Arrowsmith Brand Mineral Resource Estimate
Released
Released
Announcement PDF
ASX Announcement
9 May 2023
Arrowsmith Brand Mineral Resource Estimate
Highlights:
New Silica Sand Mineral Resource Estimate at
Arrowsmith Brand Project
New Project at Arrowsmith with an Inferred Resource of
523 Mt @ 97.3% SiO2
Drill program added 268 Mt @ 96.7% SiO2 to overall
VRX Silica Mineral Resource Estimate
New Mining Lease application for Arrowsmith Brand
ASX: VRX
Capital Structure
Shares on Issue:
560.4 million
Unlisted Options:
41.3 million
Corporate Directory
VRX Silica Limited (VRX Silica or Company) (ASX: VRX) is
pleased to announce the Company has extended its known
JORC 2012 compliant Resources at the Arrowsmith Silica Sand
Project area with a new Resource at its newly named Arrowsmith
Brand project, located 270km north of Perth.
The new Resource is contiguous and south of the Arrowsmith
North Silica Sand Project and bounded to the south by the Brand
Highway road reserve.
VRX Silica Managing Director Bruce Maluish said: “The
combined Resources at the Arrowsmith Projects now provide a
future pipeline of additional production utilising some of the
infrastructure to be developed at the Arrowsmith North Project.
“Although development of Arrowsmith Brand is not a priority at
the moment, VRX is cognizant of the extended timelines that are
now commonplace for mining approvals and this project has the
potential to expand production to meet ever increasing demand
for silica sand products.
The silica sand at Brand is similar to Arrowsmith North and
testwork to-date has included samples from within this Resource
and indicated similar products can be produced.
Paul Boyatzis
Non-Executive
Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north
of Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
“Following the production of the preliminary estimate at Brand,
VRX has lodged an application for a Mining Lease at Brand and
this pending.”
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
The Arrowsmith Brand Mining Lease Application M 70/1418 has
an area of 1,995 Ha and predominately within Exploration
Licence E70/5027, partially within E70/5109 and is contiguous
with the granted Arrowsmith North Mining Lease M70/1389,
Figure 1 below.
The Company is actively
assessing other silica
sand projects in
Australia.
Figure 1: Arrowsmith Brand Silica Sand Project Location
2
Detailed Information
An opportunity to generate an additional silica sand project focused on an area of the
Arrowsmith North mineral resource area that is not in the near-term development pipeline. By
splitting the existing Arrowsmith North Project at the southern boundary of the granted mining
lease M70/1389, see Figure 1, the Arrowsmith Brand Silica Sand Project (Arrowsmith Brand)
was created.
Arrowsmith Brand contains a subset of the previously reported Arrowsmith North mineral
resource estimate (MRE)1, also Figure 1. Table 1 shows the prior Arrowsmith North MRE split
between the new Arrowsmith Brand Project and the Arrowsmith North Project.
Arrowsmith North - Mineral Resource
Classification
Measured
Indicated
Inferred
Total
11 November 2022 Estimate
SiO₂ Al₂O₃ Fe₂O₃ TiO₂
Mt
%
%
%
%
10 95.9
1.9
0.7
0.3
237 97.7 1.00
0.40
0.20
521 98.2 0.80
0.30
0.20
768 98.0 0.90
0.30
0.20
LOI
%
0.7
0.50
0.40
0.40
Arrowsmith North Mineral Resource
in Arrowsmith Brand Project
Classification
Mt
Inferred
Total
255
255
SiO₂
%
98.0
98.0
Al₂O₃
%
0.91
0.91
Fe₂O₃
%
0.31
0.31
TiO₂
%
0.17
0.17
LOI
%
0.44
0.44
TiO₂
%
0.3
0.2
0.2
0.2
LOI
%
0.7
0.5
0.4
0.4
Arrowsmith North Mineral Resource
Ex Arrowsmith Brand Project
Classification
Mt
Measured
Indicated
Inferred
Total
10
237
266
513
SiO₂
%
95.9
97.7
98.4
98.0
Al₂O₃
%
1.9
1.0
0.7
0.9
Fe₂O₃
%
0.7
0.4
0.3
0.3
Table 1: Prior Arrowsmith North MRE apportioned to Brand Mineral Resource
In December 2022, VRX Silica completed a vacuum drilling program in the Arrowsmith North
project area extending into the Arrowsmith Brand project area, see
Figure 2. A total of
68 holes for 786m were drilled on M70/1389 to gain material for future metallurgical testwork
within the proposed Arrowsmith North mining area. These holes infill the existing 50m spaced
grade control drilling which was used to estimate the measured resource and proven reserve1.
