Option over Muchea Silica Sand Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
26 March 2018
Option over Muchea Silica Sand Project
ASX: VRX
Capital Structure
Highlights:
•
High-quality silica sand deposit
•
Significant potential for high tonnage resource
•
Muchea complements Arrowsmith Silica Sand Project
Ventnor Resources Ltd (Ventnor or Company) (ASX: VRX) is pleased to
announce it has secured an option to acquire a potentially high-grade, high
tonnage silica sand project near Muchea, north of Perth, Western Australia
(Muchea Silica Sand Project), subject to shareholder and regulatory
approvals.
The Muchea Silica Sand Project is strategically located adjacent to Brand
Highway and a rail connection to Kwinana port for bulk handling.
The Company has undertaken a due diligence review which confirms the
potential of the prospect. Assays received have indicated a high-quality
+99.7% SiO2 deposit over an area of more than 3,400Ha.
ASX has determined that the option grant constitutes a change in the nature
and/or scale of the Company’s activities and that ASX Listing Rules 11.1.2
and 11.1.3 apply. As a consequence:
(a)
Shares on Issue:
251.3 million
Unlisted Options:
21.25 million
Corporate
Directory
Paul Boyatzis
Non-Executive
Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive
Director
John Geary
Company Secretary
the proposed transaction requires shareholder approval under the
ASX Listing Rules and therefore may not proceed if that approval is
not forthcoming;
Company Projects
(b)
the Company is required to re-comply with ASX’s requirements for
admission and quotation and therefore the proposed transaction
may not proceed if those requirements are not met;
Arrowsmith Silica
Sands Project, 270km
north of Perth, WA.
(c)
ASX has an absolute discretion in deciding whether or not to readmit the Company to the Official List and to quote its securities and
therefore the proposed transaction may not proceed if ASX
exercises that discretion; and
(d)
investors should take account of these uncertainties in deciding
whether or not to buy or sell the Company’s securities.
Biranup base metals
and gold Project
adjacent to the
Tropicana Gold Mine,
WA.
Further information is set out below.
Warrawanda Nickel
Project south of
Newman, WA.
The Company is
actively assessing
other projects in
Australia.
Overview of the Muchea Silica Sand Project
The Muchea Silica Sand Project comprises exploration licence E70/4886 (Tenement), located
in the Muchea area, 50km north of Perth, Western Australia (Figure 1), and is highly prospective
for high-quality silica sand. It spans an area of 58km2.
Figure 1: Muchea Silica Sand Project Location
The targeted silica sand deposits are the aeolian sand dunes that overlie the Pleistocene
limestones and paleo-coastline which host the Gingin heavy mineral deposits.
The image (Figure 2) below is a schematic section showing the silica sand dune that is targeted
for exploration. The targeted dune is the area above the surrounding natural surface and well
above the standing water table. The photograph (Figure 3) below shows the extent of the dune
looking east.
2
Figure 2: Schematic section of Silica Sand Dune Exploration Target
Figure 3: Photograph of silica sand dune exploration target looking east
3
The image (Figure 4) below is a topographic map of the area generated by Shuttle Radar
Topography Mission data (SRTM). This map shows the topographic highs which will be
explored for silica sand.
Figure 4: Muchea Silica Sand Project SRTM topographic map
Limited historical exploration for silica sand has been undertaken in the Project area.
The Company has been provided details of a reconnaissance sampling program utilising the
existing accessible tracks. A total of 44 hand auger samples to a depth of around 2 metres
were completed, the sample locations are shown in the plan (Figure 5) below.
The samples were submitted to the SGS laboratory in Perth and analysed for SiO2, via ICP
silica by difference, with the results shown in the table (Figure 6) below. The results indicate
that at the surface there exists very high purity silica sand with the average of all samples
returning +99.8% SiO2 + LOI1000C.
4
Figure 5 Topographical contours and hand auger sampling locations.
