Half Year Accounts
Released
Released
Announcement PDF
VRX SILICA LIMITED
ABN 59 142 014 873
INTERIM FINANCIAL REPORT
FOR HALF-YEAR ENDED
31 DECEMBER 2022
CORPORATE DIRECTORY
DIRECTORS
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
David Welch (Non-Executive Director)
SECRETARY
Ian Hobson
REGISTERED AND PRINCIPAL OFFICE
Ground Floor, 52 Kings Park Road
West Perth WA 6005
Telephone: (08) 9226 3780
Facsimile: (08) 9226 3764
Website:
www.vrxsilica.com.au
SHARE REGISTRY
Computershare Investor Services Pty Ltd
Level 11, 172 St George's Terrace
Perth WA 6000
Telephone: (08) 9323 2000
Facsimile: (08) 9323 2033
AUDITORS
RSM Australia Partners
Level 32, Exchange Tower
2 The Esplanade
Perth WA 6000
AUSTRALIAN SECURITIES EXCHANGE
VRX Silica Limited shares (VRX) are listed on the
Australian Securities Exchange
VRX Silica Limited
1
DIRECTORS’ REPORT
Your directors submit the financial report of the consolidated entity for the half-year ended 31 December
2022. In order to comply with the provisions of the Corporations Act 2001, the directors report as follows:
DIRECTORS
The names of the Directors who held office during or since the end of the half-year and until the date of
this report are noted below. Directors were in office for this entire period unless otherwise stated:
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
David Welch (Non-Executive Director)
PRINCIPAL ACTIVITIES
The principal continuing activities during the half-year of entities within the consolidated entity was
mineral exploration.
REVIEW OF OPERATIONS
The net loss for the half-year attributable to members of VRX Silica Limited (VRX or Company) was
$2,621,638 (2021: loss of $3,239,861).
The following is a summary of the activities conducted by VRX during the half year ended 31 December
2022 at its Western Australian silica sand projects at Arrowsmith North, Arrowsmith Central (located
270 km north of Perth), Muchea (located 50 km north of Perth) and Boyatup (located 100 km east of
Esperance).
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand exploration and development company with
four high-value, advanced, very long-term silica sand projects in Western Australia, a Tier 1 mining
region.
The Company has multi-decade scale contiguous sand deposits on granted Mining Leases with secure
tenure and a combined +1.1Bn tonne Mineral Resource of 99.6% to 99.9% SiO 2 high grade silica sand
(see table of Combined Mineral Resource on page 18).
The Company and its management team is WA based as are its four large scale, high-grade and low
impurity silica sand projects. Each project can be run independently and will supply high-grade silica
sand to many diverse markets.
VRX Silica Limited
2
DIRECTORS’ REPORT
Figure 1: Project Locations
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and water. It is the main ingredient in all
types of glassmaking, including specialty solar panel and high-tech glass. The glass manufacturing
industry demand is increasing at a rate of 5-6% per year, or about 8-10 million tonnes pa. Around 47%
of the world’s glass is manufactured in Asia.
Silica sand is also an essential component of the foundry and casting industries. The largest foundry
industry is in Korea where it dominates the industry particularly for large marine components.
Silica sand is also the main ingredient in concrete.
Silica sand is a finite resource that is rapidly being exhausted and the Asia-Pacific region is currently
experiencing increasing demand at a time of a global supply shortfall.
A Project development pipeline to ensure a disciplined, staged development of world-class
assets
The Arrowsmith North silica sand project (Arrowsmith North) will lead a staggered and disciplined
development program, followed by the Muchea silica sand project (Muchea) and Arrowsmith Central
(Arrowsmith Central) silica sand project.
VRX has the most-developed ASX listed company silica sand projects in Australia with planning,
Aboriginal heritage, environmental approvals, metallurgical testwork studies and plant engineering well
advanced having commenced in 2017.
VRX Silica Limited
3
DIRECTORS’ REPORT
Mining Leases are granted over these projects as well as various Miscellaneous Licences for access
with permitting and infrastructure preparations well-advanced.
The scale of the projects provides for a long-term opportunity for silica sand export and potential for
glass manufacturing and downstream industries in Western Australia.
Critical Minerals Publication
In December 2022 VRX announced its Arrowsmith North and Muchea projects have been included in
the Australian Critical Minerals Prospectus for 2022 published by Austrade and launched by Minister
Farrell, the Minister for Trade and Tourism.
