Half Yearly Report and Accounts
Released
Released
Announcement PDF
VENTNOR RESOURCES LIMITED
ABN 59 142 014 873
INTERIM FINANCIAL REPORT
FOR HALF-YEAR ENDED
31 DECEMBER 2016
CORPORATE DIRECTORY
DIRECTORS
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
SECRETARY
John Geary
REGISTERED AND PRINCIPAL OFFICE
Level 1, 6 Thelma Street
West Perth WA 6005
Telephone: (08) 9226 3780
Facsimile: (08) 9226 3764
SHARE REGISTRY
Computershare Investor Services Pty Ltd
Level 11, 172 St George's Terrace
Perth WA 6000
Telephone: (08) 9323 2000
Facsimile: (08) 9323 2033
AUDITORS
RSM Australia Partners
8 St Georges Terrace
Perth WA 6000
AUSTRALIAN SECURITIES EXCHANGE
Ventnor Resources Limited shares (VRX) are listed
on the Australian Securities Exchange
Ventnor Resources Limited
1
DIRECTORS’ REPORT
Your directors submit the financial report of the consolidated entity for the half-year ended 31 December
2016. In order to comply with the provisions of the Corporations Act 2001, the directors report as follows:
DIRECTORS
The names of the Directors who held office during or since the end of the half-year and until the date of
this report are noted below. Directors were in office for this entire period unless otherwise stated:
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
PRINCIPAL ACTIVITIES
The principal continuing activities during the half-year of entities within the consolidated entity was
mineral exploration.
REVIEW OF OPERATIONS
The net loss for the half-year attributable to members of Ventnor Resources Limited was $559,353
(2015: loss of $319,455).
Exploration
Ventnor Resources Limited (Ventnor or the Company) provides the following summary of exploration
activities conducted during the half-year ended 31 December 2016.
During the latter part of the period the Company conducted Moving Loop EM surveys at the Silver
Dragon and Fire Dragon prospects at the Biranup Project in Western Australia. Following the survey
which identified conductors at Fire Dragon and Silver Dragon, the Company drilled three deep RC holes
during the December quarter at both Fire Dragon (2 holes) and Silver Dragon (1 hole). Assay results,
scans and interpretation are still pending. The Company continued evaluation of the database collated
on the Biranup Project with the aim of identifying further drill targets. Extra ground was applied for in
the Biranup project area with a total ground holding now of 370km2.
Background to Biranup
Biranup was formerly known as the Black Dragon Gold Project. When granted in March 2015 the 42
graticular block EL39/1828 was referred to as the Black Dragon Gold Project, however subsequent
work by Ventnor has identified multiple exploration targets on the 140 square km area. These
exploration targets are prospective for various minerals as well as gold and to avoid confusion and
easier identification the tenement was renamed the Biranup Project area with each target area
individually named.
Ventnor Resources Limited
2
DIRECTORS’ REPORT
Ventnor’s Biranup Project is proximal to the Tropicana gold mine owned by AngloGold Ashanti and the
Independence Group. Tropicana commenced production in 2013 and contains a resource in excess of
6Moz situated 22 kilometres to the south-west of EL 39/1828.
EL39/1828 was previously explored in the 1990s by WMC and more recently by the AngloGold Ashanti
and Independence Group joint venture, which generated a large dataset of geological information over
a 7½ year period.
Tenement
E39/1828 (42 Blocks)
Activity
Quantity
Surface Rock Chip sampling
165 Samples
Soil sampling
2,566 Samples
Auger geochemistry
3,459 Samples
AC Drilling
1,044 holes (43,773m)
RC Drilling
66 holes (9,627m)
Diamond Drilling
4 holes (821m)
Gravity Survey
275 stations
Airborne Magnetic and Radiometric Survey
521 line kms
Airborne Electromagnetic Survey
284 line kms
Induced Polarisation Gradient Survey
22 line kms
Historic exploration conducted on EL39/1828
Ventnor Resources Limited
3
DIRECTORS’ REPORT
AngloGold explored the ground for Tropicana-style gold mineralisation, being a 30 o south-east dipping,
tabular orebody characterised by biotite-sericite-pyrite alteration of the host gneisses. The primary
exploration technique used was vertical aircore drilling on a 200m x 200m drill pattern, and sometimes
400m or wider lines, drilled to blade refusal, with routine gold assays down-hole and bottom-of-hole
multi-element assays. Limited RC and diamond drilling was conducted in areas of stronger gold
anomalism. The result of this exploration effort is that Ventnor has inherited a large database of
geochemical multi-element assays and geophysical surveys that are invaluable in targeting not only
gold mineralisation, but other precious and base metals.