5
Figure 6. SGS Laboratory assay results from hand auger samples
The major impurities identified by the assay results are TiO2, Al2O3 and Fe2O3, with TiO2 being
the most significant. Given Ventnor’s experience with testwork completed at its Arrowsmith
Silica Sand Project, it is expected that a significant amount of these impurities will be able to
be removed using conventional sand processing techniques such as gravity separation by
spirals, attritioning, sizing and magnetic separation.
It is believed that, if the in-situ resource reflects the shallow auger samples, then a product
grade higher than 99.9% SiO2 + LOI1000C is achievable.
A JORC 2012 Table 1 Report is set out in Schedule 1.
6
The Company has conducted field visits to determine the potential extent of the prospect. Initial
due diligence has comprised the undertaking of deeper sampling of the site pursuant to a
granted programme of work (POW), limited to existing tracks, through 46 air core (AC) drill
holes at a combined 522 metres and a further 44 hand auger holes for near surface samples.
In situ bulk density analysis has also been undertaken by densitometer.
Testing of those samples is currently being undertaken.
In addition, a bulk sample of 250kg has been dispatched to a specialist laboratory to finalise
the recoveries of silica sand products and potential values.
Muchea Project Transaction Details
The Company has entered into an agreement with Australian Silica Pty Ltd, an unrelated
Australian proprietary company (AS) pursuant to which it has taken an option to purchase the
Tenement (Option).
Wisecat Pty Ltd (Wisecat), a recently incorporated unrelated Australian proprietary company,
has taken an assignment of the Option to allow for payment of the option fee of $250,000 to
AS prior to the Company obtaining shareholder approval as required by ASX. The sole
shareholder of Wisecat is Goldfire Enterprises Pty Ltd, a company controlled by Mr Robert
Martin. The Company has agreed to purchase all of the issued shares in Wisecat, subject to
shareholder and regulatory approvals and ASX conditional approval for the re-listing of the
Company on ASX, for $250,000, payable in fully paid ordinary shares in the Company (Ventnor
Shares) at an issue price equal to 50% of the proposed price under the Company’s proposed
re-compliance capital raising (see further information below). Wisecat has no material assets
other than the Option.
The terms of the Option and Tenement purchase are as follows:
(a)
Option Term – The Option term is 2 years, expiring 31 January 2020, however this
period will be automatically extended for further periods of six months each for material
delays in the Company obtaining relevant approvals for the Tenement. During the
Option term, the Company will be entitled to: (i) exclusive possession of the Tenement,
keeping the Tenement in good standing at all times; and (ii) carry on such prospecting,
exploration or mining activities on the Tenement as the Company thinks fit with a view
to determining a JORC compliant resource of silica or other high grade sand.
(b)
Option Exercise – If the Option is exercised, completion of the sale and purchase of
the Option must take place within 30 days of the date of exercise.
(c)
Initial consideration – The Company must pay an initial consideration of 10,000,000
Ventnor Shares within 30 days of Option exercise, to be issued directly to AS
shareholders registered in that capacity as at the date of Option exercise in proportion
to their respective holdings. Such Ventnor Shares will be escrowed for 12 months from
their date of issue.
(d)
Deferred Consideration – Deferred consideration is not payable until the Company has
undertaken a feasibility study in respect of the project and has made a decision to mine,
or earlier at the Company’s election. The Company has up to 5 years from the date of
grant of the Option (DTM Period) to pay the deferred consideration. The DTM Period
will be automatically extended for further periods of six months each for material delays
in the Company obtaining relevant approvals for the Tenement. The amount of the
deferred consideration is $50 million, payable at the Company’s discretion in the form of
a minimum of $5 million in cash, and the balance in cash or Ventnor Shares (again, at
the Company’s discretion) at an issue price being the lower of: (i) the 30 day VWAP on
the date of payment; and (ii) 20 cents.
7
(e)
Royalty – In addition to the above, the Company will pay to AS an ongoing net
production royalty of 1%.
(f)
Board Appointments – The proposal does not include any appointment rights for AS
to the Ventnor board of directors or management team. No changes in that regard are
currently anticipated or planned by the Company.
(g)
Relinquishment of Project – If the Company does not pay the deferred consideration
within the DTM Period, the Company will be obliged to sell and re-transfer the Tenement
to AS or its nominee free of encumbrances for a consideration of $1.00. The Company
must not sell or transfer the Tenement during the DTM Period.