The prospectus includes technical, commercial, and geological data to facilitate investment into projects
for Australia’s identified critical minerals. To-date, the prospectus has received significant recognition
among interested foreign investors and buyers, Australian corporates, and the Australian government
for its significant role in marketing opportunities in the Australian and export markets.
The recognition by the Australian Government that silicon and silica sand are a critical mineral and that
VRX has significant potential to address anticipated production shortfalls, build supply chain security,
and help deliver progress on a net-zero future is an important step forward.
This publication will enable Austrade to actively promote the VRX products to foreign investors and
potential buyers.
VRX continues to engage with potential buyers that have received samples of products from Arrowsmith
North and Muchea.
Arrowsmith North
The mining and processing operation is relatively simple and low impact with long-term production
expected to commence initially at Arrowsmith North on the 221Mt Proved and Probable Ore Reserve
(9.2Mt Proved and 212Mt Probable) in 2023, subject to final environmental approvals.
A revised capital estimate is currently underway on a tailored 2Mtpa processing plant with a unique
patented custom process circuit.
The results of additional bulk testwork programs undertaken during the March and June 2022 quarters
were received in August 2022. These programs produced sufficient final product for the large samples
(50-60kg) required for glassmaking furnace testing and foundry resin coating testing. The samples have
been forwarded to an extensive list of potential buyers.
The Company has identified long-lead items and has commenced the specification and production of
tender documentation of processing equipment for the plant in preparation for the procurement process
in order to enable a timely construction program following a decision to mine at Arrowsmith North.
Engineering
The Company has undertaken significant steps to finalise the processing circuit design to produce
multiple products and to finalise the detailed engineering required for construction.
The final design phase is progressing to shop detailing of all disciplines - steelwork, mechanicals,
pipework, electrical, air, etc.
The execution schedule has been recently updated with revised lead times for major equipment. Welldocumented supply-side constraints, including COVID lockdowns and supply chain delays in China that
have led to a backlog in production, is affecting equipment delivery globally and there is little certainty
with quoted lead times. Specification and tendering of long lead time equipment is essentially complete
and VRX is awaiting final mining approval and financing to commence procurement of these major
items.
Key Plant Equipment
VRX has previously announced the start of project capital expenditure for its Arrowsmith North
processing plant, with the purchase of two major items of sand processing capital equipment.
VRX Silica Limited
4
DIRECTORS’ REPORT
VRX has purchased locally a 3m diameter x 8m long RCR-designed feed trommel and a 3.6 x 8.5m
Schenck “banana” vibrating screen. This equipment has been refurbished by Bunbury based
workshops.
The banana screen has undergone strip, non-destructive testing and refurbishment by the OEM
(Original Equipment Manufacturer) and is complete.
VRX will continue to pursue other lead time and cost-saving opportunities to capitalise on its first-mover
advantage in Western Australia’s emerging silica sand sector, at a time when there is fast-rising global
demand for high-quality, responsibly sourced silica sand volumes.
Process Water
A process water bore was successfully drilled to access water from the Yarragadee North deep aquifer
with aquifer testing to supply data for an abstraction licence application for 0.9Gl of water. Monitoring
boreholes for the borefield have been completed. The plant has been designed to operate
predominately with recycled water.
VRX has successfully completed a production bore and monitoring bores for abstraction at Arrowsmith
Central. Results from the pump testing at Arrowsmith Central will contribute to the assessment
modelling for both Arrowsmith North and Central water abstraction.
Figure 2: Bore testing equipment
VRX Silica Limited
5
DIRECTORS’ REPORT
Power Supply
The Company continues to engage with local power providers to investigate establishing a power supply
using locally produced LNG. Initial evaluation indicates that there are significant potential savings to
use LNG from the wellhead after it is dewatered and before it is compressed for transport in one of the
two gas pipelines adjacent to the project area. This solution eliminates the transport cost for LNG and
provides a very long term power supply.
In March 2023, the Company entered into a non-binding letter of intent with ResourcesWA to further
investigate this proposal.
ResourcesWA has a fully resourced and operational project development, delivery and asset
management team. The proposal is inclusive of all design, construction and operational requirements
to provide a 100% turn key build, own and operate solution.
The term of the LOI is six months. Its purpose is to investigate the potential to establish a powerhouse,
with containerised gas reciprocating engines, at a nearby gas wellhead site with direct offtake from the
existing gas plant and reticulation to the Arrowsmith North site via a dedicated transmission line.
Desktop modelling indicates that a gas-driven powerhouse and transmission solution is not only cost
effective but will reduce the project footprint and expected greenhouse gas emissions.