The database includes assays of soil samples, auger samples, AC, RC, and diamond drilling results,
along with a significant geophysical database including gravity/mag and EM surveys. The Company
has used specialists to evaluate all of the components of the database and has examined concurrent
anomalies.
Immediately after the tenement was granted, Ventnor commenced field checking and data analysis
work, and within six months had completed a maiden RC drilling program on the Black Dragon outcrop
which produced high-grade assay results including 9 metres at 7.08g/t Au in BDRC1001 and 6 metres
at 3.02g/t Au in BDRC1026 (ASX announcement 16th November 2015 – “Black Dragon Exploration
Update”). Whilst this drilling program hasn’t yet resulted in an economic resource, it did confirm the
presence of gold mineralisation at higher grades than previous drilling, supporting the Company’s view
regarding the remaining prospectivity of the tenement.
In 2016, Ventnor has continued to advance the Biranup Project area through acquisition of detailed
50m line-spaced aeromagnetic data, as well as satellite-acquired Emissivity and Quartz Mapping.
These datasets have been reviewed in-house and by Company consultants to generate multiple
exploration targets for testing.
Since the last drilling campaign, Ventnor has acquired high quality IP survey data and is re-evaluating
the drilling data in conjunction with the IP data to plan a further drill program.
In adding to the geological knowledge of the tenement Ventnor has been able to reinterpret the regional
basement geology, isolating a promising gold anomaly, and identifying an anomalous NiCu zone.
Ventnor Resources Limited
4
DIRECTORS’ REPORT
The basement geology has been re-evaluated at project scale using available drill data, and a new
interpretation has highlighted an area to the west of the tenement with a subdued magnetic response
which coincides with a low embayment in the regional gravity data. The potential for a granitoid
intrusion is supported by soil and auger assays indicating the area is depleted in Mg but enriched with
Pb, Sb, As and W, which provide fertile ground for further exploration.
The new interpretation has identified three mineralisation styles:
Tropicana Style – Au in K-rich shear zone within high-grade gneisses. Younger than Yilgarn
gold and with a limited alteration halo.
Voodoo Child Style -- associated with 1750Ma intrusions into localised pull-apart basins,
diverse rock assemblage, target structural ‘traps’ in Proterozoic and Archaean rocks,
identifiable in magnetics. Other intrusion-hosted potential may exist.
Shear Zone Style – remobilisation of Au, SZ’s identified on magnetics commonly show Au
anomalism (e.g., Black Dragon), target second order shears and dilatant zones next to major
SZs.
New basement geology interpretation
Ventnor Resources Limited
5
DIRECTORS’ REPORT
General Work Conducted during the Period
On 13 October 2016 Ventnor advised the market of the commencement of geophysical surveys at its
Silver Dragon and Fire Dragon prospects in the Biranup Project area. The two target surveys that were
completed at Biranup utilised Moving Loop Electromagnetic (MLEM) geophysical technology to
investigate the prospective areas. Following the identification of a compelling bedrock anomaly the
geophysical survey was expanded to include further survey lines to better define a target for future
drilling. The market was advised on 1 November 2016 and the program was completed during the
quarter.
A large airborne SPECTREM survey was flown previously, from which a review was carried out to
assess survey data quality and to identify both regolith features and any anomalous EM responses that
could indicate bedrock conductors associated with conductive semi-massive to massive sulphide
mineralisation for follow-up work. As a result of this work, Ventnor has determined to proceed with onground MLEM surveys at Silver Dragon and Fire Dragon.