These samples will not materially change these estimates and have not been assayed.
An additional 49 holes for 656m were drilled on existing tracks to the south in what is now
known as the Arrowsmith Brand Project. These holes infill and extend the prior reported MRE
for Arrowsmith North. Drilling intersected high quality silica sand which has been assayed and
modelled and has resulted in a MRE for the Arrowsmith Brand Project Area.
1 ASX announcement of 11 November 2022, “Arrowsmith North Mineral Resource and Ore Reserve Update”.
3
Figure 2 – December 2022 Drill hole locations.
The Arrowsmith Brand MRE is reported in accordance with the JORC Code 2012 Edition.
Drilling was completed generally on an 800m x 800m drill hole grid and defines a band of
homogeneous yellow sand overlying white sand. Drilling encountered zones of clay rich fine
sand which was excluded from the MRE. The potential silica sand products from Arrowsmith
Brand are expected to be suitable for industries such as flat, automobile and container glass
manufacturing and foundry casting.
The Arrowsmith Brand MRE is shown in Table 2. A drill hole listing is tabulated in Appendix 1
and summary information is included in this announcement and a JORC 2012 Table 1 is
included in Appendix 2.
4
Arrowsmith Brand Mineral Resource Estimate – as at 09/05/2023
Zone
Mt
SiO₂ %
Al₂O₃ %
White
144
98.4
0.8
Fe₂O₃
%
0.2
Yellow
379
96.9
1.6
Total
523
97.3
1.4
Increase over Prior Estimate
268
Classification
Inferred
TiO₂ %
LOI %
0.2
0.4
0.5
0.2
0.7
0.4
0.2
0.6
Million Tonnes
*Note: Interpreted mineralisation is above a basal layer of clay and/or limestone. Depletion zones include the upper 0.3
m excluded for rehabilitation purposes. Only areas with a minimum sand depth of 1m were included. Differences may
occur due to rounding. Prior estimate is summarised in Table 1.
Table 2:
Brand Mineral Resource
ASX Listing Rule 5.8.1 Summary
The following summary presents a fair and balanced representation of the information
contained within the MRE technical report:
Geology and Geological Interpretation
Silica sand mineralisation at Arrowsmith Brand occurs within the coastal regions of the Perth
Basin, and the targeted silica sand deposits are aeolian sand dunes that overlie limestones
and paleo-coastline.
The geological modelling was completed based on government soil mapping data in
conjunction with vacuum and AC drill logging data. The Mineral Resources were estimated
using an inverse distance squared grid interpolation informed by domained drill hole
composites. The horizontal extents of the interpreted sand layers are limited to an 800m buffer
away from drill holes.
The silica sands are covered by a 300 m thick humus layer and are underlain by clay layers
and/or limestone.
Drilling Techniques
Drilling over the project area was completed by means of vacuum drilling. Drilling was
completed along existing tracks with a drill spacing of 800 m resulting in an effective spacing
of 800m x 800m.
Drill hole depths range between 2 m and 26 m with an average depth of 13.2 m. All holes were
drilled vertically.
Drill hole collar locations are shown in Figure 2, with the full drill hole listing in Appendix 1.
Sampling and Sub-sampling Techniques
Vacuum drilling samples are 1 m down hole intervals with sand collected from a mounted
vacuum flask, approximately 2kg (representing 100% of the drilled sand) was collected. Two
sub-samples, A and B, of approximately 200 g were taken from the drill samples. Samples
were bagged and ticketed with sample numbers prior to transport to the analytical laboratory.