Logistics
The Company is continuing discussions with the Mid West Ports Authority (for export of silica sand
product from Geraldton Port) to enable a storage area and shiploading within their Port Maximisation
Plan.
The Company has access to the adjacent Brand Highway and an approved road intersection plan from
Main Roads enable road transport of silica sand product in the short term.
Approvals
VRX has conducted extensive environmental studies on its silica sand projects over a number of
seasons in anticipation of requirements of the State and Federal environmental regulation authorities
to undertake approvals assessments. These surveys commenced shortly after the tenements were
acquired and the number and extent of these surveys have expanded following further consultation with
these authorities. The Company has initially concentrated on gaining approval for development of the
Arrowsmith North project.
VRX has received confirmation from the Commonwealth Department of Agriculture, Water and the
Environment (now Department of Climate Change, Energy, the Environment and Water) for accredited
approval under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
Accreditation of the Environmental Protection Authority of Western Australia’s (EPA) assessment
processes means that the Commonwealth can rely on environmental assessments undertaken by the
EPA for the purpose of its approval decisions under the EPBC Act on proposals that are likely to have
a significant impact on a matter of national environmental significance. If the EPA assesses a proposal
at the level of Public Environmental Review (PER), as is the case for Arrowsmith North, separate
assessment by the Commonwealth is not required.
The Environmental Scoping Document (ESD) was lodged with the EPA in September 2021 and
approved in April 2022.
During May 2022 the Company lodged the initial Environmental Review Document (ERD) for
Arrowsmith North with the EPA. The ERD document is required under the EPA’s public environmental
review process and will be released for public review following review and acceptance by the EPA and
other relevant authorities. The ERD was prepared according to the EPA’s Administrative Procedures,
Procedures Manual and other guidance documents. The ERD is a comprehensive summary of the
project environmental setting, the physical elements of the mine and infrastructure, operational
elements, the extent of effects on the environment and the proposed rehabilitation and closure plan.
The Company received a request from the EPA for further information in early July 2022 and the
response was submitted later that month.
VRX Silica Limited
6
DIRECTORS’ REPORT
As per the Procedures Manual, the ERD was distributed for review by relevant government agencies,
subsequently a request for additional information was received in mid-November 2022. The Company
lodged a revised ERD (Revision D) and response table to address the requested information in
December 2022. The Company now awaits a response and/or acceptance for the ERD for publication,
initiating the four week Public Environmental Review of the ERD.
An important feature of the EPA Proposal is the proposed rehabilitation method to use the unique VDT
method which is estimated to result in the best restoration of the mine area vegetation and habitat.
The VDT methodology can be viewed at:
https://vrxsilica.com.au/miningandrehabilitationmethodology/
Arrowsmith North update to the Mineral Resource Estimate (MRE) and Ore Reserve Statement
(ORS)
On 11 November 2022 VRX announced an update to the Mineral Resource Estimate (MRE) and Ore
Reserve Statement (ORS) for Arrowsmith North.
The MRE update was based on an additional 130 close spaced grade control holes 1. These holes were
drilled as a pre-production activity to increase the resource confidence in the initial years of mining, and
to produce a bulk sample for pilot scale metallurgical testwork and the generation of bulk samples for
potential offtake partners.
A pilot plant testwork of a 3.3 tonne bulk metallurgical composite was completed. In combination with
market analysis a suite of four saleable products have been determined that will be produced from
Arrowsmith North. Process and Engineering design of the proposed Process Plant has been guided by
the chemical and physical specifications of these products. The declaration of these four products was
used to define the saleable Ore Reserve declared in this release.
This updated Mineral Resource and Ore Reserve is a culmination of significant metallurgical testwork
and evaluation of the Resource to determine the premium products VRX can produce.
These products include sought after foundry sand as well as glassmaking sand suitable for flat glass,
including automobile glass and also container glass.
Large samples (50-60kg) have been despatched to several foundry and glassmaking companies in
Korea, Japan and Taiwan for evaluation and subsequent discussions for offtake.
The creation of this JORC compliant Proved Ore Reserve has led to a high confidence mining and
processing schedule of the final products that will be available for sale for the initial 6 years of mining.
This will allow for a proactive marketing effort to return the best economic outcomes from the project.
Future grade control programs and ore reserve updates will not be required for 5 years from the
commencement of mining.
Detailed information on the methodology underpinning the final Mineral Resource Estimate and Ore
Reserve Statement is contained in the Company’s ASX Announcement dated 11 November 2022.