A corporate structure chart, post-completion of the acquisition of Wisecat, is set out in
Schedule 2.
Overview of the Silica Sand Market
Quartz is the most common silica crystal and the second most common mineral on the Earth's
surface. It is found in almost every type of rock: igneous, metamorphic, and sedimentary. While
quartz deposits are abundant, and quartz is present in some form in nearly all mining
operations, high purity and commercially viable deposits occur less frequently. Silica sand
deposits are most commonly surface-mined in open pit operations, but dredging and
underground mining methods are also employed.
Silica sand has supported human progress throughout history, being a key raw material in the
industrial development of the World, especially in the glass, metal casting, and ceramics
industries. Silica contributes to today's information technology revolution, being used in
computer components, providing raw materials for silicon chips and as quartz for PV panels.
Globally, silica sand is a strong growth mineral due to the demand by the construction sector,
wherein its use in the manufacture of flat glass for windows is constant. Greater growth is being
felt in the Asian market, particularly China where there is a massive glass manufacturing
expansion. There is also increased demand for specialised plate glass required in double
glazing created by Asian/Pacific governments in efforts to reduce energy demands. Developing
Asian markets have increasing demand for glass in their developing automobile industry.
Uses for silica sand include:
•
Glassmaking: Silica sand is the primary component of all types of standard and specialty
glass. It provides the essential SiO 2 component of glass formulation; its chemical purity is
the primary determinant of colour, clarity and strength in glass. Industrial sand is used to
produce flat glass for building and automotive use, container glass for foods and beverages,
and tableware.
•
Metal Casting: Industrial sand is an essential part of both the ferrous and non-ferrous
foundry industries. Metal parts ranging from engine blocks to sink faucets are cast in a
sand-and-clay mould to produce their external shape, using a resin-bonded core to create
the desired internal shape. Silica’s high fusion point (1760°C) and low rate of thermal
expansion produce stable cores and moulds compatible with all pouring temperatures.
•
Metallurgical Uses: In metal production, silica sand operates as a flux to lower the melting
point and viscosity of slag to make it more reactive and efficient. Lump silica is used either
alone or in conjunction with lime to achieve the desired base/acid ratio required for final
purification of metals.
•
Chemical Production: Silicon-based chemicals are found in thousands of everyday
applications ranging from food processing to soap and dye production. These chemicals
are used in products such as household and industrial cleaners, in the manufacture of fibre
optics, and to remove impurities from cooking oil and brewed beverages.
8
•
Paint and Coatings: Paint formulators select micron-sized industrial sands to improve the
appearance and durability of architectural and industrial paints and coatings. High purity
silica produces critical performance properties such as brightness reflectance and colour
consistency.
•
Ceramics: Ground silica is an essential component of the glaze and body formulations of
all types of ceramic products, including tableware, sanitary ware and floor and wall tile. In
the ceramic body, silica is the skeletal structure onto which clays and flux components
attach. Silica products are also used as the primary aggregate to provide high-temperature
resistance to acidic attack in industrial furnaces.
•
Filtration and Water Production: Industrial sand is used to filter water to become
drinkable. Uniform grain shapes and grain size distributions produce efficient filtration bed
operations for the removal of contaminants from wastewater to provide potable water. As
silica is chemically inert, it will not degrade or react when it comes in contact with acids,
contaminants, volatile organics, or solvents.
•
Oil and Gas Recovery: Known commonly as proppant, or “frac sand”, industrial sand is
pumped down holes in deep well applications to prop open rock fissures to increase the
flow rate of natural gas or oil. In this specialised application, round whole-grain sand is
used to maximise permeability and to prevent formation cuttings from entering the well bore.
Additionally, construction sand is the primary structural component in a wide variety of building
and construction products. Whole-grain silica is used in flooring compounds, mortars, specialty
cements, stucco, roofing shingles, skid-resistant surfaces, and asphalt mixtures to provide
packing density and flexural strength without adversely affecting the chemical properties of the
binding system. Ground silica performs as a functional extender to add durability, anti-corrosion
and weathering properties in epoxy-based compounds, sealants and caulks.