SPECTREM system specifications
SPECTREM is a fixed-wing time domain STEP response AEM system with capabilities to detect semimassive to massive sulphides at considerable depth, in either conductive or resistive environments.
SPECTREM records a full on-time measurement of the EM field using a 100% duty cycle square current
waveform, which is processed to provide a STEP response signal at the receiver (Legault, 2015). A
three component air-cored receiver coil is towed 128m behind the aircraft at a nominal flying height of
90m above the ground.
MLEM survey over SPECTREM electromagnetic anomalies
Initial ground electromagnetic surveying has successfully delineated a bedrock conductor anomaly at
the Fire Dragon Prospect. The moving loop EM program was designed to follow up two anomalous EM
responses identified from a recent review of SPECTREM data acquired by the previous tenement
holder. Three MLEM survey lines were carried out to define the strongest SPECTREM anomaly in the
south of the prospect area; results received indicate an extension of the conductive response to the
north/northwest.
Results from a single MLEM traverse carried out across the weaker SPECTREM anomaly, in the north
of the prospect area, indicate a strengthening of the conductive response to the south of the survey line.
After the success of the initial MLEM surveying at Fire Dragon, additional MLEM traverses were
designed to provide complete coverage and to identify where the anomalous EM response is strongest.
With this information, Ventnor generated high priority drill target areas to confirm the source of this
conductive response.
Ventnor Resources Limited
6
DIRECTORS’ REPORT
Fire Dragon MLEM Survey Lines
Following the MLEM surveys Ventnor commenced RC drilling in early November at its Silver Dragon and
Fire Dragon base metal prospects within the Biranup Project area seeking to define mineralisation at the
two targets generated from the MLEM surveys.
The prospectivity of both the Silver Dragon and Fire Dragon prospects is also well supported by
coincident geochemical results, which are anomalous in base metals. The drilling at Fire Dragon was to
test the mineralisation of the MLEM conductor, while the hole drilled at Silver Dragon was to be set up
to enable a down hole EM survey to be undertaken.
Ventnor Resources Limited
7
DIRECTORS’ REPORT
Fire Dragon – EM Anomaly
An additional exploration target has been highlighted at Fire Dragon which has been included for a
further on-ground MLEM Survey conducted concurrently with the Silver Dragon survey.
Anomalous SPECTREM EM responses were observed in the middle-late time EM decay channels and
are interpreted as discrete bedrock conductor anomalies that could be associated with semi-massive to
massive sulphide mineralisation or conductive stratigraphy, such as pods of graphite from
metamorphosed black shale.
The figure below shows the later time channel ternary RGB image (0.5VD filtered time decay channels
R = 9, G = 7 and B = 5) highlighting the bedrock conductor responses observed at the Fire Dragon
prospect in purple. Tenement outline shown in red. Coordinates are GDA 94, MGA 51.
Ventnor Resources Limited
8
DIRECTORS’ REPORT
The Z component SPECTREM response profile from survey line 14090, (which transects the Fire
Dragon anomaly) is shown below. This is interpreted as a middle-late time bedrock conductor anomaly.
It is the strongest bedrock conductor anomaly observed, and is also associated with a discrete weak
magnetic anomaly which would be unusual if associated with conductive shale or graphite in this
geological setting.
In support of the geophysical interpretation, there is geochemical anomalism associated with the Fire
Dragon SPECTREM anomaly. Aircore bottom-of-hole assays for silver and cobalt are anomalous. The
peak value, which is on the southern edge of the EM anomaly, is a bottom-of-hole sample that returned
28.68g/t silver and 0.32% cobalt.
MLEM surveying was carried out along 200m spaced E-W traverses to follow up on a strong anomalous
conductor response identified from the SPECTREM survey. The ground EM survey resolved a strong
anomalous EM response indicative of a bedrock conductor. The EM anomaly is also associated with a
weak magnetic anomaly. The EM and magnetic anomaly responses have been modelled by
geophysical consultants and high priority drill target areas were identified.
