Diamond Drilling at Thaduna Green Dragon
Released
Released
Announcement PDF
6 October 2015
ASX ANNOUNCEMENT
DIAMOND DRILLING AT THADUNA/GREEN DRAGON
Ventnor Resources Ltd (ASX:VRX) (“Ventnor” or “the Company”)
is pleased to announce that its partner, Sandfire Resources NL
(ASX:SFR) (“Sandfire”), will shortly commence a diamond drill
program aimed at resource definition at the Thaduna/Green
Dragon Copper Project in Western Australia.
On 4 December 2013 Ventnor entered a joint venture agreement
with Sandfire on Thaduna/Green Dragon, which is located
170km north of Meekatharra in Western Australia. At that date
Sandfire acquired a 35% interest in the project and management
of the joint venture. Under the agreed earn-in schedule, Sandfire
can increase its interest to 80% by spending an additional $6
million on exploration and studies by December 2017.
It is anticipated that the proposed resource definition exercise,
which entails drilling at Thaduna, six diamond holes to an
average depth of approximately 350 metres down hole, will begin
this month (October).
Holes have been planned and selected to target gaps in drill
coverage over the main ore body, between known mineralisation
intercepts.
At the time the Thaduna/Green Dragon joint venture
commenced, Ventnor had completed 221 RC drill holes for
29,041 metres, with 79 Diamond Tails for 20,485 metres, totaling
49,526 metres at the Project.
Sandfire recently completed a program of five RC holes, which
tested drill methods to keep RC resource definition holes and
diamond pre-collars at the proposed trajectory. The proposed
diamond holes will require RC pre-collars.
Ventnor Managing Director Bruce Maluish said: “We are gratified
that Sandfire is commencing a drill program aimed at building on
the deeper resource at Thaduna.
”The Thaduna 2012 JORC Resource stands at 2.95 million
tonnes at 3.27% Cu and 7.6g/t Ag for 96,000 tonnes of copper
and 720,000 ounces of silver and we are optimistic that this will
grow through further exploration.”
ASX: VRX
Capital Structure
Shares on Issue 137.5 million
Unlisted Options 13.4 million
Market Cap @ 4.0¢ a share
$5.5 million (Fully Diluted)
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
John Geary
Company Secretary
Company Projects
Thaduna/Green Dragon
Copper Project in the
Doolgunna district, WA
(subject to SFR Farm-in)
Black Dragon Gold project
adjacent to the Tropicana
Gold Mine
Warrawanda Nickel Project
south of Newman, WA
Georgina Basin IOCG Project
in western Queensland
The Company is actively
assessing other base metal
projects in Australia.
CORPORATE
Ventnor has agreed to grant a six-month extension to the second earn-in period, during
which Sandfire has the option to increase its interest in Thaduna/Green Dragon to 51% by
sole funding $3 million of exploration expenditure.
The extension means the second earn-in period will now end at midnight on 3 June 2016
being 30 months from the date the joint venture commenced, being 3 December 2013.
Sandfire may earn an additional 29% interest in Thaduna/Green Dragon, increasing its total
interest to 80%, by spending an additional $3 million by 4 December 2017.
For further information please contact:
Bruce Maluish, Managing Director
brucem@ventnorresources.com.au
Tel: +61 8 9226 3780
www.ventnorresources.com.au
Media: Warrick Hazeldine/Luke Forrestal
Cannings Purple
Tel: +61 8 6314 6300
whazeldine@canningspurple.com.au
Competent Person’s Statement
The information in this release that relates to Exploration Results is based on, and fairly represents,
information compiled by Mr David Reid who is a Member of the Australasian Institute of Mining and
Metallurgy (MAusIMM). Mr Reid is a contractor to Ventnor Resources Limited. Mr Reid has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the “2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Reid consents to the inclusion in this report of the matters based on information
provided by him and in the form and context in which it appears.
ABOUT VENTNOR
Ventnor Resources is a base-metals focused explorer with a farm-in JV with Sandfire Resources NL at the
historic Thaduna/Green Dragon project, 170 km north of Meekatharra in Western Australia.
The Thaduna/Green Dragon Project is located 40km east of DeGrussa and represents the largest copper
resource in the Doolgunna-Bryah Basin Region outside of Sandfire’s DeGrussa-Doolgunna Project.
As announced, the Company has recently been granted a tenement adjacent to the Tropicana Gold Mine
in WA that is prospective for gold and has had preliminary exploration comprising mapping and rock chip
sampling and a recently completed an initial drill program.
Also in Western Australia, 40 km south of Newman is the Warrawanda nickel project. In western
Queensland, the Georgina Basin project lies within the Mt Isa Inlier, which is well endowed with Iron
Oxide Copper Gold (“IOCG”) systems and sulphide base-metal deposits.
Known Copper and Nickel Mineralisation
The Thaduna/Green Dragon copper project has historic mine production; copper mineralisation has been
confirmed with four phases of exploration drilling; a Scoping Study has confirmed the economic potential
of the project. A farm-in deal has been transacted with Sandfire Resources to develop the project and to
treat ore. The prospectivity of the Warrawanda nickel project was increased when nickel gossans were
identified in recent work. Further work is planned later in 2015.
Proven Management
The Ventnor directors have extensive experience in the management of publicly listed mining and
exploration companies.
The Company is actively seeking and evaluating other base metals projects in Australia.
PROJECT LOCATIONS
Share your feedback
Discover