Supply issues are well publicised. Asian regional governments are recognising and
acknowledging that sand is a strategic resource, and are limiting exports. Prior mining
activities, such as river dredging, have caused significant environmental damage. Coastal
developments are increasing, reducing access to resources, and social pressure is mounting
against often illegal sand mining operations.
Rationalisation of major producers of silica sand has resulted in a relatively small number of
sand-producing corporations.
Key Asian markets for silica sand include:
•
Singapore: Singapore building construction uses one million tonnes of concrete a month,
which includes 300,000 tonnes of construction sand. Current sources are Malaysia,
Cambodia, Myanmar and occasionally Philippines. Other regional sources have placed
restrictions on or have totally banned exports of their local sand. Sources are generally
dredged from rivers with consequential unacceptable environmental impacts. The
Singapore Building and Construction Authority (BCA) has placed a requirement that 5% of
construction sand be imported from “non-traditional” sources which includes Australia.
Singapore is concerned that current sources may become unreliable or intermittent and is
actively encouraging a greater spread of sources. Singapore could be a significant market
for Australian suppliers.
•
India: The building expansion program underway has put incredible pressure on sand
suppliers for concrete, so much so that illegal dredging of rivers has resulted in recent public
scrutiny of the environmental long-term impacts. This is also potentially a significant market
for construction sand.
•
Vietnam: Vietnam has gone from an exporter of industrial sand, to an importer, with
increased use in concrete with a significant building boom underway.
9
The Company has engaged Stratum Resources, a Sydney-based consultancy specialising in
minerals management service and mineral economics in Asia and Australasia. Stratum has
estimated that the market for silica sand in the Asia/Pacific region is forecast to grow to 138
million tonnes per annum by the end of 2018, an increase of approximately 6% on 2017
demand.
Company Strategy
The Company has been investigating markets in the Asia-Pacific region for the supply of high
quality silica sand used for glass manufacturing, concrete construction and as a tech metal,
underpinned by increasing demand and diminishing supply, and intends to take advantage of
this environment with both the Muchea Silica Sand Project and the Company’s existing and
complementary Arrowsmith Silica Sand Project (announced to ASX on 12 October 2017).
Early indications, based on the Company’s due diligence investigations and the results of
testwork to-date, are that both projects are highly prospective, and the Muchea Silica Sand
Project is extensive and high grade, with the potential to be one of the largest high grade silica
sand deposits in the World.
The Company’s objectives are to progress both projects by conducting further exploration and
test work, conduct substantive environmental reviews and seek approvals, and to conduct
scoping studies to assess the economic viability of developing, in each case, a medium scale
mining and processing operation adjacent to each project and utilising existing rail and port
facilities to export high quality silica sand to Asian markets.
Results of testwork on the Arrowsmith project and plans for further work on the prospect were
announced to ASX on 30 January 2018.
On the Muchea project, the Company will in the near term assay the additional hand auger and
AC samples for QA/QC analysis to confirm the appropriate analytical techniques for
determination of SiO2 content in the deposit and final products. The Company will also acquire
high resolution data to determine the topographic surface at the deposit to an accuracy of ±0.1
metres to enable accurate auger and AC drill hole collar coordinates.
In addition, the Company will look to maintain its existing projects either through direct
exploration, joint venture, farm in and/or partial sale, and continue to review other exploration
projects (not necessarily only prospective for silica sands) that have the potential to have
economic resources in the project area. If the Muchea project proves to be uneconomic or for
any other reason the Company either does not exercise the Option or, if exercised, does not
pay the deferred consideration, the Company will continue to be an exploration company
focussed on its Arrowsmith project and the discovery and development of economic mineral
deposits (as it has been since listing on ASX in 2011) and will continue exploration activities on
its existing tenements and assess other projects in the normal course.