Summary of updated MRE and ORE Information
In March 2021 VRX completed the pre-production activity by conducting a close spaced grade control
drilling program of 130 AC holes with the aim of improving the resource confidence for the initial years
of mining, and to produce a bulk metallurgical composite that represents the material that will be
processed in these initial years and to process this material through a pilot plant that mimics the current
designed process circuit to generate bulk samples for potential offtake partners.
VRX engaged CSA Global to update the Arrowsmith North MRE with the expectation that the new
estimate would not be materially different from the published estimate 2, as the CSA update was confined
to the new data generated by the grade control drilling, see Figure 3, which shows the area (shown in
green) that was included in the updated MRE.
1 ASX announcement of 11 March 2021, “Arrowsmith North Grade Control Drilling”.
2 ASX announcement of 9 July 2019, “Arrowsmith North Mineral Resource Estimate Upgrade”.
VRX Silica Limited
7
DIRECTORS’ REPORT
The updated MRE resulted in a category upgrade to the material in the area grade controlled to a
Measured Resource. A summary of the updated MRE is shown in Table 1. The JORC 2012 Table 1 is
included in Appendix 2 in the Company’s ASX Announcement dated 11 November 2022.
Figure 3: CSA MRE Update – Green area updated
VRX Silica Limited
8
DIRECTORS’ REPORT
Arrowsmith North - Mineral Resources
July 2019 Estimate
SiO₂ Al₂O₃ Fe₂O₃ TiO₂
Classification
Mt
%
%
%
%
Measured
Indicated
248 97.7
1.0
0.4
0.2
Inferred
523 98.2
0.8
0.3
0.2
771 98.0
0.9
0.3
0.2
Total
LOI
%
0.5
0.4
0.4
Updated Estimate
Classification
Mt
Measured
Indicated
Inferred
Total
10
237
521
768
Change
SiO₂
%
95.9
97.7
98.2
98.0
Al₂O₃
%
1.9
1.00
0.80
0.90
Fe₂O₃
%
0.7
0.40
0.30
0.30
TiO₂
%
0.3
0.20
0.20
0.20
LOI
%
0.7
0.50
0.40
0.40
Mt
%
10
-11
-2
-3
-4.6%
-0.4%
-0.4%
*Note: Interpreted mineralisation is domained into different sand types based on drill
logging data and chemical analysis results. Depletion zones include the upper 0.5 m
for rehabilitation purposes, 2 m base of sands within the ‘grade control’ area, iron
richer sand ridges in the west and minor swamp zones in the east and south of the
modelled area. Differences may occur due to rounding.
Table 1: Arrowsmith North Mineral Resource Estimate
Ore Reserve Estimate Update
Cube Consulting was engaged by VRX to complete mining engineering work towards a life of mine
production schedule to provide an updated Ore Reserve estimate for Arrowsmith North.
The scope of work included importing and reconciling the supplied mineral resource block model,
defining mining boundaries for successive schedule timing, preparing the mining area into appropriate
blocks which would form the basis of the mining schedule, preparing a mining schedule for the total
mine life, reporting of the mining schedule physicals including material mined and the associated
products, for inclusion in the financial model, culminating in the reporting of an updated Ore Reserves
estimate for the project.
The production schedule was completed in quarterly increments for the first 7 years, followed by annual
increments for the following 38 years after which the schedule was aggregated and reported in 5-year
increments to the end of the mine’s 111 year life in Figure 5.
Total material movements planned are shown for the first seven years in quarterly increments in Figure
4 and annually for years 8 to 45 in Figure 5.
VRX Silica Limited
9
DIRECTORS’ REPORT
The work completed supports the reporting of an updated Ore Reserve estimate for this project in
accordance with the guidelines in the JORC Code. Proved and Probable Ore Reserves have been
derived from the Measured and Indicated Mineral Resources respectively contained within the mining
lease area M70/1389. The Arrowsmith North updated Ore Reserve estimate is shown in
Table 2.
Arrowsmith North - Ore Reserves
Updated Estimate
Classification
Total
AFS20
AFS35
AFS55
Local
Proved
Probable
Total
Mt
9.2
211.8
221.0
Mt
0.8
24.2
25.0
Mt
3.9
102.5
106.4
Mt
2.7
51.1
53.8
Mt
1.8
34.1
35.9
Prior Estimate
223
Mt
Change
-2.0
Mt
-0.9%
Table 2: Arrowsmith North Open Pit Ore Reserve Estimate – November 2022
The rounding in the above table is an attempt to represent levels of precision implied in the estimation
process which may result in apparent errors of summation in totals shown in rows or columns.