Sample Analysis Method
The “A” samples from all drilling were submitted to Intertek Laboratory, located in Maddington,
W.A. The samples were dried and then pulverised in a zircon bowl to reduce the particle size
to -75 μm. Multi-element analysis from the pulverised samples was completed by an initial
5
four-acid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids in Teflon
tubes. The digest was then analysed by means of Inductively Coupled Plasma Optical
(Atomic) Emission Spectrometry (ICP-OES) analysis. Loss on Ignition at 1000°C (LOI) was
analysed by Thermal Gravimetric Analyser (TGA). Silica is then reported by difference (SiO2
% = 100% - (LOI % + Major oxides)).
The assay results have also undergone internal laboratory quality assurance (QA), which
includes the analysis of standards, blanks, and repeat quality control (QC) samples. Standards
were included in the drill sample submissions at a ratio of 1:20. Field duplicate samples were
submitted in a ratio of 1:20, and the laboratory routinely duplicated analyses from the
pulverised samples at a ratio of 1:25.
An analysis of all the QC data was undertaken and validates the drill assay dataset for use in
the Mineral Resource estimate.
Estimation Methodology
A regularized 50m spaced square grid was created over the project extent. Grades
interpolated onto the gride include SiO2, Al2O3, Fe2O3, LOI (1000°C), and TiO2. Grades from
composited data were interpolated into the parent cells by inverse distance squared. Grid
values were estimated using a search ellipse of 800 m.
Hard boundary estimation was used when estimating by domaining the interpolated layers
from the drill hole assays such that samples from one sand domain could not be used to
interpolate other domains.
A dry bulk density value of 1.66 t/m3 was applied to all blocks in the white and yellow sand
domains.
Mineral Resource Classification
The Mineral Resource has been classified based on the guidelines specified in The JORC
Code. The classification level is based upon an assessment of geological understanding of
the deposit, geological and mineralisation continuity, drillhole spacing, QC results, search and
interpolation parameters and an analysis of available density information. JORC Code Clause
49 was also considered when classifying the Mineral Resource.
All material within the Arrowsmith Brand Mineral Resource is classified as Inferred.
Silica sand Mineral Resources must be reported at least in terms of purity and size distribution,
in addition to SiO2 and tonnes, and should also take account of logistics and proximity to
markets. Likely product specifications for the Arrowsmith North deposit are applicable for the
Arrowsmith Brand deposit and supported by the results of the composite sample process test
work program undertaken between 2018 and 2021.
Cut-Off Grades
No cut-off grades were used for reporting the Mineral Resource. The Mineral Resource is
reported from all classified blocks with interpolated SiO2 grades.
Modifying Factors
VRX has completed metallurgical test work on composites of selected drill hole samples during
2018, 2019 and 2021 to gain knowledge of attributes including final product size distribution,
purity and particle shape, so as to allow consideration of potential product specifications and
general product marketability. This testwork is considered applicable to the Arrowsmith Brand
6
material as prior testwork included samples from within this MRE. Discussion of results is
presented in JORC Table 1 (Section 3), in Appendix 2.
The Competent Person is of the opinion that process test work on the composite drill samples
indicates the Arrowsmith Brand deposit should be suitable for the eventual production of silica
sand for glass, ceramic and foundry markets. In addition, project location and logistics support
the classification of the Arrowsmith Brand deposit as an industrial Mineral Resource in terms
of Clause 49 of the JORC Code.
Reasonable Prospects Hurdle
The Competent Person deems that there are reasonable prospects for eventual economic
extraction on the following basis:
•
Available process testwork indicates that likely product qualities for glass, ceramics and
foundry sand are considered appropriate for eventual economic extraction from
Arrowsmith Brand.
•
Potentially favourable logistics and project location support the classification of the
Arrowsmith Brand deposit as an industrial Mineral Resource in terms of JORC Clause 49.
•
The deposit is located adjacent to major road and rail infrastructure, and is 270 km north
of Perth, which offers a large and suitably qualified workforce to develop the Project.
•
The Mineral Resource has no overburden (excluding a shallow zone of sand to be retained
for rehabilitation purposes) and is of shallow depth.