Key Risks and Dependencies
The key risks to the success of the Company and its plans can be summarised as follows:
(a)
Completion risk
Completion of the acquisition of the shares in Wisecat is conditional on the Company
re‐complying with Chapters 1 and 2 of the ASX Listing Rules. If the acquisition does
not proceed, the Company will not acquire the Option and, therefore, will have no
rights to the Muchea Silica Sands Project.
(b)
Re-quotation of shares on ASX
ASX requires the Company to re‐comply with Chapters 1 and 2 of the ASX Listing
Rules.
10
The Company will issue a notice of general meeting requiring shareholder approval
for the Company to acquire the shares in Wisecat and the Option, and a capital raising
under a prospectus to assist the Company to re‐comply with these requirements.
The Company’s shares are currently suspended from trading on ASX and it is
anticipated that the shares will remain suspended until completion of the capital
raising, re‐compliance by the Company with Chapters 1 and 2 of the ASX Listing
Rules and compliance with any further conditions ASX imposes on such
reinstatement.
There is a risk that the Company will not be able to satisfy one or more of those
requirements and that its shares will consequently remain suspended from quotation.
(c)
Exercise of Option and Payment of Deferred Consideration
The Option is currently held by Wisecat and the Company will have control of the
Option upon acquiring all of the issued shares in Wisecat.
The terms of the Option allow the Company to make a decision as to exercising the
Option at any time up to 2 years after grant date (ie 31 January 2020), subject to 6monthly extensions for material delays in the Company obtaining relevant approvals
for the Tenement.
There are many factors that will determine whether or not the Company exercises the
Option and there is no guarantee that the Company will exercise the Option. If the
Company does not exercise the Option within the Option term (as may be extended),
then the Option will lapse and the Company will have no rights to the Muchea Silica
Sands Project.
If the Company does exercise the Option and reaches a decision to mine (at any time
up to 5 years after grant date – 31 January 2023 – subject to 6-monthly extensions
for material delays in the Company obtaining relevant approvals for the Tenement)
the Company must pay deferred consideration for the purchase of the Tenement of
$50 million, of which a minimum of $5 million is payable in cash and the remaining
$45 million payable in either cash or fully paid ordinary shares in the Company (at the
Company’s discretion). Payment of the cash component of the deferred consideration
will be dependent on the Company’s cash reserves at the time and/or its ability to
raise funds which, if in the form of equity capital, will be dilutive to existing
shareholders. Further, any payment in shares may be dependent on shareholder
approval and there is no guarantee the shareholders will approve the issue of shares.
If the Company is unable to pay the deferred consideration, it must sell and re-transfer
the Tenement to AS for $1 and will have no further rights to the Muchea Silica Sands
Project.
If these circumstances, the Company will continue to be an exploration company
focussed on its Arrowsmith project and the discovery and development of economic
mineral deposits through exploration activities on its existing tenements and the
assessment of other projects in the normal course.
(d)
Title risk
Mining tenements are governed by the respective State legislation and each
tenement is held for a specific term and carries with it annual expenditure and
reporting commitments as well as other conditions requiring compliance. The grant
or maintenance of licences and obtaining renewals often depends on the Company
being successful in obtaining the required regulatory approvals for its proposed
activities. There is a risk that the Company could lose title to one or more of its
tenements if tenement conditions or annual expenditure commitments are not met.
11
(e)
Granting of licences, permits etc
The Company’s Arrowsmith project currently comprises applications for exploration
licences. The granting of the exploration licences requires the approval of the
Department of Mines, Industry Regulation and Safety. Whilst the Company sees no
impediment to the granting of exploration licences, there can be no guarantee that
the licences will be granted.
In addition, the Company will require numerous governmental, environmental, mining
permits, water rights and approvals authorising operations for mining and processing
facilities. A decision by a governmental agency or other third party to deny or delay
issuing a new or renewed permit or approval, or to revoke or substantially modify an
existing permit or approval, could have a material adverse effect on the ability to
continue operations. Furthermore, state and local governments could impose a
moratorium on mining operations in certain areas. Expansion of operations is also
predicated on securing the necessary environmental or other permits, water rights or
approvals, which may not be received in a timely manner or at all.