Ventnor Resources Limited
9
DIRECTORS’ REPORT
3D view of modelled EM conductor plates with magnetic inversion result as smooth red bodies
and MLEM profile responses with modelled source conductors as yellow and red “plates”
MLEM profile responses showing the Fire Dragon MLEM anomaly in hot colours on a magnetic
image of the prospect area
Ventnor Resources Limited
10
DIRECTORS’ REPORT
Analysis of the existing geological dataset generated from previous drilling supports the geophysical
interpretation. Geological logging of the holes suggested that Fire Dragon is largely covered by
transported sediments to a depth of 60-80m and geophysical modelling of the anomalous EM response
suggested a depth of greater than 100m to the top of the MLEM conductor. This was born out by the
RC drilling conducted during November 2016 and completed early December 2016.
Red Dragon - Gold
Evaluation of the geophysical and geochemistry databases have identified a compelling gold anomaly
situated within a demagnetised zone with an elevated background of gold in geochemistry. The deepest
hole drilled previously within the anomaly is isolated and includes 1 metre at 13.4 g/t Au from 147 metres
down a 60o inclined RC hole. Further work planned includes a gradient array IP survey and drill holes
to follow up the previously identified high-grade anomaly.
Au High
Magnetic Low
Au Elevated
Background
Figure Left - magnetic reduced to pole image of the Red Dragon area with significant magnetic
breaks (faults) in white dash lines.
Figure Right - gold in soil anomalism overlain on the magnetics showing a zoned anomaly
approximately 6 km by 3km in area (outer yellow dash line) with higher grade gold in soil
anomaly approximately 1.5km by 1.5km (inner yellow dash line).
Ventnor Resources Limited
11
DIRECTORS’ REPORT
Silver Dragon – Cu-Ni Anomaly
The Company has identified a magnetic feature north-east of Red Dragon associated with elevated
copper, cobalt, and nickel in soil sampling and mafic to ultramafic rocks.
Magnetic
feature
Zoned
area
Figure Left - magnetic reduced to pole image of the Red Dragon area with significant magnetic
breaks (faults) in white dash lines.
Figure Right - showing zoomed-in area of a zoned magnetic high.
The zoned area has elevated base metals auger geochemistry and ovoidal zoning features in the tilt
derivative.
Ventnor Resources Limited
12
DIRECTORS’ REPORT
Co
Cu
Ni
Figure Left - magnetic reduced to pole image of zoned magnetic high area with dash outlines
showing the location of the copper, cobalt, and nickel anomalies in soils in an area 3km by
2km.
Figure Right – the same area with a tilt-derivative magnetic image showing zoned areas
(yellow dash lines).
Recent sampling has indicated mafic and ultramafic type rocks. During the quarter under review, the
Company designed a future work program including a Moving Loop Electromagnetic (MLEM) survey
with potential follow-up drilling on any identified targets. The target type is potentially nickel-coppercobalt sulphides associated with a mafic to ultramafic intrusion.
During the year prior to this quarter Ventnor acquired high-resolution magnetic data over the southern
half of the tenement to assist in detailed evaluation.
MLEM surveying was carried out at the copper-nickel Silver Dragon prospect using regionally spaced
traverses (400m) and 100m spaced stations. The MLEM survey was designed to try and identify
conductive bedrock EM anomaly responses for further follow up in the prospect area associated with
magnetic and geochemical anomalism
The Silver Dragon MLEM survey results have assisted interpreting the geochemical samples, and has
identified a very subtle anomalous response to the west of the WMC 1997 soil sample highlighted in
the following figure. The anomaly has been modelled by geophysical consultants to provide a vector for
drill targeting. Drilling will be followed up with a downhole EM (DHEM) survey.
Ventnor Resources Limited
13
DIRECTORS’ REPORT
Detailed 50m spaced lines aeromagnetic data over the southern portion of the project area
merged in with the regional magnetic data.