Resource Estimation Methodology
Drilling was logged by colour and reviewed for iron content and 3 domains were created;
•
•
•
white sand <2,000ppm Fe2O3
yellow sand >2,000ppm <10,000ppm Fe2O3
high iron sand >10,000ppm Fe2O3. The high iron sand coincided with other elevated
minerals included Al2O3, CaO3, TiO2 and LOI.
Resource modelling was completed on these three interpreted domains.
A grid interpolation of each domain was performed on a 50 by 50m grid overlaid on the drilling
area with a 800m extended buffer, see Figure 3. Drilling composites were created for each
domain representing the depth and average assay for the major elements, including LOI, the
SiO2 grade was determined by difference. The grid points were determined using an inverse
distance squared weighting to interpolate the grid values. Grid point data was exported to
excel to report the global averages for each domain.
7
Figure 3 - 800m buffer around December 2022 Drilling
For reporting purposes the MRE was restricted to a maximum distance of 400m from drill
holes and a minimum of 200m from the north side of the Brand Highway, Figure 4, the area
within the existing Arrowsmith North MRE was also excluded.
Figure 4 - 400m buffer around December 2022 drilling and 200m north of Brand Highway
8
Future Work
VRX has lodged a mining lease application over 1,995 Ha, details Table 3 see Figure 1. The
application is in the final stages of the DIMRS process and the Company expects grant in the
near term. Once granted VRX expects to advance the project using the well known process
that has been followed at the 3 other silica sand projects that are currently being actively
developed. These activities include; environmental surveys, further metallurgical testwork,
marketing studies and mine planning studies, which will inform scoping and pre-feasibility
studies.
Tenement
Holder
Application date
Grant Date
Area (Ha)
M 70/1418
Ventnor Mining Pty Ltd
01/08/2022
Pending
1,995
Table 3: Arrowsmith Brand tenement application details
9
VRX Silica Limited – Summary of Silica Sand Mineral Resources and Ore Reserves
Mineral Resources - as at 09/05/2023
Project
Mt
SiO₂
%
Fe₂O₃
%
TiO₂
%
LOI
%
29
179
208
10
237
266
513
523
523
28.2
48.3
76.5
60
60
1,381
99.6
0.1
0.0
99.6
0.1
0.0
99.6
0.1
0.0
95.9
1.9
0.7
97.7
1.0
0.4
98.4
0.7
0.3
98.0
0.9
0.3
97.3
1.4
0.4
97.3
1.4
0.4
96.6
1.7
0.4
96.9
1.5
0.4
96.8
1.5
0.4
67.8
0.8
0.2
67.8
0.8
0.2
Million Tonnes
0.1
0.1
0.1
0.3
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.2
0.2
0.2
0.7
0.5
0.4
0.4
0.6
0.6
0.7
0.7
0.7
0.9
0.9
Classification
Muchea
Arrowsmith
North
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Inferred
Arrowsmith
Brand
Total
Indicated
Arrowsmith
Inferred
Central
Total
Inferred
Boyatup
Total
Total Mineral Resource
Al₂O₃
%
Ore Reserves
Project
Classification
Product
Mt
Muchea
Probable
F80
F80C
F150
AFS20
AFS35
Proved
AFS55
Local
Proved Ore Reserve
Arrowsmith
North
AFS20
AFS35
Probable
AFS55
Local
Probable Ore Reserve
Arrowsmith North Ore Reserve
CF400
C20
Arrowsmith
Probable
C40
Central
High TiO2
10.2
4.25
4.25
18.7
0.8
3.9
2.7
1.8
9.2
24.2
102.5
51.1
34.1
212
221
4.2
8.4
4.2
2.2
Arrowsmith Central Ore Reserve
Total Ore Reserve
18.9
259
Muchea Ore Reserve
SiO2
%
Al2O3
%
Fe2O3
%
TiO2
%
LOI
%
99.9
0.02
0.008
0.03
0.1
99.8
0.07
0.015
0.035
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.04
0.03
0.1
<1%
2%
Million Tonnes
Million Tonnes
99.6
0.25
Million Tonnes
Million Tonnes
10
Competent Person’s Statement and Notice
The information in this document that relates to Arrowsmith Brand Exploration Results and
Arrowsmith Brand Mineral Resource Estimate is based on data collected under the
supervision of Mr David Reid, in his capacity as Exploration Manager. Mr Reid, BSc (Geology),
is a registered member of the Australian Institute of Geoscientists and has sufficient
experience that is relevant to the style of mineralisation and type of deposit under
consideration and the activity being undertaken to qualify as a Competent Person under the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Reid consents to the inclusion of the data in the form and
context in which it appears.
