the words “anticipate”,
“believe”, “expect”, “project”, “forecast”, “estimate”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”, “guideline”, “guidance” and other similar expressions. Indications of, and guidance on, revenue models,
pricing, earnings and financial position and performance are also forward-looking statements.
Such forward-looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of VRX, its related
bodies corporate, and their directors, officers, employees, contractors, agents and advisors, that may cause actual results to differ materially from those expressed or implied in such statement. Actual results, performance or
achievements may vary materially from any projections and forward looking statements and the assumptions on which those statements are based. In particular, potential revenue opportunities and guideline pricing models
set out in this document are based on certain assumptions which may in time prove to be false, inaccurate or incorrect. Readers are cautioned not to place undue reliance on forward looking statements and VRX assumes no
obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any jurisdiction, and neither this presentation nor anything contained in it forms the
basis of any contract or commitment. Without limiting the foregoing, this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. The securities of VRX have not
been, and will not be, registered under the U.S. Securities Act of 1933, as amended (Securities Act) or the securities laws of any state or other jurisdiction of the United States, and may not be offered or sold in the United
States except in compliance with the registration requirements of the Securities Act and any other applicable securities laws or pursuant to an exemption from, or in a transaction not subject to, the registration requirements
of the Securities Act and any other applicable securities laws.
Competent Persons Statements
The information in this report that relates to Exploration Results is based on data collected and compiled under the supervision of Mr David Reid, who is a full time employee of VRX Silica. Mr Reid, BSc (Geology), is a
registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and the activity being undertaken to qualify as
a Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the data in the form and
context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Grant Louw who is a full-time employee of CSA Global, under the direction and supervision of Dr Andrew Scogings, who
is an Associate of CSA Global. Dr Scogings is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. He is a Registered Professional Geologist in Industrial
Minerals. Dr Scogings has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012
edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Dr Scogings consents to the disclosure of information in this report in the form and context in which
it appears.
The information in this report that relates to the Ore Reserves is based on data collected and compiled under the supervision of Mr David Reid, who is a full time employee of VRX Silica. Mr Reid, BSc (Geology), is a registered
member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a
Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the data in the form and context
in which it appears.
“Sand is the main material
that modern cities are made of”
Vince Beiser
“The World in a Grain” 2018
The story of sand and how it
transformed Civilisation
Silica Sand
Silica sand has continued to support human progress throughout
history, being a key raw material in the industrial development of the
world, especially in the glass, metal casting and ceramics industries.
Supplies of sand are running out!
The world is facing
a global sand crisis
6
Silica Sand Use
Construction Sand
Concrete
Glassmaking
Flat, Containers, Architectural, Thin Film
Metal Casting/Foundry
Automobile parts
Oil/Gas Well Stimulation
Frac sand/proppant
Metallurgical
Ferrous and Non-ferrous Alloys
Paint and Coatings
Brightness and durability
Chemical Production
Sodium silicate, Silicon gels
Ceramics and Refractories
High temp resistance
Filtration
Water production
Agricultural/Recreational
Inert growing media, Golf bunkers
Target market
“Sand is the essential ingredient
that makes modern life possible”
Vince Beiser
“The World in a Grain” 2018
Construction Market
China and India will remain major markets for construction materials,
mainly due to the growth of the building sector in these two countries.
City construction needs glass!
Construction Market
Total Investment in Infrastructure
in Asia Pacific
Source: Avid Infomatics 2019
Flat Glass Market Outlook
Source: Avid Infomatics 2019
Flat Glass Market Outlook - China
The APAC flat glass market is
experiencing high growth because
of increased demand from the
construction and automotive
sectors.
The glass industry is a major driver
for the global silica sand mining
market
Source: Avid Infomatics 2019
Chinese Automobile Production
China produced 27 million
vehicles in 2018!
Source: Avid Infomatics 2019
“Humans are estimated to
consume nearly 50 billion tons
of sand and gravel every year”
“World Construction Aggregates”, 2016
Glass Innovation
Gorilla Glass
Corning is manufacturing proprietary Gorilla Glass primarily for automobile applications. This glass enables weight
reduction in more than 50% of glazing, compared to traditional soda lime glass. This is essential to reduce the weight of
an automobile in order to meet strict emissions regulations. Corning manufactures Gorilla glass which is used in
windshields, sidelights, backlights, sunroofs, and automotive interior panels.
LCD
Liquid Crystal Displays (LCD) are light modulators that require a light source to be viewed either backlit or lit from an
external source. Flat glass is coated with a film which is brushed into a single filament. This technology requires twisted
molecular chains, which change the flow of light through the medium to produce on or off pixels.