Ventnor Resources Limited
14
DIRECTORS’ REPORT
Silver Dragon magnetic anomaly features with geochemical anomaly outlines
The magnetic body shows ovoid features and is associated with the following anomalism from the multielement auger geochemical sampling”
Mg – Enriched
Fe – Depleted
Zn – Enriched
Cu – Enriched
Co – Enriched
Ni – Enriched
It should be noted in addition to the image above is that of a LAG soil sample taken by Western Mining
Corporation (WMC) in 1997, which returned a value of 315ppm Ni and 160ppm Cu above very low
background. WMC commenced exploration in the area with a large tenement holding as their Pleiades
Lakes Project, with the stated aim to target the area for Voiseys Bay style mafic hosted nickel sulphide
deposits. The project focused on 14 magnetic anomalies generated from a large aeromag survey over
a 3 year period.
Of the 14 magnetic targets, one target (PL6) stood out as having the most significant nickel and copper
anomalism. The soil sample shown on the image above followed an anomalous rock chip taken from
the outcrop at Silver Dragon. This position is proximal to the identified contactor and makes for a
compelling target to be investigated as proposed.
Ventnor Resources Limited
15
DIRECTORS’ REPORT
Co-Funded Drilling Grant
In early December Ventnor announced it has been awarded a drilling grant by the Western Australian
State Government as part of the Co-Funding Industry Drilling Program. Ventnor was awarded $125,000
to progress its drilling program at Silver Dragon.
The grant by the West Australian State Government is aimed at supporting innovative drilling by
companies in greenfield areas, where additional drilling and promotional activities will potentially lead
to new discoveries.
The co-funded drilling program is designed to fund high quality, technical and economically based
projects which promote new exploration concepts and technologies. Proposals were assessed by a
panel on the basis of geoscientific and exploration targeting merit.
New Ground applications
Ventnor has made application for four Exploration Licences adjacent to the Biranup Project. The
additional licences are for 77 graticular blocks for a total project area of 370 km2.
The priority for these new areas is for the Company to once again accumulate the historic data
applicable to the areas. A significant geophysical, geochem and drilling database is available which will
enable Ventnor to isolate areas of interest and select prospects for further exploration for base metals
and gold.
Ventnor Resources Limited
16
DIRECTORS’ REPORT
Thaduna/Green Dragon Copper Project
The Thaduna Project is located 40km east of DeGrussa and represents the largest copper resource in
the Doolgunna-Bryah Basin Region outside of Sandfire’s Degrussa-Doolgunna Project (7.9Mt@1.8%
Cu for 142,000 tonnes of contained copper). Until 22 August Sandfire owned a 35% interest in the
Thaduna/Green Dragon project, and had entered into a farm-in agreement with Ventnor Resources Ltd
to earn a further 45% (total of 80%).
Ventnor announced on 22 August 2016 that Ventnor Resources Ltd (Ventnor), Delgare Pty Ltd
(Delgare), a wholly owned subsidiary of Ventnor, and Sandfire Resources NL (Sandfire) had executed
agreements for Sandfire to purchase the remaining 65% of the Thaduna/Green Dragon Copper Project
with Ventnor to maintain a royalty interest.
The Ventnor board ensured the sale agreement was structured to produce the same or very similar
outcomes to those of the JV once mining of the resource commences.
Events Subsequent to the Quarter
Subsequent to the period Ventnor announced a follow up diamond drilling program at the Fire Dragon
prospect in the Biranup Project area for late January 2017. A multi-purpose RC and diamond drill rig
has been mobilized to site to drill an RC pre-collar with a diamond tail to drill deeper down the conductor
and to generate drill core. This will allow for a much better understanding of the host rocks in the Fire
Dragon area and to intersect the strongest conductive area, testing for nickel and copper sulphides.
Also, the drill hole will be cased with PVC to undertake a DHEM survey, and if possible, the 2 RC holes
will have the PVC re-instated to be included in that survey.
Assays for this program are expected towards the end of the March quarter.
