Arrowsmith Central
The Arrowsmith Central Silica Sand Project is located just 30km from the Arrowsmith North Project, and is broadly similar in grade purity. Like Arrowsmith North,the project is immediately adjacent to the Eneabba-Geraldton rail line and bulk export products from Geraldton.
Arrowsmith Central has a Total Mineral Resource of 76.5 MT at 96.6% SiO2, and a Total Ore Reserve of 18.9 MT at 99.6% SiO2. Like Arrowsmith North, Arrowsmith Central will be a 2Mtpa operation with a low CapEx of about $40m. The project is expected to generate more than $2.1bn in revenue over an initial 25-year mine life.
The Resource at Arrowsmith Central constitutes a small portion of the tenement area, selected for initial mining studies. The Company believes this Resource can be substantially increased with further aircore drilling over an increased area in the future.
Permitting at Arrowsmith Central has commenced and is in progress. The company has submitted the Environmental Scoping Document (ESD) to the EPA which details the environmental studies required to allow the assessment of the project. Approval of the ESD will provide the company with an indicative timetable for final environmental approvals.