Thermochromic
Thermochromic Technology modulates the amount of light coming through the glass in response to changing
environmental temperatures from sunlight exposure and also changes in wind velocity and air temperature.
ClearVue PV
Australian research company ClearVue PV has been working for years perfecting a technology that utilises clear glass to
emulate a solar panel and generate power.
Infoverre
Asahi Glass Company (AGC) is developing a variety of new products for applications that include the infoverre™
WINDOW Series 9mm Clear Screen, encasing a transparent display between multi-paned glazing and can be used to
display information.
VRX’s three advanced WA Silica Sand Projects
Muchea (100%)
•
•
Very high-grade product with outstanding financial metrics
Well located to key port and rail infrastructure
•
•
Specialist glass products
Potential +100 year mine life:
-
•
JORC Resource 208Mt @ 99.6% SiO2
(Ind 29Mt @99.6% SiO2; Inf 179Mt @ 99.6% SiO2)
- Probable Ore Reserve of 18.7Mt @ 99.9% SiO2
BFS completed Oct 2019
Arrowsmith North (100%)
•
•
High-grade with exceptional financial metrics
Close proximity to port and rail infrastructure
•
•
Glass making, foundry and ceramic markets
Potential +100 year mine life:
-
•
JORC Resource of 771Mt @ 98% SiO2
(Ind 248Mt @ 97.7% SiO2; Inf 523Mt @ 98.2% SiO2)
- Probable Ore Reserve of 223 Mt @ 99.7% SiO2
BFS completed Aug 2019
Geraldton
Port
Arrowsmith Central (100%)
•
•
High grade with strong financial metrics
Adjacent to rail infrastructure to port
•
•
Container glass and foundry products
Significant resource base:
-
16
•
JORC Resource of 76.5 Mt @ 96.8% SiO2
(Ind 28.2Mt @ 96.6% SiO2; Inf 48.3Mt @ 96.9% SiO2)
- Probable Ore Reserve of 18.9 Mt @ 99.6% SiO2
BFS completed September 2019
Kwinana
Port
Processing
Plant Design
No dust
No chemicals
Silica Sand Development Timeline
ARROWSMITH
Approvals / Permitting
BFS
MUCHEA
Arrowsmith
Production
Commences
Commence
Construction
Dec
2019
Production
Construction
June
2020
Dec
2020
June
2021
Dec
2021
BFS
Commence
Construction
Approvals / Permitting
Muchea
Production
Commences
Construction
Production
BFS’s Demonstrate Exceptional Economics*
Arrowsmith North
Post Tax, ungeared NPV10
Arrowsmith Central
Muchea
Total
$242.3m
$147.6m
$337.9m
$727.8m
Post Tax, ungeared IRR
79%
60%
96%
83%
Payback period (yrs) (post tax) (ramp up rate)
2.4
2.8
2.3
2.4
Exchange Rate US$/A$
$0.70
Life of Mine (yrs) (BFS Study)
25
EBIT
$1.144bn
$737m
$1.540bn
$3.421bn
Total Sales (25 years) no escalation
$2.773bn
$2.167m
$3.345bn
$8.285bn
$835m
$539m
$1.123bn
$2.497bn
$28.260m
$25.88m
$32.8m
$87m
Cashflow after finance and tax
Capex (2 mtpa)
Capex contingency (inc)
Life of Mine C1 costs, FOB (inc Royalties)
Tonnes Processed (million tonnes) (BFS Study)
20%
$30.18
$27.67
$32.74
$30.24
53
51
54
158
Investment
Highlights
1. Emerging Australian strategic silica sand producer
2. Outstanding project economics and logistics
3. Combined NPV10 after tax $727m
4. Ideally placed to capitalise on robust market
outlook and demand
5. Rapid pathway to financing and production
Corporate & Capital Summary
Directors
Capital Structure
Shares On Issue
(m)
445
Paul Boyatzis
Non-Executive Chairman
Options on Issue1
(m)
69.5
Bruce Maluish
Managing Director
Share Price
cents
9
Peter Pawlowitsch
Cash (30 Dec)
A$m
3.9
Debt
A$m
Nil
Market Capitalisation
A$m
40
1 Volume weighted exercise price 10.67 cents
Share Price (12 month)
Non-Executive Director
Thank you
Bruce Maluish
Managing Director
Level 1, 6 Thelma Street
West Perth WA 6005
Phone: 08 9226 3780
Email: brucem@vrxsilica.com.au
Share your feedback
Discover