The information in this document that relates to the estimation and reporting of the Mineral
Resources and Ore Reserves for the Company’s projects are extracted from releases to ASX
on 28 August 2019 and 11 November 2022 (Arrowsmith North), 15 August 2019 and 17
September 2019 (Arrowsmith Central), 18 October 2019 (Muchea) and 18 August 2022
(Boyatup). The Company confirms that it is not aware of any new information or data that
materially affects the information included in this document and all material assumptions and
technical parameters underpinning the estimates continue to apply and have not materially
changed.
This announcement has been authorised for release to ASX by the Board of Directors.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 540
11
APPENDIX 1 – Drill Hole Listing
Hole_ID
MGA_Nth
MGA_East
RL
Hole_Depth
Date Drilled
BRAV001
6732902
316139
38.3
15
9/12/2022
BRAV002
6732240
316142
37.6
14
9/12/2022
BRAV003
6732920
316700
43.7
17
9/12/2022
BRAV004
6732258
316809
39.1
16
9/12/2022
BRAV005
6731557
316419
36.3
7
9/12/2022
BRAV006
6731554
316002
38.1
7
9/12/2022
BRAV007
6731544
315549
39.1
16
9/12/2022
BRAV008
6730870
314800
31
8.1
9/12/2022
BRAV009
6730777
315516
34.3
6
10/12/2022
BRAV010
6730757
316400
36.4
7.2
10/12/2022
BRAV010A
6730757
316401
36.4
7.2
10/12/2022
BRAV011
6731570
317201
39.8
17
10/12/2022
BRAV012
6731582
318001
46.5
24
10/12/2022
BRAV013
6731592
318791
49.5
19.5
10/12/2022
BRAV014
6731604
319606
45.1
14
10/12/2022
BRAV015
6731618
320403
40.9
10
10/12/2022
BRAV016
6731632
321175
43.4
8.5
10/12/2022
BRAV017
6730843
321213
42.9
8
10/12/2022
BRAV018
6730829
320408
40.4
8
10/12/2022
BRAV019
6730811
319608
51.1
26
10/12/2022
BRAV020
6730797
318797
49.4
25
11/12/2022
BRAV020A
6730796
318796
49.4
25
11/12/2022
BRAV021
6730784
318043
38.7
15
11/12/2022
BRAV022
6730769
317205
39.6
17
11/12/2022
BRAV023
6729880
317200
37
9
11/12/2022
BRAV024
6729814
318043
39.9
17
11/12/2022
BRAV025
6729210
318604
42
19
11/12/2022
BRAV026
6729113
317352
38.9
10
11/12/2022
BRAV027
6729875
316399
36
8
11/12/2022
BRAV028
6729087
316175
36.9
10
11/12/2022
BRAV029
6729502
314801
34.1
5
12/12/2022
BRAV030
6729030
315597
35.6
4
12/12/2022
BRAV031
6728456
316406
45.3
7
12/12/2022
BRAV031A
6728455
316407
45.3
4
12/12/2022
BRAV032
6728185
317207
38.5
11
12/12/2022
BRAV033
6728196
318008
40.5
2
12/12/2022
BRAV034
6728208
318800
43.3
20
12/12/2022
BRAV035
6728217
319602
44.7
13
12/12/2022
12
Hole_ID
MGA_Nth
MGA_East
RL
Hole_Depth
Date Drilled
BRAV036
6728231
320395
47
6.5
12/12/2022
BRAV037
6728242
321210
48.3
13.2
12/12/2022
BRAV038
6727456
321190
49.9
10
12/12/2022
BRAV039
6727446
320404
47.7
23.5
12/12/2022
BRAV040
6727444
319606
45.7
20
12/12/2022
BRAV040A
6727444
319604
45.7
19
12/12/2022
BRAV041
6727545
317995
39.6
18
13/12/2022
BRAV042
6726571
319605
45
13
13/12/2022
BRAV043
6726086
320456
48.6
14.5
13/12/2022
BRAV044
6725634
321230
51.7
20
13/12/2022
BRAV045
6726557
320787
49.5
14
13/12/2022
13
APPENDIX 2 – JORC 2012 Table 1
Section 1: Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
Drilling techniques
Drill sample
recovery
Logging
Subsampling
techniques and
sample
preparation
Vacuum drilling samples are 1 m down hole intervals with sand collected from a
mounted vacuum flask, approximately 2kg (representing 100% of the drilled sand)
was collected. Two sub-samples, A and B, of approximately 200 g were taken from
the drill samples. Samples were bagged and ticketed with sample numbers prior
to transport to the analytical laboratory. The remaining bulk sample is retained for
each 1m interval for metallurgical testwork.