The program follows the two-hole Reverse Circulation (“RC”) program in late 2016, following up on two
targets generated from the previous MLEM survey. As reported, the RC drilling intersected a pervasively
sulphidic, predominantly pyrrhotite, mafic rock, with discrete zones of semi-massive to massive
sulphides. Assay results have been received that confirm these zones are associated with peak copper,
nickel and cobalt values and are anomalous, when compared to the background values in the rest of
the holes, by an order of magnitude, warranting deeper drilling.
Selected chips from FRC001, similar to those below, were sent to A & A Crawford Geological
consultants, Tasmania to determine the nature of the host rock and origin of the sulphides.
This analysis determined that, in one sample, the host rock was “unambiguously a medium grained,
mafic granulite likely derived from a gabbro or gabbronorite protolith”. It has been well documented that
the protolith of the magmatic intrusive body that gave rise to the Nova – Bollinger magmatic nickel
copper deposit was a gabbronorite.
The thin section analysis indicates that the host rocks at Fire Dragon are of the right type and origin to
generate a magmatic base metals deposit.
In addition to this work, a down hole electromagnetic survey (“DHEM”) was attempted on the 2 RC holes
that were drilled at Fire Dragon to better determine the best target to test the known conductor.
Unfortunately, the PVC casing that was installed become blocked, which precluded the survey from
successfully testing the lower sulphide rich zones.
Whilst the geophysical survey crew was onsite additional lines of MLEM were surveyed. This data has
allowed for better modelling of the conductor and to generate a new drill target. The eastern line has
confirmed an additional conductor that will require further surveys to determine the orientation.
Ventnor Resources Limited
17
DIRECTORS’ REPORT
Polished thin section – dark and brassy domains are sulphides
New Conductor
Interpreted Conductor plates
Additional MLEM survey points shown in pink at Fire Dragon
Ventnor Resources Limited
18
STATEMENT OF COMPREHENSIVE INCOME
For the half-year ended 31 December 2016
Consolidated
31 December
31 December
2016
2015
$
$
Continuing operations
Revenue
45,703
37,332
Exploration and evaluation expenditure
Depreciation
Directors fees and benefits expense
Share based payments
Loss on sale of available for sale financial assets
Corporate and administration expenses
(60,758)
(10,583)
(79,750)
(69,500)
(100,591)
(283,874)
(51,128)
(17,064)
(79,750)
(208,845)
Loss before income tax expense
(559,353)
(319,455)
-
-
(559,353)
(319,455)
Other comprehensive income
-
-
Other comprehensive income for the period, net of tax
-
-
(559,353)
(319,455)
(0.33)
(0.23)
Income tax expense
Net loss for the period
Total comprehensive loss attributable to members of
Ventnor Resources Limited
Basic and diluted loss per share (cents per share)
The accompanying notes form part of these financial statements
Ventnor Resources Limited
20
STATEMENT OF FINANCIAL POSITION
As at 31 December 2016
Consolidated
31 December
30 June
2016
2016
$
$
Note
ASSETS
Current Assets
Cash and cash equivalents
Trade and other receivables
2,070,228
105,616
2,175,844
-
84,070
38,309
122,379
1,700,000
Total Current Assets
2,175,844
1,822,379
Non-Current Assets
Trade and other receivables
Plant and equipment
Deferred exploration expenditure
42,000
3,950
1,827,876
42,000
14,533
1,403,001
Total Non-Current Assets
1,873,826
1,459,534
Total Assets
4,049,670
3,281,913
LIABILITIES
Current Liabilities
Trade and other payables
Provisions
95,292
61,152
70,459
56,941
Total Current Liabilities
156,444
127,400
Total Liabilities
156,444
127,400
3,893,226
3,154,513
20,571,809
1,620,756
(18,299,339)
19,343,243
1,551,256
(17,739,986)
3,893,226
3,154,513
Non-current asset held for sale
2
3
Net Assets
EQUITY
Issued capital
Reserves
Accumulated losses
Total Equity
4
The accompanying notes form part of these financial statements
Ventnor Resources Limited
21
STATEMENT OF CHANGES IN EQUITY