(f)
Exploration and Development Risks
Mineral exploration, development and mining are high-risk enterprises, only
occasionally providing high rewards. In addition to the normal competition for
prospective ground, and the high average costs of discovery of an economic deposit,
factors such as demand for commodities, stock market fluctuations affecting access
to new capital, sovereign risk, environmental issues, labour disruption, project
financing difficulties, foreign currency fluctuations and technical problems all affect
the ability of a company to profit from any discovery.
There is no assurance that exploration of the mineral interests currently held by the
Company, or any other projects that may be acquired in the future will result in the
discovery of an economically viable mineral deposit. Even if an apparently viable
mineral deposit is identified, there is no guarantee that it can be profitably exploited.
(g)
Resource and Reserve Estimates
Resource estimates are expressions of judgement based on knowledge, experience
and industry practice. Estimates that are valid when made may change significantly
when new information becomes available through drilling, sampling and similar
examinations.
In addition, resource estimates are necessarily imprecise and depend to some extent
on interpretations, which may prove to be inaccurate. Should the Company
encounter mineralisation or formations different from those predicted, resource
estimates may have to be adjusted and mining plans may have to be altered in a way
which could adversely affect the Company’s operations.
Reserve and resource estimates are expressions of judgment based on drilling
results and other exploration observations, along with a competent person’s
experience working with relevant mining properties, and other factors. Estimates
based on available data and interpretations and thus estimations may prove to be
inaccurate or may change substantially when new information becomes available.
The actual quality and characteristics of mineral deposits cannot be known until
mining takes place and will almost always differ from the assumptions used to
develop resources.
Reserves are value based financial and operational forecasts and, consequently, the
actual reserves and resources may differ from those estimated either positively or
negatively.
12
(h)
Operational Risks
The operations of the Company may be affected by various factors including failure
to locate or identify mineral deposits, failure to achieve predicted grades in
exploration or mining, operational and technical difficulties encountered in mining,
difficulties in commissioning and operating plant and equipment, mechanical failure
or plant breakdown, unanticipated metallurgical problems which may affect extraction
costs, adverse weather conditions, industrial and environmental accidents, industrial
disputes and unexpected shortages or increases in the costs of consumables, spare
parts, plant and equipment, fire, explosions and other incidents beyond the control of
the Company.
These risks and hazards could also result in damage to, or destruction of, production
facilities, personal injury, environmental damage, business interruption, monetary
losses and possible legal liability. While the Company currently intends to maintain
insurance within ranges of coverage consistent with industry practice, no assurance
can be given that the Company will be able to obtain such insurance coverage at
reasonable rates (or at all), or that any coverage it obtains will be adequate and
available to cover any such claims.
(i)
Environmental Risks
The operations and proposed activities of the Company are subject to regulations
concerning the environment. The government and other authorities that administer
and enforce environmental laws determine these requirements. As with all
exploration projects and mining operations, the Company’s activities are expected to
have an impact on the environment, particularly if mine development proceeds. The
Company intends to conduct its activities in an environmentally responsible manner
and in accordance with applicable laws.
The cost and complexity of complying with the applicable environmental laws and
regulations may prevent the Company from being able to develop potentially
economically viable mineral deposits.
Further, the Company will require approval from the relevant authorities before it can
undertake activities that are likely to impact the environment. Failure to obtain such
approvals will prevent the Company from undertaking its desired activities.
Environmental matters applicable to both the Arrowsmith and Muchea projects are
within the remit of Commonwealth and State authorities, including legislation in the
form of the Environment Protection and Biodiversity Conservation Act 1999 (Cth)
(EPBC Act) and the Environmental Protection Act 1986 (WA). The Company will
need to seek pre-approval on environmental matters for any mining operations and
the Environmental Protection Authority will, among other things, assess the impact of
proposed activities on matters of national environmental significance under the EPBC
Act as part of an accredited assessment.
In addition, future legislation and regulations governing mineral exploration and
production may impose significant environmental obligations on the Company. The
Company is unable to predict the effect of additional environmental laws and
regulations, which may be adopted in the future, including whether any such laws or
regulations would materially increase the Company’s cost of doing bus
Share your feedback
Discover