The “A” sample was submitted to the Intertek Laboratory in Maddington, Perth for
drying, splitting (if required), pulverisation in a zircon bowl and a specialised silica
sand 4 acid digest and Inductively Coupled Plasma Mass Spectrometry analysis.
The targeted mineralisation is unconsolidated silica sand dunes, the sampling
techniques are “industry standard”.
Due to the visual nature of the material, geological logging of the drill material is
the primary method of identifying mineralisation.
The Competent Person is satisfied that the sampling techniques are appropriate
for this style of deposit, and for use in Mineral Resource estimation.
Vertical 75mm sized vacuum drilling was completed by a Contract Drilling
Company using a tractor mounted vacuum drill rig.
The Competent Person is satisfied that the drilling techniques are appropriate for
this style of deposit, and for use in Mineral Resource estimation.
Aircore:
• Visual assessment and logging of sample recovery and sample quality.
• Reaming of hole and clearance of drill string after every 3m drill rod.
• Sample vacuum flask cleaned regularly to prevent sample contamination.
• No relationship is evident between sample recovery and grade.
The Competent Person is satisfied that the sample recoveries are appropriate for
this style of deposit, and for use in Mineral Resource estimation.
Geological logging of drill samples is done by the field geologist with samples
retained in chip trays for later interpretation.
Logging is captured in an Excel spreadsheet, validated and uploaded into an
Access database.
This information is of a sufficient level of detail to support the Mineral Resource
estimate.
The Competent Person is satisfied that the geological logging techniques are
appropriate for this style of deposit, and for use in Mineral Resource estimation.
The full vacuum drill sample is retained in a calico bag resulting in 2kg of dry
sample, 2 x 200g sub-samples, A and B, are taken from the drill sample. The A
sample is submitted to the laboratory and the B sample is retained for repeat
analysis and QA/QC purposes. The bulk sample is retained for later metallurgical
testwork.
The sample size is considered appropriate for the material sampled.
The 200g samples are submitted to the Intertek Laboratory in Maddington. Intertek
use a zircon bowl pulveriser to reduce the particle size to -75µm.
The Competent Person is satisfied that the sub-sampling techniques and sample
preparation are appropriate for this style of deposit, and for use in Mineral
Resource estimation.
14
Criteria
Commentary
Quality of
analytical data and
laboratory tests
Samples were submitted for analysis to the Intertek Laboratory in Maddington in
Perth WA. The assay methods used by Intertek are as follows: multi-elements are
determined by a specialised four-acid digest including Hydrofluoric, Nitric,
Perchloric and Hydrochloric acids in Teflon tubes. Analysed by Inductively
Coupled Plasma Mass Spectrometry, silica is reported by difference.
The assay results have also undergone internal laboratory quality assurance (QA),
which includes the analysis of standards, blanks, and repeat quality control (QC)
samples.
The Company has been validating a high-purity silica standard that was created
for the Company by OREAS Pty Ltd. This was required as there is no commercial
standard available for high purity silica sand. The standard was “round robin”
assayed at several laboratories in Perth prior to the commencement of drilling.
The standard was then included in the drill sample submissions to Intertek, in
sequence, on a ratio of 1:20. Field duplicate samples were submitted in a ratio of
1:20 and in addition to this Intertek routinely duplicated analysis from the
pulverised samples in a ratio of 1:25. The number of QC samples therefore
represents ~14% of the total assays.