For the half-year ended 31 December 2016
Consolidated
Issued
Capital
$
Reserves
$
Accumulated
Losses
$
Total
Equity
$
19,343,243
1,551,256
(17,739,986)
3,154,513
Loss for period
Total comprehensive loss for period
-
-
(559,353)
(559,353)
(559,353)
(559,353)
Securities issued during the period
Capital raising costs
Cost of share based payments
1,286,977
(58,411)
-
69,500
-
1,286,977
(58,411)
69,500
Balance at 31 December 2016
20,571,809
1,620,756
(18,299,339)
3,893,226
Balance at 1 July 2015
19,343,243
1,551,256
(7,726,269)
13,168,230
-
-
(319,455)
(319,455)
(319,455)
(319,455)
19,343,243
1,551,256
(8,045,724)
12,848,775
Balance at 1 July 2016
Loss for period
Total comprehensive loss for period
Balance at 31 December 2015
The accompanying notes form part of these financial statements
Ventnor Resources Limited
22
STATEMENT OF CASH FLOWS
For the half-year ended 31 December 2016
Consolidated
31 December
31 December
2016
2015
$
$
Cash flows from operating activities
Payments to suppliers and employees
Interest received
Other income
(418,045)
4,738
8,700
(225,185)
3,705
-
Net cash (used in) operating activities
(404,607)
(221,480)
Cash flows from investing activities
Expenditure on mining interests
Proceeds from sale of available for sale financial assets
Dividends received
(445,607)
1,599,409
14,912
(376,586)
-
Net cash provided by/(used in) investing activities
1,168,714
(376,586)
Cash flows from financing activities
Proceeds from issue of shares
Payment of capital raising costs
Proceeds from borrowings
Repayment of borrowings
1,286,977
(64,926)
100,000
(100,000)
(21,465)
-
Net cash provided by/(used in) financing activities
1,222,051
(21,465)
Net increase/(decrease) in cash held
1,986,158
(619,531)
84,070
1,027,759
2,070,228
408,228
Cash at beginning of the half-year
Cash at end of the half-year
The accompanying notes form part of these financial statements
Ventnor Resources Limited
23
NOTES TO THE FINANCIAL STATEMENTS
For the half-year ended 31 December 2016
1.
STATEMENT OF SIGNIFICANT ACCOUNTING POLICIES
Basis of Preparation
These general purpose interim financial statements for the half-year reporting period ended 31
December 2016 have been prepared in accordance with Australian Accounting Standard AASB 134:
Interim Financial Reporting and the Corporations Act 2001. The consolidated entity is a for-profit entity
for financial reporting purposes under Australian Accounting Standards. Compliance with AASB 134
ensures compliance with International Financial Reporting Standard IAS 34 'Interim Financial
Reporting'.
This interim financial report does not include full disclosures of the type normally included in an annual
report. It is recommended that this financial report to be read in conjunction with the annual financial
report for the year ended 30 June 2016 and any public announcements made by Ventnor Resources
Limited during the half-year reporting period in accordance with the continuous disclosure
requirements of the Corporations Act 2001.
The accounting policies have been consistently applied with those of the previous financial year and
corresponding interim reporting period, except in relation to the matters disclosed below.
New and Revised Accounting Standards
The consolidated entity has adopted all of the new and revised Accounting Standards and
Interpretations issued by the Australian Accounting Standards Board that are mandatory for the current
reporting period. The adoption of these new and revised Accounting Standards and Interpretations has
not resulted in a significant or material change to the consolidated entity’s accounting policies.
Any new, revised or amending Accounting Standards or Interpretations that are not yet mandatory have
not been early adopted by the consolidated entity.
Ventnor Resources Limited
24
NOTES TO THE FINANCIAL STATEMENTS
For the half-year ended 31 December 2016
2.
NON-CURRENT ASSET HELD FOR SALE
31 December
2016
$
Current
Thaduna/Green Dragon Copper Project
-
30 June
2016
$
1,700,000
At 30 June 2016, the Thaduna/Green Dragon Copper Project was held for sale to Sandfire Resources
NL.
Share your feedback