The Prior Estimate relies on VRX’s bankable feasibility study for Arrowsmith North announced to ASX
on 28 August 20193. All material assumptions contained in that study continue to apply and have not
materially changed from the date of release of that study. While VRX considers all of the material
assumptions to be based on reasonable grounds, there is no certainty they will be correct or that the
range of outcomes indicated within the study will be achieved.
3 ASX announcement of 28 August 2019, “Arrowsmith North BFS and Maiden Ore Reserve”.
VRX Silica Limited
10
Year 8
Year 9
Year 10
Year 11
Year 12
Year 13
Year 14
Year 15
Year 16
Year 17
Year 18
Year 19
Year 20
Year 21
Year 22
Year 23
Year 24
Year 25
Year 26
Year 27
Year 28
Year 29
Year 30
Year 31
Year 32
Year 33
Year 34
Year 35
Year 36
Year 37
Year 38
Year 39
Year 40
Year 41
Year 42
Year 43
Year 44
Year 45
VRX Silica Limited
AFS20
AFS20
AFS35
AFS35
AFS55
AFS55
Local Product
Local Product
Overburden Waste
Figure 5: Years 8 to 45 Production Profile
11
Y7_Q4
Y7_Q3
Y7_Q2
Y7_Q1
Y6_Q4
Y6_Q3
Y6_Q2
Y6_Q1
Y5_Q4
Y5_Q3
Y5_Q2
Y5_Q1
Y4_Q4
Y4_Q3
Y4_Q2
Y4_Q1
Y3_Q4
Y3_Q3
Y3_Q2
Y3_Q1
Y2_Q4
Y2_Q3
Y2_Q2
Y2_Q1
Y1_Q4
Y1_Q3
Y1_Q2
Y1_Q1
DIRECTORS’ REPORT
Year 1 to 7 Quarterly Material Mined by Product
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
Overburden Waste
Figure 4: First 7 Years Production Profile
Year 8 to 45 Annual Material Mined by Product
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
DIRECTORS’ REPORT
Figure 6: Mine Schedule Blocks, Development area and Mining Lease Area
VRX Silica Limited
12
DIRECTORS’ REPORT
The schedule targets total product tonnes of 2.2 Mt per annum over the full mine life with the exception
of the first 2 years which are scheduled at half of the full production target as part of a conservative
ramp up plan. The total material mined averages just over the target of product tonnes, which is due to
the very low volumes of overburden waste to be moved to expose the target product material. Total
material movements planned are shown for the first seven years, in quarters in Figure 5 and annually
for years eight to forty five in Figure 6.
Ore Reserve Estimate
At the conclusion of this study, it was demonstrated that the project is economically viable considering
all relevant factors, test work and design criteria, culminating in a financial analysis with favourable
economic metrics.
The work completed supports the reporting of an updated Ore Reserve estimate for this project in
accordance with the guidelines in the JORC Code. Proved and Probable Ore Reserves have been
derived from the Measured and Indicated Mineral Resources respectively, contained within the mining
lease area M70/1389. The Arrowsmith North updated Ore Reserve estimate is shown in Table 3.
Product
Ore Reserve
Total
AFS20
AFS35
AFS55
Local
Classification
Proved
Mt
9.2
Mt
0.8
Mt
3.9
Mt
2.7
Mt
1.8
Probable
211.8
24.2
102.5
51.1
34.1
Total
221.0
25.0
106.4
53.8
35.9
Table 3: Arrowsmith North Open Pit Ore Reserve Estimate – 11 November 2022
The rounding in the above table is an attempt to represent levels of precision implied in the estimation
process which can result in apparent errors of summation in some columns.
VRX Silica Limited
13
DIRECTORS’ REPORT
Figure 7 shows the Arrowsmith North Ore Reserve area.
Figure 7: Arrowsmith North Ore Reserve Area
Future Work
VRX has now completed all mining and processing pre-production works as well as the production of
bulk material of the various final products and detailed engineering design of the planned processing
plant is close to completion. VRX is in the final stages of gaining regulatory approval to commence
construction once all approvals are in place.
VRX Silica Limited
14
DIRECTORS’ REPORT
Arrowsmith Central
Arrowsmith Central is another of the Company’s silica sand projects under development.
Approvals
Arrowsmith Central has moved to the next stage of the environmental approval process with the EPA.