A full analysis of all the QC data has been undertaken. This analysis validates the
drill assay dataset and conforms with the guidelines for reporting under the JORC
Code.
The Competent Person is satisfied that the QA procedures put in place are
appropriate for this style of deposit, and for use in Mineral Resource estimation.
Significant intersections were validated against geological logging.
10% of all drill holes are twin drilled which shows strong correlation between the
paired assays.
Vacuum drill hole locations were measured by hand-held GPS with the expected
relative accuracy; GDA94 MGA Zone 50 grid coordinate system is used.
The Competent Person is satisfied that the surveying techniques and accuracy of
data are appropriate for this style of deposit, and for use in Mineral Resource
estimation.
Vacuum holes were spaced 800m apart along existing tracks.
No sample compositing (down hole) has been completed.
Sampling is being undertaken on aeolian sand dunes and all holes were drilled
vertically. The drill orientation is therefore considered appropriate to the geological
controls affecting mineralisation.
Verification of
sampling and
analyses
Location of data
points
Data spacing and
distribution
Orientation of data
in relation to
geological
structure
Sample security
Audits or reviews
All samples are selected onsite under the supervision of VRX Geological staff.
Samples are delivered to the Intertek laboratory in Maddington. Intertek receipt
received samples against the sample dispatch documents and issued a
reconciliation report for every sample batch.
There has been no audit or review of sampling techniques and data.
15
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Commentary
Mineral tenement
and land tenure
status
All drilling supporting the Arrowsmith Brand Mineral Resource has been within
tenement E70/5027, which is owned by Ventnor Mining Pty Ltd, a 100% owned
subsidiary of VRX Silica Limited. The tenement was granted 14 June 2018 and all
drilling was conducted on vacant crown land.
Exploration done by Minor exploration for oil and gas, and for mineral sands was completed by various
other parties
companies.
Other than work completed by VRX, no exploration for silica sand has been
completed.
Geology
Most economically significant silica sand deposits in Western Australia are found
in the coastal regions of the Perth Basin, and the targeted silica sand deposits are
the aeolian sand dunes that overlie Pleistocene limestones and paleo-coastline,
which also host the regional heavy mineral deposits. Within the project area, data
obtained from the Department of Agriculture soil mapping shows there are pale
and yellow deep sands predominating with lesser swampy areas and occasional
iron rich sand ridges.
Locally the silica sand deposit is understood to be layered where yellow sand is
deposited it is underlain by white sand. The silica sand deposit is bounded at depth
by a basal limestone which is closer to the surface in the south and deeper in the
north.
Drillhole information Not relevant. Exploration results are not being reported. Mineral Resources are
being disclosed (see Section 3). Sample and drillhole coordinates are provided in
Appendix 1.
Data aggregation
Not relevant. Exploration results are not being reported. Mineral Resources are
methods
being disclosed (see Section 3).
Relationship
Not relevant. Exploration results are not being reported. Mineral Resources are
between
being disclosed (see Section 3).
mineralisation
widths and intercept
lengths
Diagrams
Refer to figures within the main body of this report.
Balanced reporting Not relevant. Exploration results are not being reported. Mineral Resources are
being disclosed (see Section 3).
Other substantive
Geological observations are consistent with aeolian dune mineralisation.
exploration data
Seven, certified, dry in situ bulk density measurements were completed by
Construction Sciences Pty Ltd using a nuclear densometer.
Groundwater was intersected in only a few holes that were drilled deeper
deliberately to ascertain the position of the water table. The water table is typically
below 15m depth.
The mineralisation is unconsolidated sand.
There are no known deleterious substances.
Further work
VRX has lodged a mining lease application over 1,995 Ha, details within the main
body of this report. The application is in the final stages of the DIMRS process and
the Company expects grant in the near term. Once granted VRX expects to
advance the project using the well known process that has been followed at the 3
other silica sand projects that are currently being actively developed. These
activities include; environmental surveys, further metallurgical testwork, marketing
16
Criteria
Commentary
studies and mine planning studies, which w