On 20 June 2022 the Company lodged an Environmental Scoping Document (ESD) which details the
environmental studies that are required to inform the assessment of the project. Lodgement of the ESD
is a fundamental step in the EPA administration procedures to inform the Environmental Impact
Assessment of Arrowsmith Central. The Company is confident the ESD addresses the EPA’s
Environmental Principles, Factors and Objectives.
The ESD is under assessment and the Company is seeking feedback from the EPA.
The Company is not in a position at this stage to set a definitive timeline for the approval process for
Arrowsmith Central.
Process Water
On 6 September 2022 VRX announced the completion of the test holes for 2 production water bores
which will be the source of water supply for the proposed processing plant at Arrowsmith Central. The
borehole drilling, construction, test pumping and downhole logging is completed to compile the required
data for the H3 assessment for the abstraction licence.
Muchea
Development of Muchea will follow development at Arrowsmith North.
The Company has had many offtake enquiries for Muchea silica sand from Asian markets and believes
that the consistent production of such high-grade silica sand with a low iron content will be in high
demand as raw material for the manufacture of predominately premium ultra-clear glass production,
particularly for the burgeoning solar panel manufacturing industry. VRX continues to receive these
enquiries on a regular basis.
Environmental Studies
Detailed springtime flora and vegetation studies were undertaken during the springtime months on a
selected priority area of 450Ha.
This survey will comply with the requirements of the Environment Protection Authority Environmental
Factor Guideline: Flora and Vegetation, and Technical Guidance – Flora and Vegetation Surveys for
Environmental Impact Assessment (2016a and 2016b).
The final flora and vegetation report will include previous survey results and the current survey results
from quadrats, targeted searches as well as historical information that relates to the root structure,
density and distribution of the key species.
The Priority Area has been selected as an area that has only two vegetation types and is restricted to
Low Banksia Woodland on loose sand. Which is the Company production target.
Work to date indicates that the selected area has no Priority Species of flora and no thickets of
paperbark which are restricted to low lying areas and generally have more fauna species.
The final report will form the basis of the EPA Proposal Referral for Muchea.
VRX Silica Limited
15
DIRECTORS’ REPORT
Figure 8: Typical vegetation in the Muchea Priority Area
Muchea Aboriginal Heritage
VRX had previously undertaken an Aboriginal Ethnographic and Archaeological heritage survey in 2017
to clear the initial drilling program area, with representatives of the Whadjuk People accompanying the
drill crew.
VRX has undertaken a comprehensive Aboriginal Ethnographic and Archaeological heritage survey
over the Priority Area to identify and understand Aboriginal heritage values within the area to support
future dialogue with the Whadjuk people about the proposed mining project.
During October 2022 an Aboriginal Heritage Work Area Clearance Survey was conducted on the Priority
Area at the Muchea Silica Sand Project with representatives from the Whadjuk People and VRX
managed by Joe Dortch (PhD, Archaeology) with an Ethnographic Survey conducted early November
2022 with representatives from the Whadjuk People and VRX and managed by Dirima Cuthbert (MEnv
Des, BSc Hons, Anthropology) and anthropology assistant Jordanna Rebbeck (BA Anthropology, BA
Archaeology).
No archaeological heritage sites were identified on the archaeological survey. VRX has committed to
continued monitoring by Whadjuk representatives when significant ground disturbing works are
undertaken to identify any material which may come to light as a result of the proposal.
No ethnographic heritage sites were identified on the ethnographic survey. The Proposal will be
managed through a Cultural Heritage Management Plan (CHMP) under the Aboriginal Cultural Heritage
Act (Western Australia) 2021 (to be implemented in 2023).
VRX Silica Limited
16
DIRECTORS’ REPORT
Figure 9: Muchea clearance survey area
Exploration
The samples from the drill program conducted the previous quarter will undergo metallurgical testwork
which will generate further samples for buyer testing following overwhelming interest from potential
offtake partners.
Boyatup
A first pass metallurgical testwork program is underway on drill samples from the March 2022 program
to determine the specification of the potential products that can be produced from the in-situ sand
resource at Boyatup.
Once the potential products that can be produced are identified a marketing study will be completed to
determine the focus to maximise the economic value of the project.
Geothermal Exploration Permit Applications
In January 2022 DMIRS released 21 areas in Western Australia for applications for Geothermal
Exploration Permits with a closing date for applications of 21 April 2022.
VRX made a number of a
Share your feedback
Discover